  1. Slide 1: Gediktepe Project Update

    Slide 1: Gediktepe Project Update

    Gediktepe Project Update September 2016 Rod Antal, President & Chief Executive Officer Stewart Beckman, Chief Operating Officer TSX: ASR / ASX: AQG / 1

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements Forward-looking information includes statements concerning, among other things, preliminary cost reporting in this presentation, production, cost and capital expenditure guidance; ability to expand the current heap leach pad, development plans for processing sulfide ore at Çöpl

  3. Slide 3: Alacer – Bringing our Strategy to Life

    Slide 3: Alacer – Bringing our Strategy to Life

    Alacer – Bringing our Strategy to Life  Çöpler oxides continue to generate cash flow  Sulfide Project full-steam ahead with construction  Çöpler District third round drilling shows the potential to add oxide production by 2018 - Maiden Resource later this year  Turkey Regional Exploration delive

  4. Slide 4: Gediktepe – New Reserves Providing Future Growth

    Slide 4: Gediktepe – New Reserves Providing Future Growth

    Gediktepe – New Reserves Providing Future Growth  LoM payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 780M lbs of zinc1  Life-of-mine production >12 years of 1.8M ozs1 on a Gold Equivalent Ounce2 (“AuEq”) basis  Pre-production capital expenditure of $120M  An addi

  5. Slide 5: Gediktepe Location & Overview

    Slide 5: Gediktepe Location & Overview

    Gediktepe Location & Overview  In the Balikesir Province, 370 km west of Ankara and 190 km south of Istanbul  Alacer will own 50% with JV Partner Lidya Mining1  Lidya Mining is the operator 1 Alacer has exercised its claw-back option in the Gediktepe project and upon completion of the claw-back w

  6. Slide 6: Gediktepe Project – From Grassroots Exploration to Reserve

    Slide 6: Gediktepe Project – From Grassroots Exploration to Reserve

    Gediktepe Project – From Grassroots Exploration to Reserve  2012- early 2013  Target generation (geochemical sampling)  April 2013  Phase 1 Drilling Program Begins  Made Discovery in Hole #2  2014 – 2015  Resource Drilling1  August 2015  Drilling Cut-Off  2015 – 2016  Metallurgical Testin

  7. Slide 7: Gediktepe Cross Section L450 NE – Looking NE

    Slide 7: Gediktepe Cross Section L450 NE – Looking NE

    Gediktepe Cross Section L450 NE – Looking NE  Drilled >58,000m & 490 holes through mid 2015 DRRC-002  Deposit remains 28m @ 0.5g/t Au, 0.6% Cu, 1.9% Zn open at depth DRD-043 2.6m @ 3g/t Au, 41g/t Ag DRD-081 5m @ 1.2g/t Au, 48g/t Ag, 1.4% Cu, DRD-080 20.1m @ 1.4g/t Au, 49g/t Ag, 0.7% Cu, DRD-060 20

  8. Slide 8: Gediktepe Long Drill Section L4357675 N – Looking NW

    Slide 8: Gediktepe Long Drill Section L4357675 N – Looking NW

    Gediktepe Long Drill Section L4357675 N – Looking NW TSX: ASR / ASX: AQG / 8

  9. Slide 9: Gediktepe Mineral Resources

    Slide 9: Gediktepe Mineral Resources

    Gediktepe Mineral Resources Mineral Resources Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Head Grades Contained Metal Material Type NSR Cutoff Tonnages Au Ag Cu Zn Au Ag Cu Zn Classification $/t ktonnes gm/t gm/t % % koz koz klb klb Oxides Measured $11.70 1,722 2.645 66.5 0

  10. Slide 10: Gediktepe Mineral Reserves

    Slide 10: Gediktepe Mineral Reserves

    Gediktepe Mineral Reserves Mineral Reserves Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Cutoff Oxide Mineral Reserves Payable Metal Classification NSR Oxide Gold Silver Copper Zinc Gold Silver Copper Zinc $/Tonne Ktonnes gm/t gm/t % % Kozs Kozs Mlbs Mlbs Proven 15.16 1,456

  11. Slide 11: Oxide Processing Flowsheet

    Slide 11: Oxide Processing Flowsheet

    Oxide Processing Flowsheet Conventional Heap Leach Pad with Merrill Crowe Processing TSX: ASR / ASX: AQG / 11

