Talisker Resources Ltd. · TSX:TSK
Talisker Resources — Investor Presentation (October 2025)
24 slides from Talisker Resources's investor presentation, October 2025
Slide 1: Canada's Newest High-Grade Gold Producer
TSX : TSK OTCQB : TSKFF Canada’s Newest High-Grade Gold Producer Corporate Presentation October 2025 TSX: TSK OTCQX: TSKFF 1
Slide 2: Forward-Looking Statements
Forward-Looking Statements Certain statements in this presentation constitute forward-looking information, which reflect the expectations of management Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance. The use of any of the words “could”, “
Slide 3: Vision
Vision To become a multi-asset gold producer by developing district scale gold belts leading to the production of more than 200,000 ounces of gold annually TSX: TSK OTCQX: TSKFF 3
Slide 4: Located in the Heart of BC Mining
Located in the Heart of BC Mining Extensive Mining Infrastructure Seamless logistics with abundant highway access Adjacent large-scale Hydro- electric Infrastructure and reliable grid power Processing via existing toll mills Ready availability of skilled labour and favourable operating cli
Slide 5: Share Structure and Capitalization
Share Structure and Capitalization CAPITAL STRUCTURE (September 26, 2025) Shareholder Breakdown TSX /OTCQB Symbols TSK/TSKFF INSTITUTIONAL 46% 52 week high/low $1.32/0.31 INSIDERS 5% Cash position (August 2025) $21M RETAIL Common Shares Outstanding 144,387,540 49% Warrants 30,964,588 TSX: TSK Option
Slide 6: Positioned for Growth
Positioned for Growth From discovery to production in 5 years 2029 2028 2027 2020 - 2024 2025 2026 Olympus mine Initiation of mill starts production Engineering design preconstruction PEA and Resource Commissioning 165,000mm of diamond Milling agreement for Olympus mine works Update of
Slide 7: Year 1 Production Plan
Year 1 Production Plan Mustang Mine – Orthogonal View Successful transition to mining First revenue achieved 5 Levels developed to date Stoping underway between 1060 and 1105 Levels Hauling daily to mill for processing Mustang Portal Plunge +19 Azimuth 006 LEGEND 100 m Existing development
Slide 8: Two Mines, One System
Two Mines, One System Mid-Term Production Plan Mustang Mine - Orthogonal View Clear pathway to consistent Development underway to Bralorne West 2026 Mining Start In Bralorne West for January 2026 production increase 5 veins providing for 20 working faces per level 750 t/d production ■ ■ 30 levels pl
Slide 9: Quarterly Production Forecast
Quarterly Production Forecast Quarterly Production Tonnage 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Q4, Q1, Q2, Q3, Q4, Q1, Q2, Q3, Q4, Q1, Q2, Q3, Q4, Q1, Q2, Q3, Q4, 2025 2026 2026 2026 2026 2027 2027 2027 2027 2028 2028 2028 2028 2029 2029 2029 2029 Planning underway to bring pro
Slide 10: Clear Extensive Upside
Clear Extensive Upside Bralorne Gold Mines 2023 Mineral Resource and Undrilled Potential KING MUSTANG BRALORNE Possible 2nd Portal PIONEER OPEN OPEN OPEN OPEN OPEN TSX: TSK OTCQX: TSKFF 10
Slide 11: Clear Extensive Upside
Clear Extensive Upside Bralorne Gold Mines 2023 Mineral Resource and Undrilled Potential KING MUSTANG BRALORNE Possible 2nd Portal PIONEER POTENTIAL DEFINED BY HISTORIC DRIFT ASSAYS UNDERGOING VALIDATION POTENTIAL DEFINED BY HISTORIC DRIFT POTENTIAL DEFINED BY HISTORIC DRIFT ASSAYS UNDERGOING VALIDA
Slide 12: Bralorne District-Scale Upside
Bralorne District-Scale Upside 7 historical mines, 47 known mineral occurrences Historic Resource 186Koz @ 9.1 g/t Au at Congress from surface to 200m1 BRX first-pass drilling results up to 329 g/t Au Limited modern exploration across belt; developing exploration plan Potential for multipl
