PetroQuest Energy — Investor Presentation (October 2010)
33 slides from PetroQuest Energy's investor presentation, Oct 12, 2010

Slide 1: October 2010
October 2010

Slide 2: Company Information
Company Information 1 Corporate Contact: Matt Quantz - mquantz@petroquest.com This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. These forward-looking

Slide 3: Corporate Characteristics
Corporate Characteristics Track record of reserve growth through the drill bit and strategic acquisitions 97% drilling success rate for the 6 years ended 12/31/2009 26% 11-year reserves CAGR Balanced, diversified asset portfolio combines longer-life development assets with shorter-life strong cash f

Slide 4: A History of Consistent Growth
A History of Consistent Growth(1 ) Reserves 26% CAGR Production 32% CAGR Cash Flow 82% CAGR Stock price 20% CAGR 3 (1) Beginning in 1999

Slide 5: 2010 Operations Overview
2010 Operations Overview 4 Capital expenditures in 2010 increased from reduced 2009 spending to approximate 2010 cash flow Large operated position allows for control of timing of investments Woodford JV closed May 2010 $234.6 million total transaction value No developed reserves or production sold R

Slide 6: Our Properties
Our Properties 5 Gulf Coast Region Arkoma Basin Tulsa East Texas Lafayette Houston 82% Reserves (1) We have grown beyond being solely a Gulf Coast Basin company 18% Reserves (1) (1) As of June 30, 2010

Slide 7: Our Portfolio: Three separate basins - all poised for growth
1P Reserves (1) Drilling Locations (2) EAST TEXAS BOSSIER (3) ARKOMA (OKLAHOMA) ARKOMA (ARKANSAS) SOUTH LOUISIANA GULF OF MEXICO Our Portfolio Three separate basins - all poised for growth 6 Three separate basins - all core to PQ Unrisked Inventory (2) Reserves are as of December 31, 2009 (reserves

Slide 8: Arkoma Basin
Arkoma Basin 7 Approximately 45,000(1) net acres in the Woodford Shale Approximately 18,000 net acres in the Fayetteville Shale Current production approximately 37,000 Mcf/day net (1) Woodford JV partner has the right to earn approximately 20,000 net acres

Slide 9: Arkoma Basin - Strong Growth Metrics
Arkoma Basin (1) - Strong Growth Metrics 8 (1) Includes Woodford and Fayetteville 52% CAGR

Slide 10: Woodford Shale Activity
Woodford Shale Activity 9 Recent Activity Current net production ~ 32 MMcf/d Woodford JV closed May 2010 Three Woodford wells completed in June with average IP of 6.8 MMcf/d 15 gross operated Woodford wells budgeted for 2010 Approximately 43% of 2010 capital budget allocated to Woodford Continued im

Slide 11: 3D Seismic Based Drilling
10 Wapanucka Limestone Woodford Shale 3D Seismic Based Drilling 8000' 7000' 6000' 9000' Section Line Section Line Section Line 3D Seismic Profile PQ #27 PQ #9 IP - 12.5 MMcfe IP - 2.9 MMcfe

Slide 12: Woodford Shale: PQ Delivers Top Max Monthly Rate
Woodford Shale PQ Delivers Top Max Monthly Rate 11 Source: compiled from public domain production data coupled with internal production data on newer PQ wells. Data reported: March 2008 - December 2009 PQ WOODFORD PROGRAM PQ delivered highest maximum monthly initial production rate of any company 15

Slide 13: Woodford JV Transaction Summary
Woodford JV Transaction Summary $234.6MM total transaction value ($128MM guaranteed) $60MM up front payment $28MM in future payments $14MM at November 2011 $14MM dependent upon continued achievement of "base case" performance metrics $146.6MM "drilling carry" where JV partner pays 80% of costs for 5

Slide 14: Woodford Decline Curves
Woodford Decline Curves 13 (1) Source: Simmons & Company PQ Woodford Year 1 Avg Decline ~60% March 2008 Onward Avg Year 1 Decline % (1) Haynesville: 85% Fayetteville: 64% Marcellus: 62% Eagle Ford: 82% Barnett: 65%

Slide 15: Woodford Horizontal Well Economics (Pre JV)
Woodford Horizontal Well Economics (Pre JV) 14 IRR $/Mcf $/Mcf Capital ($M) Capital ($M) Capital ($M) Capital ($M) Assumptions: Price* $4,000 $5,000 $6,000 IRR % IP Rate - 6.0 MMcfd $4.00 18.9% 10.6% 5.5% IRR % EUR - 5.0 Bcf $4.50 26.9% 16.4% 10.2% IRR % Well Cost - $4.0 to $6.0 MM $5.00 35.6% 22.9%

Slide 16: Fayetteville Shale
Fayetteville Shale 15 Approximately 18,000 net acres Current production approximately 5,000 Mcf/day net 5% of 2010 capital budget allocated to Fayetteville

Slide 17: East Texas
East Texas Anchored by SE Carthage field: 23,900 net acres and avg daily production of 10 MMcf/d Horizontal Cotton Valley program: two wells planned for the second half of 2010 (Currently drilling first well - expect results from both wells during 4Q10) 11% of the 2010 capital budget to East Texas H

Slide 18: East Texas - Haynesville/Bossier Upside
East Texas - Haynesville/Bossier Upside 17 Source: RBC Capital Markets Source: RBC Capital Markets

