Talisker Resources Ltd. · TSX:TSK

Talisker Resources — Investor Presentation (January 2026)

23 slides from Talisker Resources's investor presentation, Jan 28, 2026

  1. Slide 1: Building the Foundation for Growth in 2026

    TSX : TSK OTCQB : TSKFF Building the Foundation for Growth in 2026 Corporate Presentation January 2026 TSX: TSK OTCQX: TSKFF 1

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Forward-Looking Statements Certain statements contained in this presentation constitute forward-looking information, which reflect the expectations of management Talisker Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future perfo

  3. Slide 3: Vision

    Vision To become a multi-mine gold producer by developing a district scale gold belt leading to the production of more than 200,000 ounces of gold annually TSX: TSK OTCQX: TSKFF 3

  4. Slide 4: Share Structure and Capitalization

    Share Structure and Capitalization CAPITAL STRUCTURE (January 16, 2026) Shareholder Breakdown TSX /OTCQB Symbols TSK/TSKFF INSTITUTIONAL 46% 52 week high/low $1.98/0.32 INSIDERS 5% Cash position (October 2025) $33M RETAIL Debt $1.6M 49% Credit Facility (undrawn) $35M Common Shares Outstanding 178,73

  5. Slide 5: Located in the Heart of BC Mining

    Located in the Heart of BC Mining  Stable first world jurisdiction  Extensive mining infrastructure  Seamless logistics with abundant highway and rail access  Adjacent large-scale hydro-electric Infrastructure  Connected to reliable grid power  Processing via existing toll mills  Ready availa

  6. Slide 6: Positioned for Growth – 5 Year Plan

    Positioned for Growth – 5 Year Plan From Discovery to Production in 5 years 2030 2029 2028 2020 - 2025 2026 2027  Olympus ramp up to  Olympus mine starts 500t/d  Initiation of mill  195,000 m of diamond drilling  PEA and Resource  Submit permit production  Congress PEA preconstruction Update

  7. Slide 7: 2026 – Building the Foundation for Growth

    2026 – Building the Foundation for Growth 30,000m of resource conversion drilling Drilling 15,000m at Mustang (underground), 15,000m at Bralorne West (surface and underground) Advancing 3 Ramps – Lower Mustang, Bralorne West, Brumby Development Lateral development preparing for increased production

  8. Slide 8: Production Overview

    Production Overview Mid-Term Production Plan Bralorne West Brumby Access Decline Bralorne West Mustang LEGEND Lower Mustang Existing development Spiral Decline Year 1 - 5 Stopes Year 1-5 Development Bralorne West Location of current mining activities Spiral Declines TSX: TSK OTCQX: TSKFF 8

  9. Slide 9: 2026 Production - Mustang and Brumby Areas

    2026 Production - Mustang and Brumby Areas Continuation of Mustang Brumby production at Mustang with new levels 1045 and 1030 coming online First Brumby Production Stopes Brumby Decline 2026 Lateral Development 2026 Waste Development Lower Mustang 2026 Production Stopes Decline Mined Out Area TSX: T

  10. Slide 10: 2026 Production - Bralorne West Area

    2026 Production - Bralorne West Area Bralorne West Bralorne West Lateral Development Access Decline for 2027 and 2028 First Bralorne West Production Production Stopes 2026 Lateral Development 2026 Waste Development Bralorne West 2026 Production Stopes Spiral Decline No.1 Mined Out Area 10 TSX: TSK O

  11. Slide 11: 2026 PEA and Mineral Resource Update

    2026 PEA and Mineral Resource Update Bralorne Gold Mines 2023 Mineral Resource and Undrilled Potential KING MUSTANG BRALORNE PIONEER Olympus Mine Plan Area POTENTIAL DEFINED BY HISTORIC DRIFT 2km ASSAYS UNDERGOING VALIDATION POTENTIAL DEFINED BY HISTORIC DRIFT POTENTIAL DEFINED BY HISTORIC DRIFT ASS

  12. Slide 12: Developing a Mining District

    Developing a Mining District  33km strike length mineralised district  14,000ha - 100% Talisker Owned  47 known mineral occurrences and historic mines  Congress Historic Resource 186Koz @ 9.1 g/t Au from surface to 200m1  BRX first-pass drilling results up to 329 g/t Au  Limited modern explora

  13. Slide 13: Compelling Value Proposition

    Compelling Value Proposition Robust, district-scale, multi-year growth story GROWING PRODUCTION PROFILE ■ Pathway to 100 koz/year by 2028 ■ Second Mine Planned for 2029 LARGE EXPLORATION UPSIDE1 ■ 5 Moz+ upside based on historic drift assays and drilling ■ 33km strike mineralised length of district

  14. Slide 14: Corporate Head Office

    TSX : TSK OTCQX : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 1T1 Lindsay Dunlop VP Investor Relations +1(647) 274-8975 lindsay.dunlop@taliskerresources.com TSX: TSK OTCQX: TSKFF 14 14

  15. Slide 15: Corporate Leadership

    Corporate Leadership Management TERRY HARBORT ANDRES TINAJERO CEO, President, Director Chief Financial Officer  PhD in Structural Geology and Tectonics  MBA and Member, Canadian Institute of Chartered  Co-founder and VP Exploration, Talisker Exploration Professional Accountants, the Certified Pra

  16. Slide 16: Corporate Leadership

    Corporate Leadership Management (continued) KYLE ORR RICHARD MURRELL Vice President, Exploration General Manager - Bralorne  With Talisker since its founding, leading the design and  30+ years of underground mining experience, specializing execution of the 165,000m resource drill-out program in sh

  17. Slide 17: Corporate Leadership

    Corporate Leadership Non-Executive Directors MORRIS PRYCHIDNY (1)(2) TERRY HARBORT STEPHEN BURLETON Chairman CEO, President, Director  Mining executive with significant experience in  Chartered Accountant with 35+ years experience in  PhD in Structural Geology and Tectonics capital raising, corpo

  18. Slide 18: Bralorne Mineral Resource Estimate (MRE)

    Bralorne Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) Long Hole > 2.65 111,300 8.61 30,800 Indicated Cut and Fill > 3.10 5,900 13.45 2,600 KING Long Hole > 2.65 1,598,400 5.76 296,200 Inferred Cut and Fill > 3.10 76,0

  19. Slide 19: Ladner Gold Project

    Ladner Gold Project  5 Historical Mines – 24 Known Gold Occurrences  Compliant 691,540oz Inferred Gold Resource*  Major Mines Permit (M-138) in place  144km2 contiguous land package – ~28kms x 5kms  Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt)  Extensiv

  20. Slide 20: Bralorne

    Bralorne Largest gold camp in Western Canada  Historic output: 4.2 Moz at 17.7 g/t demonstrating exceptional grade and continuity  Proven ore continuity: 2,300 oz per vertical metre, from 2.5 km strike length to 1.9 km depth  High-grade cores with brecciated halos – advantageous for selective min

  21. Slide 21: Ladner Tailings JV

    Ladner Tailings JV  Signed LOI with Regeneration Enterprises to form JV to process tailings  Regeneration to fund, Talisker to retain equipment and facilities  Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU  R

  22. Slide 22: Bralorne Vein Array

    Bralorne Vein Array Parallel vein sets provide potential for numerous adjacent mining fronts Cross Section (415,450 mE) Plan View Excellent mineability due to high-grade continuity, vein structural continuity, high dip angle Many veins defined to near surface Excellent structural continuity down dip

  23. Slide 23: Cautionary Statements

    Cautionary Statements Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a

Talisker Resources — Investor Presentation (January 2026) on 6ix