  1. Slide 1: Advancing Our Organic Growth Strategy

    Slide 1: Advancing Our Organic Growth Strategy

    Advancing Our Organic Growth Strategy Rod Antal President & Chief Executive Officer January 2017 TSX: ASR / ASX: AQG / 1

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking information”) within the meaning of

  3. Slide 3: Advancing Our Strategy

    Slide 3: Advancing Our Strategy

    Advancing Our Strategy  Turkey Regional Exploration delivers organic growth through Gediktepe PFS  Çakmaktepe initial Resource in Çöpler District confirms potential to add oxide production in 2018  Sulfide Project construction full- steam ahead  Çöpler oxides generate cash flow Attractive and Gr

  4. Slide 4: 2016 Highlights

    Slide 4: 2016 Highlights

    2016 Highlights Strategic Operational Financial  Sulfide Project advancing  Produced 119,036 gold ozs  Cash of $215M at on time and on budget  Preliminary Total Cash December 31, 2016  Initial Resource for Çöpler Costs1 of $730/oz and  $350M undrawn finance District confirms satellite AISC1 of

  5. Slide 5: Stronger 2017 Production – 2017 Guidance

    Slide 5: Stronger 2017 Production – 2017 Guidance

    Stronger 2017 Production 2017 Guidance Oxide ore tonnes treated (M) 6 Oxide ore grade (gpt gold) 1.15 Heap-leach gold ounces produced1 (100%) (‘000’s) 160 to 180 Heap-leach gold ounces produced (attributable) 2 (‘000’s) 128 to 144 Total Cash Costs (C2)1,3 ($/oz) 500 to 550 All-in Sustaining Costs3 (

  6. Slide 6: Çöpler Sulfide Expansion Project Construction Underway

    Slide 6: Çöpler Sulfide Expansion Project Construction Underway

    Çöpler Sulfide Expansion Project Construction Underway  Civil works advancing rapidly  Project costs of $114M incurred as of September 30  Project remains on budget at $744M  All major equipment purchase orders complete TSX: ASR / ASX: AQG / 6

  7. Slide 7: Çöpler Sulfide Expansion Project

    Slide 7: Çöpler Sulfide Expansion Project

    Çöpler Sulfide Expansion Project Grinding Circuit  Earthworks complete  Camp construction progressing, with over 600 beds available  Oxygen plant construction commenced Autoclave at Samsun Port in Turkey  Installation of flash vessels commenced  Autoclaves expected on site Q1 2017  Project rem

  8. Slide 8: Çöpler Sulfide Expansion Project

    Slide 8: Çöpler Sulfide Expansion Project

    Çöpler Sulfide Expansion Project Pressure Oxidation Building Pressure Oxidation Building Sulfide Project Provides Substantial Growth with Significant Margins  Total production of 4M ozs1 over the remaining +20 year mine life  Average life-of-mine Total Cash Costs2 of $570/oz and AISC2 of $645/oz 

  9. Slide 9: Çöpler District Initial Resource Confirms Satellite Oxide Potential

    Slide 9: Çöpler District Initial Resource Confirms Satellite Oxide Potential

    Çöpler District Initial Resource Confirms Satellite Oxide Potential Çakmaktepe Central Çakmaktepe North  Initial Resource of Measured & Indicated of 140,000 contained ounces1  Potential to add oxide production within 2 years from existing Çöpler infrastructure  Resource remains open 1 See Alacer

  10. Slide 10: Çakmaktepe Central Provides Resource Growth Potential

    Slide 10: Çakmaktepe Central Provides Resource Growth Potential

    Çakmaktepe Central Provides Resource Growth Potential  Çakmaktepe Central late 2016 discovery; not included in initial Resource  Encountered high-grade oxide gold at surface  Work to date identified mineralization from 5m to over 20m thick over a 400m strike length  Remains open in all direction

  11. Slide 11: Gediktepe Project Delivers Organic Growth Potential

    Slide 11: Gediktepe Project Delivers Organic Growth Potential

    Gediktepe Project Delivers Organic Growth Potential  PFS defined Project as technically and economically viable  Alacer owns 50% with JV Partner Lidya Mining1  Life-of-mine payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 780M lbs of zinc2  Life-of-mine production

