Talisker Resources Ltd. · TSX:TSK
Talisker Resources — Investor Presentation (November 2024)
21 slides from Talisker Resources's investor presentation, November 2024
Slide 1: High-Grade Gold Production Corporate Presentation
TSX : TSK OTCQX : TSKFF High-Grade Gold Production Corporate Presentation November 2024 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 1
Slide 2: Forward-Looking Statements
Forward-Looking Statements Certain statements in this presentation constitute forward-looking information, which reflect the expectations of management Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance. The use of any of the words “could”, “
Slide 3: Rapid Pathway to High Margin Gold in 2025
Funded to Fully Permitted Key Indigenous 1.7Moz High- Production for Mining Agreements In Grade Resource $21M Cash place + clear resource expansion Rapid Pathway to High Margin Gold in 2025 Offsite Limited 100koz/y Self Funding Processing = Development to production Growth Low capex access ore = tar
Slide 4: Located in the Heart of BC Mining
Located in the Heart of BC Mining ▪ Highway Access ▪ Connected to Grid Power ▪ Multiple Toll Milling Facilities 4 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 4
Slide 5: Peer Group | Select North American Gold Companies
Peer Group | Select North American Gold Companies Significant re-rate potential for Talisker on an EV / oz basis Producers (EV / oz AuEq) (C$) $507 $323 $260 $81 Median: $66 $51 $41 $34 $14 $16 Wesdome Gold Fortitude Gold New Gold Orla Mining Elevation Gold i-80 Gold Ascot Resources McEwen Mining Ta
Slide 6: First Production Planned for Q1-2025
Discovery to Production in 5 years 2023 2024 2025 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 ✓ Results from ✓ Engineering Studies Drill Program 165,000m of Drilling ✓ Updated Mine Plan ✓ Ore Sale ✓ Mining Inaugural Resource ✓ Portal Construction Financing ✓ January 2023 Agreement Development Funding ✓ Decline Const
Slide 7: Value Proposition
Value Proposition Growing Production Profile Pathway to 100koz/y production in 4 years Analyst Coverage Target Price**** Large Exploration Upside** $2.00 5Moz+ upside based on historic drift assays and drilling + Strong pipeline of Greenfields Projects $2.00 Strong High-Grade Resource Base*** 1.7Moz
Slide 8: Share Structure and Capitalization
Share Structure and Capitalization Strong Institutional Shareholders Capital Structure (November 5th, 2024) Common Shares Outstanding 98,301,681 Warrants1 14,700,313 Options + RSUs 1,373,335 Fully Diluted Shares Outstanding 114,375,329 Market Capitalization (Nov 5th) ~$45 million (1) 5,679,600 of th
Slide 9: Bralorne - BC's Iconic Gold Camp
Bralorne - BC’s Iconic Gold Camp ▪ Over 40 years of production (1929-1971)- 4.2Moz @ 17.7g/t ▪ 2,300oz/vertical metre average ▪ Orogenic veins, structural continuity defined for 2.5 km along strike and 1.9 km depth ▪ Ore shoot continuity demonstrated for up to 1.5 km ▪ High-grade vein core surrounde
Slide 10: 2024 Resource Conversion Program
2024 Resource Conversion Program ▪ 129.99 g/t Au over 2.00 Metres ▪ 97.40 g/t Au over 2.00m within 38.17 g/t Au over 5.20m ▪ 86.50 g/t Au over 1.50 m within 14.31 g/t Au over 9.55m ▪ 80.68 g/t Au over 2.20m within 28.58 g/t Au over 6.35m ▪ 40.82 g/t Au over 2.60m within 8.54 g/t Au over 13.45m ▪ 37.
Slide 11: Clear Extensive Upside
Clear Extensive Upside 5.5km mineralized strike length King Mustang Bralorne Pioneer Mineralisation known to 2km depth TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 11
Slide 12: Bralorne District-Scale Upside
Bralorne District-Scale Upside ▪ 7 historical mines, 47 known mineral occurrences ▪ 33 km belt amalgamated by Talisker capturing mineralization associated with major suture zone ▪ Historic Resource 186Koz @ 9.1 g/t Au at Congress from surface to 200m * ▪ BRX first-pass drilling results up to 329 g/t
Slide 13: Ladner Gold Project
Ladner Gold Project ▪ 5 Historical Mines – 24 Known Gold Occurrences ▪ Compliant 691,540oz Inferred Gold Resource* ▪ Major Mines Permit (M-138) in place ▪ 144km2 contiguous land package – ~28kms x 5kms ▪ Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) ▪ Extensiv
Slide 14: Ladner Tailings JV
Ladner Tailings JV ▪ Signed LOI with Regeneration Enterprises to form JV to process tailings ▪ Regeneration to fund, Talisker to retain equipment and facilities ▪ Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU ▪ R
Slide 15: Corporate Head Office
TSX : TSK OTCQX : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 1T1 Terry Harbort, President and CEO +1(416) 357-0227 terry.harbort@taliskerresources.com 15 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 15
Slide 16: Endnotes
Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified p
Slide 17: Endnotes – continued
Endnotes – continued • High grade capping, supported by statistical analysis, was applied to composited data inside the high-grade quartz veins for Pioneer (1.4 m) at 100 g/t Au, Bralorne (1.4 m) at 100 g/t Au, Charlotte (1.0 m) at 31 g/t Au and King (1.2 m) at 110 g/t Au for the drill hole samples
Slide 18: Corporate Leadership
Corporate Leadership Management Andres Tinajero – CFO Leonardo de Souza – QP VP, Terry Harbort – CEO, President, ▪ MBA and Member, Canadian Institute of Exploration and Resource Development Director Chartered Professional Accountants, the ▪ 35 years experience in mineral exploration and 21 ▪ PhD in
Slide 19: Corporate Leadership – Non Executive Directors
Corporate Leadership Non Executive Directors Morris Prychidny (1)(2) Christy Smith (2)(3) Eric Tremblay (2*)(3*) Chairman ▪ 25 years of proven expertise working ▪ BSc. in mining engineering and mineral with natural resource companies and ▪ Chartered Accountant with 35+ years indigenous communities p
Slide 20: Bralorne Vein Array
Excellent mineability due to Parallel vein sets provide high-grade continuity, vein Bralorne Vein Array potential for numerous adjacent mining fronts structural continuity, high dip angle Cross Section (415,450 mE) Plan View Many veins defined to near surface Excellent structural continuity down dip
Slide 21: Bralorne Inaugural Mineral Resource Estimate (MRE)
Bralorne Inaugural Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) King Indicated Long Hole > 2.65 111,300 8.61 30,800 Cut and Fill > 3.10 5,900 13.45 2,600 Inferred Long Hole > 2.65 1,598,400 5.76 296,200 Cut and Fill >
Talisker Resources — Investor Presentation (November 2024) on 6ix