Panoro Minerals Ltd. · TSXV:PML

Panoro Minerals — Investor Presentation (October 2025)

28 slides from Panoro Minerals's investor presentation, October 2025

  1. Slide 1: Developing Peru's Next Copper/Gold Mine

    TSX-V: PML BVL: PML OTC: POROF BORSE: PZM DEVELOPING PERU’s NEXT COPPER/GOLD MINE Corporate Presentation October 2025

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements CAUTION REGARDING FORWARD LOOKING STATEMENTS: Information and statements contained in this presentation that are not historical facts are “forward-looking information” within the meaning of applicable Canadian securities legislation and involve risks and uncertainties. Exa

  3. Slide 3: Capital Structure & Share Performance

    Capital Structure & Share Performance Tickers TSX-V:PML BVL:PML BORSE:PZM OTC:POROF Share Price $0.40 52 Week Low-High $0.65 - $0.27 Shares Issued 264.4 M Options 11.3 M Fully Diluted 275.6 M Market Capitalization Undiluted $106 M Source: https://www.stockwatch.com Fully diluted $110 M TSXV-PML Page

  4. Slide 4: Management & Directors – Peru Focussed

    Management & Directors – Peru Focussed MANAGEMENT DIRECTORS LUQUMAN SHAHEEN, PENG, PE, MBA – PRESIDENT & CHIEF EXECUTIVE AUGUSTO BAERTL – CHAIRMAN OFFICER & DIRECTOR Over 55 years of experience in the Peruvian and International 35 years experience in mining sector, 30 years Mining Sector experience

  5. Slide 5: Mineral Resource Overview

    Mineral Resource Overview 2024 Update q 1.0 Billion tonne Target Achieved q High Grade Component of Mineral q 507.3 Mt @ 0.34% Cu, 0.20 g/t Au, 2.42 g/t Ag Indicated § 0.61% Cueq1 Resource § 3.75 B lbs Cu § 3.29 M oz Au § 129.0 Mt @ 0.70% Cu, 0.44 g/t Au, § 39.45 M oz Ag 4.12 g/t Ag, 0.0014% @ Indic

  6. Slide 6: High Grade Component – Starter Pit

    High Grade Component – Starter Pit Continuity and Growth Potential • Continuity • High Grade Starter North Pit of High High Grade South Pit Pit Potential at surface Grade • High Grade Below High Grade at surface PEA PIT • High Grade • Limited Pre- at Surface stripping • High Grade • Open to South Op

  7. Slide 7: Cotabambas Project

    Cotabambas Project High Grade & Clean Metallurgy Indicated Category1 High Grade Component Geometry : • 129.0 Mt @ 1.29% Cueq or 1.07 g/t Aueq • Approaching 50/50 Copper to Precious Metals • Cu 2.0 B lbs (54%) • Near or at surface • Au 1.8 M oz (41%) • Both North and South Pits • Ag 17.1 M oz (5%) •

  8. Slide 8: Mineral Resource Growth Potential

    Mineral Resource Growth Potential Resource and Project Scale • High Grade • 19 Geologic 12 Targets Corridor 11 10 5 Identified Identified 7 6 4 1 3 • 2 Included • Open Along 13 in Resource 8 1 Strike 9 2 • 6 drilled 14 • High Grade at Block Model 15 • Growing 2 Limits at Project South 18 Potential O

  9. Slide 9: Cotabambas Project: Advancing Pre-Feasibility Study

    Cotabambas Project Advancing Pre-Feasibility Study 2024 Accomplishments 2025 Accomplishments • Optimized Mine Plan • Increased M/I/I Resource 43% • Reduce Initial Capital Cost Estimate • Increased Indicated Resource 333% o Focus on High Grade Starter Pit • Increased High Grade Zone 247% • Improved R

  10. Slide 10: Mine Plan Trade-off Study

    Mine Plan Trade-off Study Objectives and Targets(1) q Start Mine @ 40,000 tpd Reduce Initial Capital Cost § Grow to 80,000 tpd after 4+ years q Focus 40,000 tpd Mine Plan on High Grade Maximize Cash Flow in Early Zones Years of Operations (1) INITIAL (1) NPV (1) IRR (1) PAYBACK (1) NPV/CAPEX 7.5 CAP

  11. Slide 11: Multiple Value Added Optimizations

    Cotabambas Project Multiple Value Added Optimizations Target: $4,500 5.7X $3,950 $4,000 • 2.7 times to 5.7 times increase in After Tax NPV (Million USD) $2,097 $3,500 $3,000 NPV $129 $419 $564 $2,500 $390 $1,853 $1,285 PML Current Valuation : $2,000 2.7X $1,500 • 15% of 2015 PEA $1,000 $684 • 6% of

  12. Slide 12: Upcoming Milestones

    Upcoming Milestones Towards Pre-Feasibility q Mine Plan Trade-off Study q Prefeasibility Study § High Grade Starter Pit § Drilling § Lower Capex, Lower Throughput Starter Pit § Infill Drilling ~ 5,000 m § Self Fund Expansion of Throughput § Upgrade ~ 200Mt Inferred to Indicated q New PEA Category §

  13. Slide 13: Strategic Project Location

    Strategic Project Location Southern Peru Copper Belt HEART OF PERU MINING CLUSTER q Global copper mining sector heavily invested in southern Peru q 12 large scale open pit copper mines/projects q Panoro only exploration company with 100% control of advanced copper project q Infrastructure in place:

