Talisker Resources Ltd. · TSX:TSK

Talisker Resources — Investor Presentation (March 2026)

23 slides from Talisker Resources's investor presentation, Mar 19, 2026

  1. Slide 1: Building the Foundation for Growth in 2026

    TSX : TSK OTCQB : TSKFF Building the Foundation for Growth in 2026 Corporate Presentation March 2026 TSX: TSK OTCQX: TSKFF 1

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Certain statements contained in this presentation constitute forward-looking information, which reflect the expectations of management Talisker Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance and matters that are

  3. Slide 3: Vision

    Vision To become a multi-mine gold producer by developing a district scale gold belt with planned production of more than 200,000 ounces of gold annually TSX: TSK OTCQX: TSKFF 3

  4. Slide 4: Share Structure and Capitalization

    Share Structure and Capitalization CAPITAL STRUCTURE (March 12, 2026) Shareholder Breakdown TSX /OTCQB Symbols TSK/TSKFF INSTITUTIONAL 53.4% 52 week high/low $2.35/0.38 INSIDERS 4.2% Cash position (October 2025) $75M RETAIL 42.5% Debt $1.6M Common Shares Outstanding 207M TSX: TSK 12 Month Performanc

  5. Slide 5: Located in the Heart of BC Mining

    Located in the Heart of BC Mining  Stable Tier 1 first world jurisdiction  Extensive mining infrastructure  Seamless logistics with abundant highway and rail access  Adjacent large-scale hydro-electric Infrastructure  Connected to reliable grid power  Processing via existing toll mills  Ready

  6. Slide 6: 2026 – Building the Foundation for Growth

    2026 – Building the Foundation for Growth 30,000m of resource conversion drilling Drilling 15,000m at Mustang (underground), 15,000m at Bralorne West (surface and underground) Advancing three ramps – Lower Mustang, Bralorne West, Brumby Development Lateral development preparing for increased product

  7. Slide 7: Positioned for Growth – 5 Year Plan

    Positioned for Growth – 5 Year Plan From Discovery to Production in 5 years 2030 2029 2028 2020 - 2025 2026 2027  Olympus ramp up to  Olympus mine starts 500 t/d  Initiation of mill  195,000 m of diamond drilling  PEA and Resource  Submit permit production  Congress PEA preconstruction Update

  8. Slide 8: Production Overview

    Production Overview Mid-Term Production Plan Bralorne West Brumby Access Decline Bralorne West Mustang LEGEND Lower Mustang Existing development Spiral Decline Year 1 - 5 Stopes Year 1-5 Development Bralorne West Location of current mining activities Spiral Declines TSX: TSK OTCQX: TSKFF 8

  9. Slide 9: 2026 Production - Mustang and Brumby Areas

    2026 Production - Mustang and Brumby Areas Continuation of Mustang Brumby production at Mustang with new levels 1045 and 1030 coming online First Brumby Production Stopes Brumby Decline 2026 Completed Development 2026 Lateral Development 2026 Waste Development Lower Mustang 2026 Production Stopes De

  10. Slide 10: 2026 Production - Bralorne West Area

    2026 Production - Bralorne West Area Bralorne West Completed Completed First Bralorne West Q4, 2025 Scheduled Q1, 2026 Lateral Development Production Stopes completion for 2027 and 2028 Q2, 2026 Production Bralorne West Access Decline 2026 Completed Development 2026 Lateral Development Bralorne West

  11. Slide 11: 2026 PEA and Mineral Resource Update

    2026 PEA and Mineral Resource Update Bralorne Gold Mines 2023 Mineral Resource and Undrilled Potential KING MUSTANG BRALORNE PIONEER Olympus Mine Plan Area POTENTIAL DEFINED BY HISTORIC DRIFT 2km ASSAYS UNDERGOING VALIDATION POTENTIAL DEFINED BY HISTORIC DRIFT POTENTIAL DEFINED BY HISTORIC DRIFT ASS