Slide 13: Compelling Value Proposition
Compelling Value Proposition BRALORNE Canada’s newest gold producer GROWING PRODUCTION PROFILE ■ Pathway to 100 koz/year LARGE EXPLORATION UPSIDE2 ■ 5 Moz+ upside based on historic drift assays and drilling Strong pipeline of Greenfields Projects STRONG HIGH-GRADE RESOURCE BASE3 ■ 1.66 Moz defined a
Slide 14: Corporate Head Office
TSX : TSK OTCQX : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 1T1 Lindsay Dunlop VP Investor Relations +1(647) 274-8975 lindsay.dunlop@taliskerresources.com TSX: TSK OTCQX: TSKFF 14 14
Slide 15: Corporate Leadership
Corporate Leadership Management TERRY HARBORT ANDRES TINAJERO CEO, President, Director Chief Financial Officer PhD in Structural Geology and Tectonics MBA and Member, Canadian Institute of Chartered Co-founder and VP Exploration, Talisker Exploration Professional Accountants, the Certified Pra
Slide 16: Corporate Leadership - Management (continued)
Corporate Leadership Management (continued) KYLE ORR RICHARD MURRELL Vice President, Exploration General Manager - Bralorne With Talisker since its founding, leading the design and 30+ years of underground mining experience, specializing execution of the 165,000m resource drill-out program in sh
Slide 17: Corporate Leadership - Non-Executive Directors
Corporate Leadership Non-Executive Directors MORRIS PRYCHIDNY (1)(2) TERRY HARBORT STEPHEN BURLETON Chairman CEO, President, Director Mining executive with significant experience in Chartered Accountant with 35+ years experience in PhD in Structural Geology and Tectonics capital raising, corpo
Slide 18: Bralorne Mineral Resource Estimate (MRE)
Bralorne Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) Long Hole > 2.65 111,300 8.61 30,800 Indicated Cut and Fill > 3.10 5,900 13.45 2,600 KING Long Hole > 2.65 1,598,400 5.76 296,200 Inferred Cut and Fill > 3.10 76,0
Slide 19: Ladner Gold Project
Ladner Gold Project 5 Historical Mines – 24 Known Gold Occurrences Compliant 691,540oz Inferred Gold Resource* Major Mines Permit (M-138) in place 144km2 contiguous land package – ~28kms x 5kms Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) Extensiv
Slide 20: Bralorne
Bralorne Largest gold camp in Western Canada Historic output: 4.2 Moz at 17.7 g/t demonstrating exceptional grade and continuity Proven ore continuity: 2,300 oz per vertical metre, from 2.5 km strike length to 1.9 km depth High-grade cores with brecciated halos – advantageous for selective min
Slide 21: Ladner Tailings JV
Ladner Tailings JV Signed LOI with Regeneration Enterprises to form JV to process tailings Regeneration to fund, Talisker to retain equipment and facilities Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU R
Slide 22: Bralorne Vein Array
Bralorne Vein Array Parallel vein sets provide potential for numerous adjacent mining fronts Cross Section (415,450 mE) Plan View Excellent mineability due to high-grade continuity, vein structural continuity, high dip angle Many veins defined to near surface Excellent structural continuity down dip
Slide 23: Endnotes
Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified p
Slide 24: Endnotes - continued
Endnotes – continued • High grade capping, supported by statistical analysis, was applied to composited data inside the high-grade quartz veins for Pioneer (1.4 m) at 100 g/t Au, Bralorne (1.4 m) at 100 g/t Au, Charlotte (1.0 m) at 31 g/t Au and King (1.2 m) at 110 g/t Au for the drill hole samples
Talisker Resources — Investor Presentation (October 2025) on 6ix