Slide 19: Gulf Coast = Shallower Declines & Liquids Exposure
Gulf Coast = Shallower Declines & Liquids Exposure 18 Lafayette Pelican Point The Bluffs SS 225 Lynlakes Southern Hills

Slide 20: Growth in Liquids Exposure
Growth in Liquids Exposure 19 During the first 6 months of 2010, liquids generated 40% of oil and gas revenue(1) and 20% of production on an mcfe basis Does not include revenue received from the settlement of oil and gas hedging contracts Oil production has increased over the past 12 months MBbls

Slide 21: Near-Term Gulf Coast Drilling Inventory
Near-Term Gulf Coast Drilling Inventory Near-Term Gulf Coast Drilling Inventory 20 Focus near term capital on low cost recompletion opportunities, low risk development projects and select high impact onshore drilling prospects 41% of 2010 capex budget allocated to GOM/GC basin (includes approximatel

Slide 22: Strong Balance Sheet and Liquidity
Strong Balance Sheet and Liquidity 12/31/08 6/30/10 Bank Debt Outstanding $130MM $0 Cash on Hand $24MM $58MM Total Liquidity(1) $40.1MM $161.1MM Net Debt/Proved Mcfe(2)(3) $1.29 $0.58 Net Debt/Proved Dev. Mcfe(2)(3) $2.07 $0.80 Net Debt/Adjusted EBITDA (TTM)(4) 1.18x 0.6x % of Reserves Long Lived(5)

Slide 23: Refinancing of Senior Notes
22 Refinancing of Senior Notes 7-Year Notes issued at par to yield 10% Extends debt maturity from 2012 to 2017 Lower coupon generates ~$1 million in annual interest expense savings Provides improved covenant package allowing for full use of $100 million borrowing base Extends maturity of credit faci

Slide 24: Focused Effort to Fund Drilling with Cash Flow
Focused Effort to Fund Drilling with Cash Flow 23 MM$ $126 million liquidity build $/mcfe Net debt is calculated as debt less net working capital 6/30/10 balance sheet and 12/31/09 reserves, pro forma for Woodford JV Estimated 2010 Cap Ex $100-110MM Additional $38MM in equity proceeds Additional $60

Slide 25: Capital Investment Program - Diversification Reduces Risk
Capital Investment Program - Diversification Reduces Risk 24 $59 million Drilled 82 Wells 2009 2008 $280 million Drilled 150 Wells 2010E $100 - $110 million Drill 70 - 90 Wells

Slide 26: Hedging Positions
Hedging Positions Target of hedging 40%-50% of annual production - approximately 50% of the remainder of 2010 estimated gas production is hedged (based on mid-point of production guidance) Hedging positions (costless collars) 25

Slide 27: Summary of Diversification Efforts
Summary of Diversification Efforts 26 * Using the SEC's previous reporting methodology, proved reserves would have been 202.2 Bcfe (194% growth; year end 2009 prices of $5.79 per mcf and $79.36 per Bbl) 160% Growth 157% Growth

Slide 28: Comparative Valuation
Comparative Valuation Notes: Company stock prices and estimates are as of 9/21/2010. Analyst cash flow per share estimates per Bloomberg. The analysts' opinions, estimates or forecasts (and therefore the estimates) are theirs alone, are not those of PetroQuest or its management and may not reflect P

Slide 29: Closing Summary
28 Closing Summary Continue to diversify reserve base into resource plays Results in a balanced portfolio that combines longer-life development assets with shorter- life strong cash flow generating assets Woodford JV generates significant liquidity and accelerates monetization of long-term acreage d

Slide 30: Appendix
29 Appendix

Slide 31: Appendix - Adjusted EBITDA
30 Appendix - 1 Adjusted EBITDA represents income before interest expense (net), income tax, depreciation, depletion, amortization, accretion of asset retirement obligation and ceiling test writedowns. We have reported Adjusted EBITDA because we believe Adjusted EBITDA is a measure commonly reported

Slide 32: Appendix - Adjusted EBITDA reconciliation
31 Appendix - 2 6 months ($ in thousands) 2004 2005 2006 2007 2008 2009 2010 Net income (loss) $16,348 $21,417 $23,986 $40,619 ($96,960) ($90,190) $37,532 Reconciling items: Deferred tax expense (benefit) 8,511 12,477 14,604 23,664 (55,581) (14,635) (1,380) Gain on sale of assets 0 0 0 0 (26,812) (4

Slide 33: PetroQuest Energy, Inc.
\) PetroQuest Energy, Inc. 400 East Kaliste Saloom Road, Suite 6000 Lafayette, Louisiana 70508 Phone: (337) 232-7028 Fax: (337) 232-0044 ‘www.petroquest.com NYSE: PQ
Source: SEC EDGAR · 8-K filed Oct 12, 2010
More decks from PetroQuest Energy Inc
Corporate Update (June 2019)15 slides · Jun 19, 2019
Investor Presentation (November 2018)16 slides · Nov 7, 2018
Investor Presentation (July 2018)29 slides · Jul 10, 2018
Investor Presentation (December 2017)6 slides · Dec 20, 2017
Investor Presentation (January 2017)28 slides · Jan 9, 2017
Investor Presentation (April 2016)29 slides · Apr 5, 2016