Panoro Minerals Ltd. · TSXV:PML

Panoro Minerals — Investor Presentation (April 2013)

21 slides from Panoro Minerals's investor presentation, April 2013

  1. Slide 1: Panoro Minerals Ltd – On the Road to Development

    PA NORO MINERALS LTD on the road to development April 2013 PANORO.COM TSXV:PML

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties. All statements within, other than statements of historical fact, are to be considered forward looking. Such forward-looking infor

  3. Slide 3: Investments Highlights

    Investments Highlights • Key Copper Projects in Emerging District in Peru • Cotabambas Cu/Au/Ag Project ₋ Inferred resource of 404.1 Mt @ 0.42% Cu and 0.23 g/t Au and 2.84 g/t Ag (@0.20% Cueq) ₋ 0.65% Cueq ₋ High Grade Pit 199.8 Mt @ 0.54% Cu, 0.30 g/t Au and 3.19 g/t Ag (@ 0.40% Cueq cut-off) ₋ 0.8

  4. Slide 4: Capital Structure and Share Performance

    Capital Structure and Share Performance Capital Structure Share SharePerformance Performance Tickers TSX-V:PML Lima:PML Frankfurt:PZM Share Price $0.45 52 Week Low-High $0.41 – $0.86 Shares Issued 204.7million Fully Diluted Issued 232.5million Market Capitalization $92 million Cash $20 million (As o

  5. Slide 5: Management and Directors

    Management and Directors Management • Luquman Shaheen, P.Eng., M.B.A │ President, CEO, Director - Over 20 years experience in Mining Sector, 16 years experience in Peru and Latin America • David W. Huber, C.A. │ CFO - 13 years professional accounting experience, 7 years as CFO, Corporate Secretary •

  6. Slide 6: Peru – Onwards to No.1 in Copper Mining

    Peru – Onwards to No.1 in Copper Mining • National Goal of Becoming Worlds Largest Copper Producing Nation • Panoro 100% Focused on Peru • Cotabambas Porphyry Project (100% Owned) • World Class Cu/Au/Ag Project • Significant Exploration Potential • 2013 PEA completion • 2014 Commence Feasibility • A

  7. Slide 7: Panoro Projects’ District Potential

    Panoro Projects’ District Potential Development of Prolific Copper Region to National Goal of No. 1 in Copper Mining • Xstrata, Las Bambas - 1.1Bt - $5.2 B development advancing • Xstrata, Antapaccay - $1.5 B development completed • Grupo Mexico, Los Chancas - 250 Mt • First Quantum Minerals - Haqui

  8. Slide 8: Cotabambas Project - Overview

    Cotabambas Project - Overview • Advanced stage copper-gold exploration project • 11 exploration concessions covering 14,900 hectares • Two Copper-gold porphyry deposits - Ccalla Deposit, main deposit - Azulccaca Deposit • Each deposit sits along trend of over 1.5 km length • Three other porphyry tar

  9. Slide 9: Cotabambas Project Deposit Resource Estimate and Expansion

    Cotabambas Project Deposit Resource Estimate and Expansion • 24,400 m exploration program completed July 2012 • 30,000 m drilling completed March 2013 • 17,785 m included in resource estimate - In addition to 9,923 of legacy drilling Ccalla Deposit High Grade Resource Limits Zones Open • Contained M

  10. Slide 10: Cotabambas Project – Discovery East of Ccalla from CB-68

    Cotabambas Project – Discovery East of Ccalla from CB-68 Total Resource Pit Shell Potential Supergene zones to be tested High Grade Pit Shell • CB-68 1,181 m @ 0.32% Cu, 0.10 g/t Au, 3 g/t Ag; including • 92 m @ 0.65% Cu, 0.11 g/t Au, 2 g/t Ag • 65 m @ 0.83% Cu, 0.13 g/t Au, 2 g/t Ag • 30 m @ 0.78%

  11. Slide 11: Confirming Continuity to North with Higher Grades

    Confirming Continuity to North with Higher Grades Discovering new features to Ccalla Deposit • Gold Enriched Leach Cap to North • Open to north • Near/at surface • 74 m intersection • 1.17 g/t Au and 5.0 g/t Ag • Supergene Enriched Zone • 92 m intersection • 1.55% Cu and 0.51 g/t Au • Mineralization

  12. Slide 12: Significant Expansion Potential

    Significant Expansion Potential • High chargeability anomalies identifying: - pyrite halo around Ccalla Porphyry deposit - lateral expansion potential of Ccalla deposit - Target area for +/- 200 Mt • Low chargeability anomalies identifying: - NE-SW trend of Ccalla deposit - Correspond to areas of hi

  13. Slide 13: Cotabambas Project – Work Plan and Budget

    Cotabambas Project – Work Plan and Budget 2010 – 2012 Completed Program 2012 – 2013 Expanded Program • 24,400 m, 39 Drill Hole Program • Up to 30,000 m drilling, 25,000m completed - step out and infill drilling 1. Delineate high grade supergene and oxide zones - primarily at Ccalla deposit to N at C

  14. Slide 14: Antilla Project – Overview

    Antilla Project – Overview • Advanced stage copper-molybdenum exploration project • Located 140 km southwest of the City of Cusco, Southern Peru • 12 mineral concessions covering 7,500 hectares • Inferred resource estimate of 154.4 million tonnes at an average grade of 0.47% cu and 0.009% Mo - Curre

  15. Slide 15: Antilla Project – Resource Estimate Summary

    Antilla Project – Resource Estimate Summary Antilla East Block Inferred Resource Estimate Source: August 2009 NI 43-101 Technical Report prepared by AMEC Americas Ltd. • Completed 67 drill holes 15,332m - 48 drill holes from Panoro’s 2008 drilling program - 19 drill holes from CDLM drilling programs

  16. Slide 16: Antilla Project – Conceptual Site Layout

    Antilla Project – Conceptual Site Layout Conceptual Site Plan Map • 15 km access road from Provincial road to site Provincial Road • 220 kV power line substation 30 Km Open Pit Resource Potential • Water supply from local water coarse • Mill and Plantsite locations identified Waste Rock Pile • Taili

  17. Slide 17: Antilla Project – East Block Sections

    Antilla Project – East Block Sections • Mineralization at surface at downhill side • 150 m typical depth to bottom of mineralization • Potential to increase grade of high grade zone with infill drilling • Mineralization open at uphill side, north, and to the east Section 0 Section 300W Page 17

  18. Slide 18: Financed to Advance Significant Project Pipeline

    Project FinancedPipeline to Advance Significant Project Pipeline Development Feasibility Cotabambas Antilla Advanced Exploration El Rosal Chap. – Chapi Minera IRL JV Cochasayhuas Utupara Minera IRL JV Early Exploration Alicia Checca Level 2 Prospects Kusiorcco Teck-Strait Gold JV Pistoro Norte Prome

  19. Slide 19: Growing Analysts’ Coverage and Investment Banking Support

    Growing Analysts’ Coverage and Investment Banking Support Page 19

  20. Slide 20: Conclusion

    Conclusion Cotabambas Cu/Au/Ag Project Scoping studies to be completed and commence feasibility programs in 2013 Antilla Cu/Mo Project Potential to double Arbitration and upgrade completed Sept 2012,current resourceresource at its estimate and PEA100% owned planning Cotabambas project Highly Antilla

  21. Slide 21: Contact

    TSXV:PML Frankfurt:PZM BVL:PML For further information, contact: Luquman Shaheen, President and CEO Phone: 604.684.4246 Email: info@panoro.com Web: www.panoro.com