Panoro Minerals Ltd. · TSXV:PML

Panoro Minerals — Investor Presentation (February 2026)

25 slides from Panoro Minerals's investor presentation, February 2026

  1. Slide 1: Developing Peru's Next Copper/Gold Mine

    TSX-V: PML BVL: PML OTC: POROF FSE: PZM DEVELOPING PERU’s NEXT COPPER/GOLD MINE Corporate Presentation February 2026

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements CAUTION REGARDING FORWARD LOOKING STATEMENTS: Information and statements contained in this presentation that are not historical facts are “forward-looking information” within the meaning of applicable Canadian securities legislation and involve risks and uncertainties. Exa

  3. Slide 3: Capital Structure & Share Performance

    Capital Structure & Share Performance Tickers TSX-V:PML BVL:PML FSE:PZM OTC:POROF Share Price $0.80 52 Week Low-High $0.86 - $0.27 Shares Issued 272.0M Options 14.0M Warrants 7.0M Fully Diluted 293.0M Market Capitalization Undiluted $218.0M Source: https://money.tmx.com/en/quote/PML Fully diluted $2

  4. Slide 4: Management & Directors – Peru Focused

    Management & Directors – Peru Focused MANAGEMENT DIRECTORS LUQUMAN SHAHEEN, PENG, PE, MBA – PRESIDENT & CHIEF EXECUTIVE OFFICER & KEITH PECK– CHAIRMAN DIRECTOR Over 40 years of Sr. Investment Banking experience, advising both public and 35 years experience in mining sector, 30 years experience in Pe

  5. Slide 5: High Grade Component

    High Grade Component Continuity and Growth Potential • Continuity • High Grade Starter North Pit of High High Grade South Pit Pit Potential at surface Grade • High Grade Below High Grade at surface PEA PIT • High Grade • Limited Pre- at Surface stripping • High Grade • Open to South Open at • More D

  6. Slide 6: Cotabambas Project

    Cotabambas Project High Grade & Clean Metallurgy Indicated Category1 High Grade Component Geometry • 129.0 Mt @ 1.29% Cueq or 1.07 g/t Aueq • Approaching 50/50 Copper to Precious Metals • Cu 2.0 B lbs (54%) • Near or at surface • Au 1.8 M oz (41%) • Both North and South Pits • Ag 17.1 M oz (5%) • Op

  7. Slide 7: Mineral Resource Growth Potential

    Mineral Resource Growth Potential Resource and Project Scale • High Grade open along strike • Open to South of South Pit • Open between North and South Pits TSXV-PML Page 7

  8. Slide 8: Mineral Resource Growth Potential

    Mineral Resource Growth Potential Resource and District Scale • 6 Targets to be drilled out • 19 Geologic • High Grade Corridor • 11 Targets yet to test Targets Identified Identified • Target 13 – Chaupec • 2 Included • Open Along ➢ Skarn at High Grade in Resource Strike • Target 7 – Tamburo • 6 dri

  9. Slide 9: Cotabambas Project

    Cotabambas Project • Increased M/I/I Resource 43% • Optimized Mine Plan • Increased Indicated Resource 333% • Reduce Initial Capital Cost Estimate • Increased High Grade Zone 247% ➢ Focus on High Grade Starter Pit • High Grade Zone Open • Improved Recoveries ➢ At depth • Optimize Site Infrastructure

  10. Slide 10: Mineral Resource Overview

    Mineral Resource Overview 2024 Update ❑ 1.0 Billion tonne Target Achieved ❑ High Grade Component of Mineral ❑ 507.3 Mt @ 0.34% Cu, 0.20 g/t Au, 2.42 g/t Ag Indicated ▪ 0.61% Cueq1 Resource ▪ 3.75 B lbs Cu ▪ 3.29 M oz Au ▪ 129.0 Mt @ 0.70% Cu, 0.44 g/t Au, ▪ 39.45 M oz Ag 4.12 g/t Ag, 0.0014% @ Indic

  11. Slide 11: Upcoming Milestones

    Upcoming Milestones ❑ Mine Plan Trade-off Study ❑ Drilling • High Grade Pit • Infill (5,000 m) • Lower Capex, Lower Throughput ➢ Upgrade High Grade to • Self Fund Expansion of Throughput Indicated and Measured at North Pit ❑ New PEA • Step-Out (5,000m) • Optimized High Grade Mine Plan ▪ High Grade e

  12. Slide 12: Strategic Project Location

    Strategic Project Location Southern Peru Copper Belt HEART OF PERU MINING CLUSTER ❑ Global copper mining sector heavily invested in southern Peru ❑ 12 large scale open pit copper mines/projects ❑ Panoro only exploration company with 100% control of advanced copper project ❑ Infrastructure in place:

