A New Direction Developing Copper Assets in Canada’s North 1 May 2018 TSX.V:COL

Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

Slide 3: Copper North Properties
COPPER NORTH PROPERTIES CARMACKS OXIDE Cu-Au-Ag PROPERTY 100% Advanced-stage development asset 7-year mine life SX/EW cathode copper production Positive 2016 PEA Measured & Indicated Resource 11.98 Mt @ 1.07% Cu, 0.456 g/t Au and 4.58 g/t Ag 282 M lbs Contained Cu, 171,800 oz Au, 1,705,800 oz Ag RED

Slide 4: Copper North – Corporate Structure
COPPER NORTH – Corporate Structure Copper North Symbol – TSX.V.COL TSX.V: COL Corporate Structure | 4

Slide 5: Carmacks Copper-Gold-Silver Project Focused on Building Value
Carmacks Copper-Gold-Silver Project Focused on Building Value Copper North is building value in the Carmacks Project by: Maximizing metal recovery from the mineral resource Engineering a low-cost producer Expanding the mineral resource through exploration Deposit High-grade: oxide copper wit

Slide 6: Carmacks Project – Excellent Infrastructure
Carmacks Project – Excellent Infrastructure TSX.V: COL Carmacks Location | 6

Slide 7: Building Value: Maximizing Metal Recovery
Carmacks Copper-Gold-Silver Project Building Value Maximizing Metal Recovery Oxide deposit grades 1.07% Cu, 0.45 g/t Au, and 4.5 g/t Ag (Zones, 1, 4, 7, and 7A) Historical plan was to heap leach and only recover copper Newly engineered two-stage agitated tank leach process enables efficient se

Slide 8: Engineering a Low-cost Copper Producer
Carmacks Copper-Gold-Silver Project Building Value Engineering a Low-cost Copper Producer Precious metals recovery adds 30% to net project revenue Result is a low-cost Cu producer after precious metals credits US$1.05/lb C1 cash cost in lower decile of global copper producers Engineered for En

Slide 9: Carmacks Project Economics: Effect of Copper and Gold Price
Carmacks Project Economics Effect of Copper and Gold Price Notes to Table: The above estimates are forward-looking and demonstrate sensitivity to specific project assumptions. a. Base case as documented in JDS Energy and Mining. 2016. NI 43-101 Preliminary Economic Assessment Technical Report on the

Slide 10: Two-Stage Agitated Tank Leach Plant Layout
Two-Stage Agitated Tank Leach Plant Layout TSX.V: COL Carmacks Process Plan | 10

Slide 11: Planned Mine Site Layout
Carmacks Copper-Gold-Silver Project Planned Mine Site Layout Dry Stack TMA Waste Rock Open Pit Process Plant Camp TSX.V: COL Carmacks Site Plan | 11

Slide 12: Plan to Produce LME Grade A Copper Metal – On Site
Plan to Produce LME Grade A Copper Metal – On Site TSX.V: COL SX/EW Copper Production | 12

Slide 13: Building Value: Expanding the Mineral Resource
Carmacks Copper-Gold-Silver Project Building Value Expanding the Mineral Resource Copper North resumed exploration of the Carmacks property in 2014, after a 6-year hiatus, and continued in 2015 and 2017 Currently focused on known oxide copper-gold mineralized targets along a 6 km long north/sout

Slide 14: Exploration Focused on Known Mineralisation Zones
Exploration Focused on Known Mineralisation Zones Mineralised Zones Over Six Kilometre Long Trend TSX.V: COL Exploration Target Zones | 14

Slide 15: Oxide Transition to Sulphide Copper
Oxide Transition to Sulphide Copper Oxide Zone Oxide Zone Transition Zone with Native Copper Sulphide Zone TSX.V: COL Carmacks – Oxide and Sulphide Mineral Resource | 15

Slide 16: 2017 Exploration – Filling in the Gaps
2017 Exploration – Filling in the Gaps North-South Longitudinal Section Showing Oblique 3-D View of Oxide, Sulphide, and Transition Mineralisation TSX.V: COL Exploration – 2017 Drill Targets | 16

Slide 17: Expanding the Mineral Resource
Carmacks Project Expanding the Mineral Resource 2014 Trenching and diamond drilling defined near-surface mineralisation over 500 metres in Zone 2 Further delineation drilling planned for future years 2015 Drilling 3,271 m of infill and step-out diamond drilling in Zones 2000S, 12, and 13: Ox

Slide 18: NI 43-101 Oxide Mineral Resources (2016)
Carmacks Project NI 43-101 Oxide Mineral Resources (2016) Notes: 1. Calculated using a cut-off grade of 0.25% total Cu. 2. Calculated using a cut-off grade of 0.15% acid-soluble Cu. 3. PEA refers to the JDS Energy and Mining Inc. 2016. NI 43-101 Preliminary Economic Assessment Technical Report on th

Slide 19: NI 43-101 Sulphide Mineral Resource (2016)
Carmacks Project NI 43-101 Sulphide Mineral Resource (2016) Sulphide Resource has potential for expansion and addition to future processing Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc. 2016. NI 43-101 Preliminary Economic Assessment Technical Repor

Slide 20: Oxide Mineral Resources (2018)
Carmacks Project Oxide Mineral Resources (2018) Notes: 1. Calculated using a cut-off grade of 0.25% total Cu. 2. Calculated using a cut-off grade of 0.15% acid-soluble Cu. Includes NI 43-101 resource from 2016 PEA plus added resource announced in April 9, 2018 News Release 3. PEA refers to the JDS E

Slide 21: Sulphide Mineral Resource (2018)
Carmacks Project Sulphide Mineral Resource (2018) Sulphide Resource has potential for expansion and addition to future processing Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc. 2016. NI 43-101 Preliminary Economic Assessment Technical Report on the C

Slide 22: Numerous Financing Alternatives
Carmacks Project Numerous Financing Alternatives Senior Debt Financing Low cost of copper production (after gold and silver credits) provides for high debt capacity (debt:equity ratio of about 70%:30%). Pay-back is fast at current and expected copper and gold prices. Relatively small capex is

Slide 23: Working Toward Production – Next Steps
Carmacks Project Working Toward Production – Next Steps Feasibility Engineering Advance metallurgical process engineering to feasibility level (Q2/Q3 2018) with a focus on: reducing process plant capital costs (target 8% CAPEX reduction); and, optimizing the process to minimize reagent require

Slide 24: Copper North Directors and Management
Copper North Directors and Management Robert McKnight, P.Eng. MBA - Chairman Currently Executive Vice-President and CFO of Nevada Copper Corp and extensive development and engineering and financial companies. Dr. Harlan Meade, P.Geo. - President, CEO and Director Former President and CEO Selwyn

Slide 25: Contact
Suite 1120 – 1095 West Pender St. Vancouver, BC V6E 2M6 T: 604.398.3451 F: 604.398.3456 www.coppernorthmining.com info@coppernorthmining.com TSX.V:COL
Source: Internet Archive copy of coppernorthmining.com