Talisker Resources Ltd. · TSX:TSK
Talisker Resources — Investor Presentation (May 2026)
22 slides from Talisker Resources's investor presentation, May 2026
Slide 1: Building the Foundation for Growth in 2026
TSX : TSK OTCQB : TSKFF Building the Foundation for Growth in 2026 Corporate Presentation May 2026 TSX: TSK OTCQX: TSKFF 1
Slide 2: Forward-Looking Statements
Forward-Looking Statements Certain statements contained in this presentation constitute forward-looking information, which reflect the expectations of management Talisker Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance and matters that are
Slide 3: Vision
Vision To become a multi-mine gold producer by developing a district scale gold belt with production of more than 200,000 ounces of gold annually TSX: TSK OTCQX: TSKFF 3
Slide 4: Share Structure and Capitalization
Share Structure and Capitalization CAPITAL STRUCTURE (May 14, 2026) Shareholder Breakdown TSX /OTCQB Symbols TSK/TSKFF INSTITUTIONAL 53.4% 52 week high/low $2.35/0.38 INSIDERS 4.2% Cash position (March 31, 2026) $61M RETAIL 42.5% Debt $1.6M Credit Facility (Undrawn) $35M TSX: TSK 12 Month Performanc
Slide 5: Located in the Heart of BC Mining
Located in the Heart of BC Mining Stable Tier 1 first world jurisdiction Extensive mining infrastructure Seamless logistics with abundant highway and rail access Adjacent large-scale hydro-electric Infrastructure Connected to reliable grid power Processing via existing toll mills Ready
Slide 6: Bralorne Mineral Resource Estimate (MRE)
Bralorne Mineral Resource Estimate (MRE)* Global resource increased by 100% Mass Average Grade Material Content Area Resource Class (Mt) (g/t Au) (oz Au) Measured 0.068 10.04 21,900 Indicated 0.333 9.49 101,700 MUSTANG M+I 0.401 9.58 123,600 Inferred 2.404 9.32 720,300 Indicated 0.319 8.07 82,700 OL
Slide 7: 2026 – Building the Foundation for Growth
2026 – Building the Foundation for Growth 30,000m of resource conversion drilling Drilling 15,000m at Mustang (underground), 15,000m at Bralorne West (surface and underground) Advancing three ramps – Lower Mustang, Bralorne West, Brumby Development Lateral development preparing for increased product
Slide 8: Production Overview
Production Overview Mid-Term Production Plan Bralorne West Brumby Access Decline Bralorne West Mustang LEGEND Lower Mustang Existing development Spiral Decline Year 1 - 5 Stopes Year 1-5 Development Bralorne West Location of current mining activities Spiral Declines TSX: TSK OTCQX: TSKFF 8
Slide 9: 2026 Production – Mustang Zone
2026 Production – Mustang Zone Mustang Continuation Of Production At Mustang with New Levels 1045 And 1030 Now Online 2026 Completed Development and Stopes 2026 Planned On-Vein Development 2026 Planned Capital Development Lower Mustang 2026 Planned Production Stopes Mined Out Area Decline Heading To
Slide 10: 2026 Production - Bralorne West Mining Zone
2026 Production - Bralorne West Mining Zone Completed Bralorne West Q4, 2025 Completed Scheduled On-Vein Development First Bralorne West Q1, 2026 completion for 2027 and 2028 Production Stopes Q2, 2026 Production Bralorne West Access Decline 2026 Completed Development and Stopes 2026 Planned On-Vein
Slide 11: 2026 Mineral Resource Update
2026 Mineral Resource Update Bralorne Gold Mines 2026 Mineral Resource Mustang Resource Area 5 km Strike Length Olympus Resource Area 2 km Depth Au (g/t) Open and untested at depth Includes Measured, Indicated, and Inferred resources. Modern and historic voids have been removed. TSX: TSK OTCQX: TSKF
Slide 12: Developing a Mining District
Developing a Mining District 33km strike length mineralised district 14,000ha - 100% Talisker owned 47 known mineral occurrences and historic mines Congress Historic Resource 186Koz @ 9.1 g/t Au from surface to 200m1 BRX first-pass drilling results up to 329 g/t Au Limited modern explora
Slide 13: Compelling Value Proposition
Compelling Value Proposition Robust, district-scale, multi-year growth story GROWING PRODUCTION PROFILE ■ Pathway to 100 koz/year by 2028 ■ Second Mine planned for 2029 LARGE EXPLORATION UPSIDE1 ■ 5 Moz+ upside based on historic drift assays and drilling ■ 33 km strike mineralised length of district
Slide 14: Corporate Head Office
TSX : TSK OTCQB : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 3P5 Lindsay Dunlop Vice President, Investor Relations +1(647) 274-8975 lindsay.dunlop@taliskerresources.com TSX: TSK OTCQX: TSKFF 14 14
Slide 15: Corporate Leadership
Corporate Leadership Management TERRY HARBORT ANDRES TINAJERO CEO, President, Director Chief Financial Officer PhD in Structural Geology and Tectonics MBA and Member, Canadian Institute of Chartered Professional Co-founder and VP Exploration, Talisker Exploration Services Inc. Accountants, the
Slide 16: Corporate Leadership – Management (continued)
Corporate Leadership Management (continued) RICHARD MURRELL KYLE ORR General Manager - Bralorne Vice President, Exploration 30+ years of underground mining experience, specializing in With Talisker since its founding, leading the design and execution of shaft sinking and tunnelling the 165,000m
Slide 17: Corporate Leadership – Non-Executive Directors
Corporate Leadership Non-Executive Directors MORRIS PRYCHIDNY (1)(2) TERRY HARBORT (3) STEPHEN BURLETON (1*) Chairman CEO, President, Director Mining executive with significant experience in Chartered Accountant with 35+ years experience in PhD in Structural Geology and Tectonics capital raisi
Slide 18: Bralorne
Bralorne Largest gold camp in Western Canada Historic output: 4.2 Moz at 17.7 g/t demonstrating exceptional grade and continuity Proven ore continuity: 2,300 oz per vertical metre, from 2.5 km strike length to 1.9 km depth High-grade cores with brecciated halos – advantageous for selective min
Slide 19: Bralorne Vein Array
Bralorne Vein Array Parallel vein sets provide potential for numerous adjacent mining fronts Cross Section (415,450 mE) Plan View Excellent mineability due to high-grade continuity, vein structural continuity, high dip angle Many veins defined to near surface Excellent structural continuity down dip
Slide 20: Ladner Gold Project
Ladner Gold Project 5 Historical Mines – 24 known Gold Occurrences Compliant 691,540 oz Inferred Gold Resource* Major Mines Permit (M-138) in place 144km2 contiguous land package – ~28kms x 5kms Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) Extensi
Slide 21: Ladner Tailings JV
Ladner Tailings JV Signed LOI with Regeneration Enterprises to form JV to process tailings Regeneration to fund, Talisker to retain equipment and facilities Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU R
Slide 22: Endnotes
Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Resource Development, who is a “qualified person” within th
Talisker Resources — Investor Presentation (May 2026) on 6ix