PetroQuest Energy — Corporate Update (June 2019)
15 slides from PetroQuest Energy's corporate update, Jun 19, 2019

Slide 1: PetroQuest Energy, Inc. Company Update
Wrervooucs Energy, Inc. Company Update

Slide 2: Forward-Looking Statements
Forward-Looking Statements This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than statements of historical fact included in this

Slide 3: Situation Update
Situation Update ▪ PetroQuest successfully completed its financial restructuring on February 8, 2019 ▪ The Company has enhanced its balance sheet position by eliminating approximately $295 MM in debt and preferred equity obligations ▪ Current operations focused on continued development of the Compan

Slide 4: Our Strategy Today
Our Strategy Today ▪ Focus on aligning capex and cash flow and improving relative leverage metrics through underlying EBITDA growth ▪ Build value for shareholders and drilling partners utilizing a capital allocation weighted toward low-risk, rich gas development in the Cotton Valley ▪ Test the Austi

Slide 5: PetroQuest Asset Overview
PetroQuest Asset Overview Total Company Operating Update ~49,500 net acres 46 mmcfe/d production A East Texas 130 bcfe proved reserves / 2.7 tcfe 3P reserves* ▪ PQ 31 online early 2019 at IP rate of 11.7 mmcfe/d >670 gross locations (gross) ▪ PQ 32 and 33 flowing back A East Texas Statistics ▪ Combi

Slide 6: East Texas Asset Overview
East Texas Asset Overview ▪ PetroQuest’s East Texas assets are situated in the East Texas Locator Map heart of the Cotton Valley Trend in Panola County, TX ▪ ~56,000 gross acres ▪ 50% WI in ~46,000 gross acres currently under JDA with Chevron with rights from top of the Travis Peak to Bossier Shale

Slide 7: Cotton Valley Horizontal – Higher Production, Lower Costs
Cotton Valley Horizontal – Higher Production, Lower Costs Improving Well Performance 16 3,000 5,747 6,000 13.3 $2,200 12 5,000 2,000 Lateral Feet Lateral 3,654 8 6.3 4,000 $/LateralFoot $916 1,000 24HR 24HR IP (mmcfe/d)Rate 4 3,000 0 0 2,000 Avg. 2011 Last 10 wells* PQ #1 Last 10 wells* Gas Liquids

Slide 8: Cotton Valley Opportunities
SE CARTHAGE 8200 8250 8250 8250 8300 8300 8300 8350 8350 8350 Multi 8400 Bench Cotton Valley Opportunities 8400 8400 8450 8450 8450 8500 PetroQuest 8500 -- McFadden Bagley #1 8500 8550 8550 8550 8600 8600 Cotton Valley Bench Cotton Valley8600 Drilling Locations 8650 8650 8650 8700 8700 8700 8750 875

Slide 9: Cotton Valley Inventory
Cotton Valley Inventory ~550 Gross Locations with >20% IRR* 200 Plan to test Davis sand in 4Q19 164 150 1 Horizontal Producing Well 133 120 100 28 Horizontal Producing Wells 76 6 Horizontal Producing Wells 53 Number of Remaining NumberLocations Remaining of 50 0 E4 Eberry E Vaughn Davis Cotton Valle

Slide 10: Austin Chalk Asset Overview
Austin Chalk Asset Overview Louisiana Acreage Map (>1.2 MM Acres) LEGEND ▪ PetroQuest has a 21,000 net acre L. Cretaceous Shelf Edge EOG Eagles Anadarko Wells PQ Rig PQ Lease Position position in the heart of the Ranch Well Key Seismic Line EOG Rig New Permits MRO 3D Commitment naturally fractured A

Slide 11: 1Q19 Balance Sheet Overview
1Q19 Balance Sheet Overview Net Debt as of 3/31/19 ($MM) 1L Term Loan due 2023 (L+750) $50 10% Senior Secured PIK Notes due 2024 $80 Less: Unrestricted Cash Balance ($27) Less: Other Current Assets ($10) Plus: Current Liabilities $27 Net Debt $120 10

Slide 12: 1Q19 Operating Summary
1Q19 Operating Summary Daily Production 1Q19 Actual Liquids (mboe/d) 1.9 Gas (mmcf/d) 34.6 Total (mmcfe/d) 46.0 ($ in millions) Revenue $15 LOE $4 Production Taxes 1 G&A* 4 Total Operating Expenses $9 EBITDA $6 Oil and Gas Capex $8 Capitalized G&A $1 *Excludes reorganization items and non-cash compe

Slide 13: Experienced Management Team
Experienced Management Team Prior Years in Name Position Experience Industry American Charles T. Goodson CEO & President Explorer LLC 42+ EVP, CFO & J. Bond Clement 26+ Treasurer EVP – Operations Art M. Mixon 38+ and Production Stephen H. Green SVP – Exploration 38+ VP of the ArkLaTex Edgar A. Ander

Slide 14: PetroQuest Highlights
PetroQuest Highlights ▪ Large, contiguous East Texas acreage position (majority HBP) with significant upside potential ▪ Track record of executing low-cost Cotton Valley wells with attractive returns ▪ Large inventory of undeveloped locations in the Cotton Valley and existing potential in the Louisi

Slide 15: Company Information
Company Information 400 East Kaliste Saloom Road, Suite 6000 Lafayette, Louisiana 70508 Phone: (337) 232-7028 Fax: (337) 232-0044 www.petroquest.com 14
Source: SEC EDGAR · 8-K filed Jun 19, 2019
More decks from PetroQuest Energy Inc
Investor Presentation (November 2018)16 slides · Nov 7, 2018
Investor Presentation (July 2018)29 slides · Jul 10, 2018
Investor Presentation (December 2017)6 slides · Dec 20, 2017
Investor Presentation (January 2017)28 slides · Jan 9, 2017
Investor Presentation (April 2016)29 slides · Apr 5, 2016
Investor Presentation (February 2016)28 slides · Feb 24, 2016