  14. Slide 14: Northern Route to Marcona Port

    Northern Route to Marcona Port Kutuctay Bridge Completed q Derisks Potential Operational and Construction Disruptions q 2nd Corridor for Concentrate Shipments and Construction Access q Public access bridge/road q Funded through ‘Works for Taxes’ Program q Located 10km East of Cotabambas Project TSXV

  15. Slide 15: Critical Infrastructure In Place & Growing

    Critical Infrastructure In Place & Growing Road and Port Alternatives Southern Route to Matarani Port Northern Route to Marcona Port • Existing • Alternate Road in access to place port in future • Used by • New bridge existing complete operating mines • Approach roads to • Access to north and Matara

  16. Slide 16: Strong Community Support

    Strong Community Support A Decade in the Making COCHAPPATTA COMMUNITY CONVENIO 9th Community Convenio at Project Land Purchase Local Labor Economic Support to Seniors Scholarships TSXV-PML Page 16

  17. Slide 17: Project Growth Areas

    Project Growth Areas Open to Southwest – Away from Developed Areas ENHANCED PERMITTING OUTLOOK • Pits constrained to avoid developed areas • Growth to southwest • no developed areas • Facilitate permitting of startup of project with high grade starter South Pit • Reduce initial Capital Cost • Self f

  18. Slide 18: Community Relocations Plan

    Community Relocations Plan Long Term Strategy Lands Acquired and Transferred to Communities : • Anta • 23,500 m2 • Ccalla Community • 2013 • Poroy • 41,000 m2 • Cochapata Community • 2018 • Proximity to Cusco City • 140 km from Cotabambas Project • Closer to Schools, Healthcare, Employment Options T

  19. Slide 19: Environmental Permits Expanded September 2024

    Environmental Permits Expanded September 2024 14 Years of Continuity Environmental Licensing – Historical 1. Cotabambas-Ccalla - Constancia de Aprobación 4. Cotabambas - Resolución Directoral N° 194-2012-MEM- Automática N° 062-2010-MEM-AAM del 4 de octubre AAM, del 12 de junio del 2012, Aprueba el E

  20. Slide 20: Environmental Permit Expansion Approved

    Environmental Permit Expansion Approved September 2024 • 3,076 ha under permit expanded by 3,512 ha • Total hectares: 6,588 • Covers 14 of 19 targets TSXV-PML Page 20

  21. Slide 21: 9 Years No Equity Financing

    9 Years No Equity Financing Strategic Relationships 2016 2017-2025 2026 Future q No Share Equity Issued since 2016 Share Equity $ 6.0 M1 q $CA 47.2 M Proceeds 2016 to 2025 § No Equity Issued $3.5 M $10.5 M $126 M2 q $CA 227 M future payments contracted $6.9 M § Not including NSR payments $50 M1,3 $1

  22. Slide 22: Other Assets of Panoro Minerals

    Other Assets of Panoro Minerals Financing Options & Future Potential Antilla Project, Peru Copper Porphyry Projects, Peru q Payment #3 - $CA 7 M q Humamantata Project q Promesa Project q Payment #4 – up to $50 M q Anyo Project § Due when Study complete § 13% of NPV less $CA 20 M q All project locate

  23. Slide 23: Current Valuation (CA$ cents/lb Cueq)

    Panoro Minerals & Peer Group Valuation per Contained Cueq 58 22 17 15 10.0 Current Valuation (CA$ cents/lb Cueq) 9.0 8.0 7.0 q Panoro Minerals trading at: 6.0 5.0 § 1/6 of Peer Group 4.0 Average 3.0 2.0 § 1/10 of Top of Peer 1.0 Group 0.0 M So Al NG So St Re Ko M Pa W So Ho Pa Al Ce Ca Lo No Al Fr a

  24. Slide 24: Cotabambas Project Resource In-Situ Valuation

    Cotabambas Project Resource In-Situ Valuation (US$) $1,200 $963 M7 Significant Upside from Current PML Valuation $ 4.73/share2,5,7 $1,000 q Current PML Market Cap $118 M q $ 0.60/share2,5 Valuation (M US$) $800 $487 M7 q High Grade Component Valuation $ 2.38/share2,5,7 § Approx 4 times Current $600

  25. Slide 25: Cotabambas Project & Peer Group Copper Grade

    Cotabambas Project & Peer Group Cu and Au Grades 0.70 q High Grade Component stands out 0.60 Cotabambas - HG q Demonstrates the important role HG will play in making the mine 0.50 profitable Copper Grade (%) MCB • High IRR 0.40 Marimaca AntaKori La Verde Winu • Short payback Altar Canariaco Norte Co

  26. Slide 26: Cotabambas Project & Peer Group

    Cotabambas Project & Peer Group Cueq Grades and Contained Metal 1.20 Cotabambas - HG q High Grade Component 1.10 stands out 1.00 q Top of Peer Group q Strong Economics driven by 0.90 HG 0.80 q Exposed at surface Cueq (%) 0.70 AntaKori Winu q Mineable in early part Filo del Sol of mine life 0.60 MCB

  27. Slide 27: Mining in Peru

    Mining in Peru Road Map to Development and Stability • A country of 33.4 million • Peru maintains investment- • From pre-Inca times through • Peru is a global leader in the people grade credit rating since Inca, colonial and republican mining industry December 2009 matching periods mining has been o

  28. Slide 28: Cotabambas Project – Contact

    PANGRO . MINERALS LTD COTABAMBAS PROJECT TSXV:PML . For further information, contact: OTCQB:POROF Luquman Shaheen, President and CEO Phone: 604.684.4246 BVL:PML a Email: info@panoro.com BORSE:PZMI WwWww.panoro.com