Alacer Gold — Corporate Update (September 2016)
23 slides from Alacer Gold's corporate update, September 2016

Slide 1: Gediktepe Project Update
Gediktepe Project Update September 2016 Rod Antal, President & Chief Executive Officer Stewart Beckman, Chief Operating Officer TSX: ASR / ASX: AQG / 1

Slide 2: Cautionary Statements
Cautionary Statements Forward-looking information includes statements concerning, among other things, preliminary cost reporting in this presentation, production, cost and capital expenditure guidance; ability to expand the current heap leach pad, development plans for processing sulfide ore at Çöpl

Slide 3: Alacer – Bringing our Strategy to Life
Alacer – Bringing our Strategy to Life Çöpler oxides continue to generate cash flow Sulfide Project full-steam ahead with construction Çöpler District third round drilling shows the potential to add oxide production by 2018 - Maiden Resource later this year Turkey Regional Exploration delive

Slide 4: Gediktepe – New Reserves Providing Future Growth
Gediktepe – New Reserves Providing Future Growth LoM payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 780M lbs of zinc1 Life-of-mine production >12 years of 1.8M ozs1 on a Gold Equivalent Ounce2 (“AuEq”) basis Pre-production capital expenditure of $120M An addi

Slide 5: Gediktepe Location & Overview
Gediktepe Location & Overview In the Balikesir Province, 370 km west of Ankara and 190 km south of Istanbul Alacer will own 50% with JV Partner Lidya Mining1 Lidya Mining is the operator 1 Alacer has exercised its claw-back option in the Gediktepe project and upon completion of the claw-back w

Slide 6: Gediktepe Project – From Grassroots Exploration to Reserve
Gediktepe Project – From Grassroots Exploration to Reserve 2012- early 2013 Target generation (geochemical sampling) April 2013 Phase 1 Drilling Program Begins Made Discovery in Hole #2 2014 – 2015 Resource Drilling1 August 2015 Drilling Cut-Off 2015 – 2016 Metallurgical Testin

Slide 7: Gediktepe Cross Section L450 NE – Looking NE
Gediktepe Cross Section L450 NE – Looking NE Drilled >58,000m & 490 holes through mid 2015 DRRC-002 Deposit remains 28m @ 0.5g/t Au, 0.6% Cu, 1.9% Zn open at depth DRD-043 2.6m @ 3g/t Au, 41g/t Ag DRD-081 5m @ 1.2g/t Au, 48g/t Ag, 1.4% Cu, DRD-080 20.1m @ 1.4g/t Au, 49g/t Ag, 0.7% Cu, DRD-060 20

Slide 8: Gediktepe Long Drill Section L4357675 N – Looking NW
Gediktepe Long Drill Section L4357675 N – Looking NW TSX: ASR / ASX: AQG / 8

Slide 9: Gediktepe Mineral Resources
Gediktepe Mineral Resources Mineral Resources Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Head Grades Contained Metal Material Type NSR Cutoff Tonnages Au Ag Cu Zn Au Ag Cu Zn Classification $/t ktonnes gm/t gm/t % % koz koz klb klb Oxides Measured $11.70 1,722 2.645 66.5 0

Slide 10: Gediktepe Mineral Reserves
Gediktepe Mineral Reserves Mineral Reserves Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Cutoff Oxide Mineral Reserves Payable Metal Classification NSR Oxide Gold Silver Copper Zinc Gold Silver Copper Zinc $/Tonne Ktonnes gm/t gm/t % % Kozs Kozs Mlbs Mlbs Proven 15.16 1,456

Slide 11: Oxide Processing Flowsheet
Oxide Processing Flowsheet Conventional Heap Leach Pad with Merrill Crowe Processing TSX: ASR / ASX: AQG / 11

Slide 12: Sulfide Processing Flowsheet
Sulfide Processing Flowsheet Conventional Two, Four Stage Flotation Circuits for Processing Sulfide Ore TSX: ASR / ASX: AQG / 12

Slide 13: Gediktepe Plan Map
Gediktepe Plan Map TSX: ASR / ASX: AQG / 13

Slide 14: Oxide Zone Plant Area
Gediktepe Oxide Zone Plant Area Main Zone ( North ) TSX: ASR / ASX: AQG / 14

Slide 15: Tailing Dam Area
Gediktepe Tailing Dam Area TSX: ASR / ASX: AQG / 15

Slide 16: Gediktepe Production
Gediktepe Production Gediktepe Production Profile (100% Basis1) 250,000 Gold Equivalent Ounce 200,000 150,000 100,000 50,000 - Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Gold Silver Copper Zinc Life-of-mine production of 1.8 million ounces AuEq2 Oxide

Slide 17: Production Continued
Gediktepe Production Continued Years 1 2 3 4 5 6 7 8 9 10 11 12 Total Oxide Ore Processed (Mt) 1.0 1.0 1.0 0.1 - - - - - - - - 3.2 Oxide Au Grade Processed (g/t) 2.1 3.7 3.0 3.1 - - - - - - - - 3.0 Oxide Ag Grade Processed (g/t) 65.0 85.9 76.7 111.1 - - - - - - - - 77.7 Sulfide Ore Processed (Mt) -

Slide 18: Project Capital Costs
Gediktepe Project Capital Costs Capital Cost Summary Project Area US$ millions (100%1) Oxide Processing Facility Plant $46 Infrastructure $35 Geotechnical and Project Engineering $7 Private Land Purchase $2 Pre-Production Mining $3 Contingency $18 Oxide Capital $111 Sulfide Processing Facility Plant

Slide 19: Operating Costs
Gediktepe Operating Costs LoM Project Cash Operating Costs1 Summary Oxide Ore Cash Operating Costs1 Summary Unit Cost Unit Cost Cash Operating Costs1 Per ounce AuEq2 $376 Mining per tonne mined $1.45 Royalties Per ounce AuEq2 $12 Total Cash Costs1 Per ounce AuEq2 $387 Oxide Ore Processing per tonne

Slide 20: Concentrate Treatment Costs and Refining Charges (TCRC)
Concentrate Treatment Costs and Refining Charges (TCRC) Assumptions for TCRC Terms Applied to Sulfide Ore Copper Conc Terms Cu Grade of 30.95% Zinc Conc Terms Zn Grade of 54.3% Copper: pay lesser of 96.5% or Cu content less 1% Zinc: Pay 85% of Zinc Content or Zn content less 8% Gold: pay lesser of 9

Slide 21: Economics
Gediktepe Economics Discount Rate NPV (US$M) Gold price of $1,250 per ounce Silver price of $18.25 per ounce 5.0% 475 Copper price of $2.75 per pound 7.5% 382 Zinc price of $1.00 per pound US$/Turkish Lira exchange rate: 3.0 10.0% 309 Sensitivity of After Tax NPV at 5% Discount Rate Sensit

Slide 22: Gediktepe – Next Steps
Gediktepe – Next Steps Progress into detailed study phase EIA approved – Applications for Forestry permits have started Development options will be evaluated TSX: ASR / ASX: AQG / 22

Slide 23: Contact
Contact Gediktepe For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 23
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017