  12. Slide 12: Sulfide Processing Flowsheet

    Slide 12: Sulfide Processing Flowsheet

    Sulfide Processing Flowsheet Conventional Two, Four Stage Flotation Circuits for Processing Sulfide Ore TSX: ASR / ASX: AQG / 12

  13. Slide 13: Gediktepe Plan Map

    Slide 13: Gediktepe Plan Map

    Gediktepe Plan Map TSX: ASR / ASX: AQG / 13

  14. Slide 14: Oxide Zone Plant Area

    Slide 14: Oxide Zone Plant Area

    Gediktepe Oxide Zone Plant Area Main Zone ( North ) TSX: ASR / ASX: AQG / 14

  15. Slide 15: Tailing Dam Area

    Slide 15: Tailing Dam Area

    Gediktepe Tailing Dam Area TSX: ASR / ASX: AQG / 15

  16. Slide 16: Gediktepe Production

    Slide 16: Gediktepe Production

    Gediktepe Production Gediktepe Production Profile (100% Basis1) 250,000 Gold Equivalent Ounce 200,000 150,000 100,000 50,000 - Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Gold Silver Copper Zinc  Life-of-mine production of 1.8 million ounces AuEq2  Oxide

  17. Slide 17: Production Continued

    Slide 17: Production Continued

    Gediktepe Production Continued Years 1 2 3 4 5 6 7 8 9 10 11 12 Total Oxide Ore Processed (Mt) 1.0 1.0 1.0 0.1 - - - - - - - - 3.2 Oxide Au Grade Processed (g/t) 2.1 3.7 3.0 3.1 - - - - - - - - 3.0 Oxide Ag Grade Processed (g/t) 65.0 85.9 76.7 111.1 - - - - - - - - 77.7 Sulfide Ore Processed (Mt) -

  18. Slide 18: Project Capital Costs

    Slide 18: Project Capital Costs

    Gediktepe Project Capital Costs Capital Cost Summary Project Area US$ millions (100%1) Oxide Processing Facility Plant $46 Infrastructure $35 Geotechnical and Project Engineering $7 Private Land Purchase $2 Pre-Production Mining $3 Contingency $18 Oxide Capital $111 Sulfide Processing Facility Plant

  19. Slide 19: Operating Costs

    Slide 19: Operating Costs

    Gediktepe Operating Costs LoM Project Cash Operating Costs1 Summary Oxide Ore Cash Operating Costs1 Summary Unit Cost Unit Cost Cash Operating Costs1 Per ounce AuEq2 $376 Mining per tonne mined $1.45 Royalties Per ounce AuEq2 $12 Total Cash Costs1 Per ounce AuEq2 $387 Oxide Ore Processing per tonne

  20. Slide 20: Concentrate Treatment Costs and Refining Charges (TCRC)

    Slide 20: Concentrate Treatment Costs and Refining Charges (TCRC)

    Concentrate Treatment Costs and Refining Charges (TCRC) Assumptions for TCRC Terms Applied to Sulfide Ore Copper Conc Terms Cu Grade of 30.95% Zinc Conc Terms Zn Grade of 54.3% Copper: pay lesser of 96.5% or Cu content less 1% Zinc: Pay 85% of Zinc Content or Zn content less 8% Gold: pay lesser of 9

  21. Slide 21: Economics

    Slide 21: Economics

    Gediktepe Economics Discount Rate NPV (US$M)  Gold price of $1,250 per ounce  Silver price of $18.25 per ounce 5.0% 475  Copper price of $2.75 per pound 7.5% 382  Zinc price of $1.00 per pound  US$/Turkish Lira exchange rate: 3.0 10.0% 309 Sensitivity of After Tax NPV at 5% Discount Rate Sensit

  22. Slide 22: Gediktepe – Next Steps

    Slide 22: Gediktepe – Next Steps

    Gediktepe – Next Steps  Progress into detailed study phase  EIA approved – Applications for Forestry permits have started  Development options will be evaluated TSX: ASR / ASX: AQG / 22

  23. Slide 23: Contact

    Slide 23: Contact

    Contact Gediktepe For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 23