  12. Slide 12: Gediktepe Project Provides Strong Returns

    Slide 12: Gediktepe Project Provides Strong Returns

    Gediktepe Project Provides Strong Returns Gediktepe Production Profile (100% Basis) Life-of-Mine Project Metrics1 (100% Basis) 250 Pre-production capital $120M Additional capital for sulfide plant $126M 200 Gold Equivalent Ounce2 (000 oz) Project payback 2.5 years 150 After-tax free cash flow $745M

  13. Slide 13: Advancing Our Strategy

    Slide 13: Advancing Our Strategy

    Advancing Our Strategy  Çöpler oxide production has provided foundation for growth  Sulfide Project construction advancing rapidly  Initial Resource for Çöpler District confirms satellite oxide potential  Gediktepe is progressing into detailed study phase TSX: ASR / ASX: AQG / 13

  14. Slide 14: Contact

    Slide 14: Contact

    Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 14

  15. Slide 15: Appendix

    Slide 15: Appendix

    Appendix TSX: ASR / ASX: AQG / 15

  16. Slide 16: Company Snapshot

    Slide 16: Company Snapshot

    Company Snapshot Simple Capital Structure Corporate / Asset Location Market Cap C$725M Corporate Head Office Shares on issue 292M Denver, Colorado Turkey Fully Diluted 295M Turnover 5.5M shares/day Project Turkey Office Office Cash US$254M at 9/30/16 Debt Nil Finance Facility $350M1 1 Advances under

  17. Slide 17: Çöpler Geology – Plan of Deposit

    Slide 17: Çöpler Geology – Plan of Deposit

    Çöpler Geology – Plan of Deposit TSX: ASR / ASX: AQG / 17

  18. Slide 18: Çöpler Mineral Resources

    Slide 18: Çöpler Mineral Resources

    Çöpler Mineral Resources Mineral Resources Statement for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Material Tonnes Au Contained Au Gold Cut-off Grade (g/t) Resources Category Material Ag (g/t) Cu (%) Type (x1000) (g/t) Ounces Measured - - - - - Indicated 24,959 1.04 3.19 0.13 836,000

  19. Slide 19: Çöpler Mineral Reserves

    Slide 19: Çöpler Mineral Reserves

    Çöpler Mineral Reserves Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Mineral Reserves Contained Au Recoverable Au Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Category Material Ounces Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 17,836 1.13 3.53 0.1

  20. Slide 20: Initial Mineral Resource for Çöpler District

    Slide 20: Initial Mineral Resource for Çöpler District

    Initial Mineral Resource for Çöpler District Mineral Resource for Çöpler Near-Mine Deposits (As of December 31, 2016) Material Resource Category Tonnes Contained Au Deposit Au (g/t) Ag (g/t) Type Material (x1000) Ounces Measured - - - - Çakmaktepe & Indicated 2,422 1.80 11.53 140,000 Bayramdere Oxid

  21. Slide 21: Gediktepe Project Site

    Slide 21: Gediktepe Project Site

    Gediktepe Project Site Oxide Zone Plant Area Main Zone ( North ) TSX: ASR / ASX: AQG / 21

  22. Slide 22: Gediktepe Long Drill Section Looking NW

    Slide 22: Gediktepe Long Drill Section Looking NW

    Gediktepe Long Drill Section Looking NW See Alacer announcements “Alacer Announces Exploration Results in Turkey”, dated September 14, 2014 and February 24, 2014, on the Corporation’s website at www.alacergold.com, on SEDAR at www.sedar.com or on ASX at www.asx.com.au. TSX: ASR / ASX: AQG / 22

  23. Slide 23: Gediktepe Mineral Resources

    Slide 23: Gediktepe Mineral Resources

    Gediktepe Mineral Resources Mineral Resources Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Head Grades Contained Metal Material Type NSR Cutoff Tonnages Au Ag Cu Zn Au Ag Cu Zn Classification $/t ktonnes gm/t gm/t % % koz koz klb klb Oxides Measured $11.70 1,722 2.645 66.5 0

  24. Slide 24: Gediktepe Mineral Reserves

    Slide 24: Gediktepe Mineral Reserves

    Gediktepe Mineral Reserves Mineral Reserves Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Cutoff Oxide Mineral Reserves Payable Metal Classification NSR Oxide Gold Silver Copper Zinc Gold Silver Copper Zinc $/Tonne Ktonnes gm/t gm/t % % Kozs Kozs Mlbs Mlbs Proven 15.16 1,456