  13. Slide 13: Northern Route to Marcona Port

    Northern Route to Marcona Port Kutuctay Bridge Completed ❑ Derisks Potential Operational and Construction Disruptions ❑ 2nd Corridor for Concentrate Shipments and Construction Access ❑ Public access bridge/road ❑ Funded through ‘Works for Taxes’ Program ❑ Located 10km East of Cotabambas Project TSXV

  14. Slide 14: Critical Infrastructure In Place & Growing

    Critical Infrastructure In Place & Growing Road and Port Alternatives Southern Route to Matarani Port Northern Route to Marcona Port • Existing • Alternate Road in access to place port in future • Used by • New bridge existing complete operating mines • Approach roads to • Access to north and Matara

  15. Slide 15: Strong Community Support

    Strong Community Support A Decade in the Making COCHAPPATTA COMMUNITY CONVENIO 9th Community Convenio at Project Land Purchase Local Labor Economic Support to Seniors Scholarships TSXV-PML Page 15

  16. Slide 16: Project Growth Areas

    Project Growth Areas Open to Southwest – Away from Developed Areas ENHANCED PERMITTING OUTLOOK • Pits constrained to avoid developed areas • Growth to southwest • no developed areas • Facilitate permitting of startup of project with high grade starter South Pit • Reduce initial Capital Cost • Self f

  17. Slide 17: Community Relocations Plan

    Community Relocations Plan Long Term Strategy Lands Acquired and Transferred to Communities : • Anta • 23,500 m2 • Ccalla Community • 2013 • Poroy • 41,000 m2 • Cochapata Community • 2018 • Proximity to Cusco City • 140 km from Cotabambas Project • Closer to Schools, Healthcare, Employment Options T

  18. Slide 18: Environmental Permits Expanded September 2024

    Environmental Permits Expanded September 2024 16 Years of Continuity Environmental Licensing – Growth and Stability 1. Cotabambas-Ccalla - Constancia de Aprobación 4. Cotabambas - Resolución Directoral N° 194-2012-MEM- Automática N° 062-2010-MEM-AAM del 4 de octubre AAM, del 12 de junio del 2012, Ap

  19. Slide 19: Environmental Permit Expansion Approved

    Environmental Permit Expansion Approved September 2024 • 3,076 ha under permit expanded by 3,512 ha • Total hectares: 6,588 • Covers 14 of 19 targets TSXV-PML Page 19

  20. Slide 20: Other Assets of Panoro Minerals

    Other Assets of Panoro Minerals Financing Options & Future Potential Antilla Project, Peru Copper Porphyry Projects, Peru • Payment #3 - $CA 7 M, June 2026 • Humamantata Project • Promesa Project • Payment #4 – up to $50 M • Anyo Project • All project located in Southern Peru • 10% Equity in Antilla

  21. Slide 21: Valuation (M US$)

    Cotabambas Project Resource In-Situ Valuation (US$) $1,200 $963 M7 Significant Upside from Current PML Valuation $ 4.73/share2,5,7 $1,000 ❑ Current PML Market Cap $118 M ❑ $ 0.60/share2,5 Valuation (M US$) $800 $487 M7 ❑ High Grade Component Valuation $ 2.38/share2,5,7 ▪ Approx 4 times Current $600

  22. Slide 22: Cotabambas Project & Peer Group: Cu and Au Grades

    Cotabambas Project & Peer Group Cu and Au Grades 0.70 • High Grade Component stands out 0.60 Cotabambas - HG • Demonstrates the important role HG will play in making the mine 0.50 Copper Grade (%) profitable Marimaca MCB AntaKori ➢ High IRR 0.40 La Verde Winu ➢ Short payback Altar Canariaco Norte Ha

  23. Slide 23: Cotabambas Project & Peer Group: Cueq Grades and Contained Metal

    Cotabambas Project & Peer Group Cueq Grades and Contained Metal 1.20 Cotabambas - HG ❑ High Grade Component 1.10 stands out 1.00 ❑ Top of Peer Group ❑ Strong Economics driven by 0.90 HG 0.80 ❑ Exposed at surface Cueq (%) 0.70 AntaKori Winu ❑ Mineable in early part Filo del Sol of mine life 0.60 MCB

  24. Slide 24: Mining in Peru

    Mining in Peru Road Map to Development and Stability • A country of 33.4 million • Peru maintains investment- • From pre-Inca times through • Peru is a global leader in the people grade credit rating since Inca, colonial and republican mining industry December 2009 matching periods mining has been o

  25. Slide 25: Contact

    Logo, icon Icon Icon Description automatically generated Description automatically generated Description automatically generated TSXV:PML For further information, contact: OTCQB:POROF Luquman Shaheen, President and CEO Phone: 604.684.4246 BVL:PML Email: info@panoro.com BORSE:PZM www.panoro.com TSXV-

Panoro Minerals — Investor Presentation (February 2026) on 6ix