  1. Slide 1: Peru's Next Copper/Gold Mine

    TSX-V: PML BVL: PML OTC: POROF FSE: PZM PERU’s NEXT COPPER/GOLD MINE LARGE SCALE DEPOSIT WITH A HIGH-GRADE CORE Corporate Presentation September 2026 (V2)

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements CAUTION REGARDING FORWARD LOOKING STATEMENTS: Information and statements contained in this presentation that are not historical facts are “forward-looking information” within the meaning of applicable Canadian securities legislation and involve risks and uncertainties. Exa

  3. Slide 3: The Cotabambas Project at a Glance

    The Cotabambas Project at a Glance What the deposit is, where it sits, who is building it, why communities back it, and what comes next Panoro Minerals — Cotabambas Project 1 THE PROJECT — what we own 2 THE REGION — where it sits 3 THE TEAM — who builds it • Billion-tonne inventory of Resources in P

  4. Slide 4: Mineral Resource Overview

    Mineral Resource Overview Effective 2024 BILLION TONNE TARGET ACHIEVED HIGH-GRADE COMPONENT OF MINERAL RESOURCE 507.3 Mt @ 0.33% Cu, 0.20 g/t Au, 2.42 g/t Ag, Indicated 129.0 Mt @ 0.70% Cu, 0.44 g/t Au, 4.12 g/t Ag, Indicated • 0.61% CuEq1 • 1.29% CuEq1; or • 3.75 B lbs Cu • 1.10 g/t AuEq • 3.29 M o

  5. Slide 5: The High-Grade Strategy

    The High-Grade Strategy Design the Cotabambas Project scale for Panoro to develop 1. Focus on the High-Grade component of the resource 4. Unfold the District Scale Potential • 222 million tonnes • 1.2% CuEq • Strip ratio less than 1.0 2. Drilling Programs to: • Define extent of high grades along str

  6. Slide 6: North Pit & South Pit

    North Pit & South Pit • Billion tonne inventory of resources • Low strip ration of 1.3:1 • High-Grade component along 1 km - 222 million tonnes at 1.2% CuEq • High-Grade corridor of 3 km - Open along strike - Open to south of South Pit - Open between the pits OPEN TSXV-PML Page 6

  7. Slide 7: North Pit & South Pit Sections

    North Pit & South Pit Sections Continuity and Growth Potential Conceptual High Grade High-Grade NORTH PIT at Surface SOUTH PIT Pit Limits High Grade at Surface Conceptual High-Grade Pit Limits Resource Pit Shell Resource Pit Shell Gaps in High Grade OPEN OPEN • Continuity of High-Grade • High-Grade

  8. Slide 8: Cotabambas South Pit Cross Section

    Cotabambas South Pit Cross Section Drillhole 228, Results June 2026 TSXV-PML Page 8

  9. Slide 9: Strategic Project Location

    Strategic Project Location Southern Peru Copper Cluster HEART OF PERU MINING CLUSTER • Global copper mining sector heavily invested in southern Peru • 12 large scale open pit copper mines/projects • Panoro only exploration company with 100% control of advanced copper project • Infrastructure in plac

  10. Slide 10: Infrastructure Improvements

    Infrastructure Improvements Two Access Roads & Two Ports Existing Southern Route to Port New Northern Route to Port Public Bridge / Road Matarani Port New Bridge and Alternate Access Road • Derisks Potential Operational and Construction Disruptions • 2nd Corridor for Concentrate Shipments and Constr

  11. Slide 11: 2026 Work Program

    2026 Work Program ❶ Step-out Drilling along 3 km of strike / 15,000 m / GROW High-Grade ❷ Infill Drilling at North Pit / 15,000 m / UPGRADE to Indicated Category ❸ Exploration Drilling at New Targets / 15,000 m / TEST for High-Grade ❹ Metallurgical Testing of High-Grade ❺ Ground Geophysics at new sk

  12. Slide 12: Key Priorities – Step-out and Infill Drilling

    Key Priorities – Step-out and Infill Drilling Previous High-Grade Intercepts Drillhole From To Intersection Cu Au Ag CuEq2 (m) (m) (m) (%) (g/t) (g/t) (%) CB-205 43.7 122.9 79.2 0.65 0.44 5.19 1.30% CB-206 3.8 345.4 341.7 0.56 0.40 2.75 1.10% 1.0% to 2.5% CuEq @ North Pit CB-207 117.4 207.1 89.7 0.5

  13. Slide 13: Mineral Resource Growth Potential

    Mineral Resource Growth Potential Resource and District Scale over 165 Km2 17 of 19 Targets yet to test 165 Km2 of Exploration Drill Targets for 2026 Concessions Target 7 – Tamburo Target 13 – Chaupec 12 Skarn at High-Grade Skarn at High-Grade 11 5 10 4 8 6 3 13 7 1 14 9 2 15 18 16 17 19 TSXV-PML Pa

  14. Slide 14: Target 13 - Chaupec

    Target 13 - Chaupec High Grade & Resource Growth Potential • Skarn mapped along 3 km of strike 3km - Three Zones - 15 Anomalies - Surface samples of : • + 7% Cu • + 500 g/t Ag • Geophysical anomalies indicating: - Porphyry stock 50m to 100m from surface • Five shallow drill holes intersected: - Mine