  12. Slide 12: Developing a Mining District

    Developing a Mining District  33km strike length mineralised district  14,000ha - 100% Talisker owned  47 known mineral occurrences and historic mines  Congress Historic Resource 186Koz @ 9.1 g/t Au from surface to 200m1  BRX first-pass drilling results up to 329 g/t Au  Limited modern explora

  13. Slide 13: Compelling Value Proposition

    Compelling Value Proposition Robust, district-scale, multi-year growth story GROWING PRODUCTION PROFILE ■ Pathway to 100 koz/year by 2028 ■ Second Mine planned for 2029 LARGE EXPLORATION UPSIDE1 ■ 5 Moz+ upside based on historic drift assays and drilling ■ 33 km strike mineralised length of district

  14. Slide 14: Corporate Head Office

    TSX : TSK OTCQB : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 3P5 Lindsay Dunlop Vice President, Investor Relations +1(647) 274-8975 lindsay.dunlop@taliskerresources.com TSX: TSK OTCQX: TSKFF 14 14

  15. Slide 15: Corporate Leadership

    Corporate Leadership Management TERRY HARBORT ANDRES TINAJERO CEO, President, Director Chief Financial Officer  PhD in Structural Geology and Tectonics  MBA and Member, Canadian Institute of Chartered Professional  Co-founder and VP Exploration, Talisker Exploration Services Inc. Accountants, the

  16. Slide 16: Corporate Leadership – Management (continued)

    Corporate Leadership Management (continued) RICHARD MURRELL KYLE ORR General Manager - Bralorne Vice President, Exploration  30+ years of underground mining experience, specializing in  With Talisker since its founding, leading the design and execution of shaft sinking and tunnelling the 165,000m

  17. Slide 17: Corporate Leadership – Non-Executive Directors

    Corporate Leadership Non-Executive Directors MORRIS PRYCHIDNY (1)(2) TERRY HARBORT (3) STEPHEN BURLETON (1*) Chairman CEO, President, Director  Mining executive with significant experience in  Chartered Accountant with 35+ years experience in  PhD in Structural Geology and Tectonics capital raisi

  18. Slide 18: Bralorne Mineral Resource Estimate (MRE)

    Bralorne Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) Long Hole > 2.65 111,300 8.61 30,800 Indicated Cut and Fill > 3.10 5,900 13.45 2,600 KING Long Hole > 2.65 1,598,400 5.76 296,200 Inferred Cut and Fill > 3.10 76,0

  19. Slide 19: Bralorne

    Bralorne Largest gold camp in Western Canada  Historic output: 4.2 Moz at 17.7 g/t demonstrating exceptional grade and continuity  Proven ore continuity: 2,300 oz per vertical metre, from 2.5 km strike length to 1.9 km depth  High-grade cores with brecciated halos – advantageous for selective min

  20. Slide 20: Bralorne Vein Array

    Bralorne Vein Array Parallel vein sets provide potential for numerous adjacent mining fronts Cross Section (415,450 mE) Plan View Excellent mineability due to high-grade continuity, vein structural continuity, high dip angle Many veins defined to near surface Excellent structural continuity down dip

  21. Slide 21: Ladner Gold Project

    Ladner Gold Project  5 Historical Mines – 24 known Gold Occurrences  Compliant 691,540 oz Inferred Gold Resource*  Major Mines Permit (M-138) in place  144km2 contiguous land package – ~28kms x 5kms  Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt)  Extensi

  22. Slide 22: Ladner Tailings JV

    Ladner Tailings JV  Signed LOI with Regeneration Enterprises to form JV to process tailings  Regeneration to fund, Talisker to retain equipment and facilities  Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU  R

  23. Slide 23: Endnotes

    Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Resource Development, who is a “qualified person” within th

Talisker Resources — Investor Presentation (March 2026) on 6ix