  15. Slide 15: Target 7 - Tamburo

    Target 7 - Tamburo High-Grade & Resource Growth Potential Porphyry & Skarn at Surface HIGH GRADE SKARN POTENTIAL TO DEPTH Four zones of Mineralization sampled at surface: • Zone 1: 19% Cu, 65 g/t Ag, 0.17 g/t Au • Zone 2: 7% Cu, 100 g/t Ag, 0.68 g/t Au • Zone 3: 11% Cu, 27 g/t Ag, 0.21 g/t Au • Zone

  16. Slide 16: Conceptual Cotabambas Project Design

    Conceptual Cotabambas Project Design Targeting potential future development of a low-cost, High-Grade mine • Capital efficient, targeting <US$700 M initial capital cost • Produce a single concentrate - No deleterious elements • Potential for short payback • Small footprint • Anticipated long LOM • E

  17. Slide 17: Mining in Peru

    Mining in Peru Road Map to Development and Stability • A country of 33.4 million • Peru maintains investment- • From pre-Inca times through • Peru is a global leader in the people grade credit rating since Inca, colonial and republican mining industry December 2009 matching periods mining has been o

  18. Slide 18: Environmental Permits Expanded September 2024

    Environmental Permits Expanded September 2024 16 Years of Continuity Environmental Licensing – Growth and Stability 1. Cotabambas-Ccalla - Constancia de Aprobación 4. Cotabambas - Resolución Directoral N° 194-2012-MEM- Automática N° 062-2010-MEM-AAM del 4 de octubre AAM, del 12 de junio del 2012, Ap

  19. Slide 19: Social License

    Social License Community Support for Future Relocations COCHAPPATTA COMMUNITY CONVENIO 9th Community Convenio at Project LANDS ACQUIRED AND TRANSFERRED TO COMMUNITIES Anta • 23,500 m2 • Ccalla Community • 2013 Land Purchase Additional Purchase Poroy Scheduled for 2026 Local Labor • 41,000 m2 • Cocha

  20. Slide 20: High-Grade Distinguishes Cotabambas

    High-Grade Distinguishes Cotabambas • High-Grade component stands out among peers on both copper and gold grade • 17 of 19 targets are yet to be drilled, indicating significant resource growth potential TSXV-PML Page 20

  21. Slide 21: Copper Developers Valuation Comparison

    Copper Developers Valuation Comparison Peers Trading at up to 7X Panoro Valuation* Faraday 37.1 NGEx 28.5 Tintina 20.7 Northisle 13.0 Osisko 10.9 Regulus 9.8 Copper Fox 6.7 Pecoy 6.0 Panoro 5.2 Western Cu/Au 3.6 Atex 3.0 *In-situ value = market capitalization (C$) ÷ attributable recoverable copper-e

  22. Slide 22: Summary

    Summary No fatal flaws. Strong community support. Funded to the next milestones. Present High Value Cu/Au Project $26 M CASH ON HAND Secure Mining District 45,000m DRILLING PROGRAM Strong Local Team PEA & PFS TO COME Exceptional Community Relationships Advance the Project TOWARD FINANCING & POTENTIA

  23. Slide 23: Appendix

    Appendix Supporting Detail & Additional Disclosures TSXV-PML Page 23

  24. Slide 24: Capital Structure & Share Performance

    Capital Structure & Share Performance* Tickers TSX-V:PML I BVL:PML I FSE:PZM I OTC:POROF Share Price (August 31) C$1.86 52 Week Low-High C$0.28 - C$2.03 Shares Issued 309.2 M Options 19.6 M Warrants 17.7 M Compensation Options 1.3M Fully Diluted 347.8 M Market Capitalization Source: money.tmx.com/en

  25. Slide 25: Management & Directors – Peru Focused

    Management & Directors – Peru Focused LUQUMAN SHAHEEN, PENG, PE, MBA – PRESIDENT & CHIEF EXECUTIVE OFFICER & KEITH PECK– CHAIRMAN DIRECTOR Over 40 years of Sr. Investment Banking experience, advising both public 35 years experience in mining sector, 30 years experience in Peru and private companies

  26. Slide 26: SOUTH a

    SOUTH a iy, we x Mi) CB-230-26 ) ) Saal ©) Legend © ___Drillhole Executed © _ Drillhole 2026 @ __ Drilling in Progress [1 Resources pit 2023 [ ] High-Grade Pit Lithology [__] Overbuden HB Quartz Monzonite Early (HN Quartz Monzonite intermineral [HE Quartz Monzonte Late HR oQuartz Porphyry L] tatite

  27. Slide 27: HG HG 157 m @ 0.64% CuEq

    150 m HG 1,100 m HG 300 m 157 m @ 0.64% CuEq 550 m OPEN HG

  28. Slide 28: 69 m @ 0.62% CuEq HG OPEN

    120 m 69 m @ 0.62% CuEq 200 m HG OPEN 300 m

  29. Slide 29: Long Section

    1100 m OPEN OPEN 600m Long Section

  30. Slide 30: Contact

    Logo, icon Icon Icon Description automatically generated Description automatically generated Description automatically generated TSXV:PML For further information, contact: OTCQB:POROF Luquman Shaheen, President and CEO Phone: 604.684.4246 BVL:PML Email: info@panoro.com BORSE:PZM www.panoro.com TSXV-

Panoro Minerals — Investor Presentation (September 2026) on 6ix