  1. Slide 1: A New Direction

    Slide 1: A New Direction

    A New Direction Developing Copper Assets in Canada’s North 1 May 2018 TSX.V:COL

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

  3. Slide 3: Copper North Properties

    Slide 3: Copper North Properties

    COPPER NORTH PROPERTIES CARMACKS OXIDE Cu-Au-Ag PROPERTY 100% Advanced-stage development asset 7-year mine life SX/EW cathode copper production Positive 2016 PEA Measured & Indicated Resource 11.98 Mt @ 1.07% Cu, 0.456 g/t Au and 4.58 g/t Ag 282 M lbs Contained Cu, 171,800 oz Au, 1,705,800 oz Ag RED

  4. Slide 4: Copper North – Corporate Structure

    Slide 4: Copper North – Corporate Structure

    COPPER NORTH – Corporate Structure Copper North Symbol – TSX.V.COL TSX.V: COL Corporate Structure | 4

  5. Slide 5: Carmacks Copper-Gold-Silver Project Focused on Building Value

    Slide 5: Carmacks Copper-Gold-Silver Project Focused on Building Value

    Carmacks Copper-Gold-Silver Project Focused on Building Value Copper North is building value in the Carmacks Project by:  Maximizing metal recovery from the mineral resource  Engineering a low-cost producer  Expanding the mineral resource through exploration Deposit  High-grade: oxide copper wit

  6. Slide 6: Carmacks Project – Excellent Infrastructure

    Slide 6: Carmacks Project – Excellent Infrastructure

    Carmacks Project – Excellent Infrastructure TSX.V: COL Carmacks Location | 6

  7. Slide 7: Building Value: Maximizing Metal Recovery

    Slide 7: Building Value: Maximizing Metal Recovery

    Carmacks Copper-Gold-Silver Project Building Value Maximizing Metal Recovery  Oxide deposit grades 1.07% Cu, 0.45 g/t Au, and 4.5 g/t Ag (Zones, 1, 4, 7, and 7A)  Historical plan was to heap leach and only recover copper  Newly engineered two-stage agitated tank leach process enables efficient se

  8. Slide 8: Engineering a Low-cost Copper Producer

    Slide 8: Engineering a Low-cost Copper Producer

    Carmacks Copper-Gold-Silver Project Building Value Engineering a Low-cost Copper Producer  Precious metals recovery adds 30% to net project revenue  Result is a low-cost Cu producer after precious metals credits  US$1.05/lb C1 cash cost in lower decile of global copper producers Engineered for En

  9. Slide 9: Carmacks Project Economics: Effect of Copper and Gold Price

    Slide 9: Carmacks Project Economics: Effect of Copper and Gold Price

    Carmacks Project Economics Effect of Copper and Gold Price Notes to Table: The above estimates are forward-looking and demonstrate sensitivity to specific project assumptions. a. Base case as documented in JDS Energy and Mining. 2016. NI 43-101 Preliminary Economic Assessment Technical Report on the

  10. Slide 10: Two-Stage Agitated Tank Leach Plant Layout

    Slide 10: Two-Stage Agitated Tank Leach Plant Layout

    Two-Stage Agitated Tank Leach Plant Layout TSX.V: COL Carmacks Process Plan | 10

  11. Slide 11: Planned Mine Site Layout

    Slide 11: Planned Mine Site Layout

    Carmacks Copper-Gold-Silver Project Planned Mine Site Layout Dry Stack TMA Waste Rock Open Pit Process Plant Camp TSX.V: COL Carmacks Site Plan | 11

  12. Slide 12: Plan to Produce LME Grade A Copper Metal – On Site

    Slide 12: Plan to Produce LME Grade A Copper Metal – On Site

    Plan to Produce LME Grade A Copper Metal – On Site TSX.V: COL SX/EW Copper Production | 12

  13. Slide 13: Building Value: Expanding the Mineral Resource

    Slide 13: Building Value: Expanding the Mineral Resource

    Carmacks Copper-Gold-Silver Project Building Value Expanding the Mineral Resource  Copper North resumed exploration of the Carmacks property in 2014, after a 6-year hiatus, and continued in 2015 and 2017  Currently focused on known oxide copper-gold mineralized targets along a 6 km long north/sout

  14. Slide 14: Exploration Focused on Known Mineralisation Zones

    Slide 14: Exploration Focused on Known Mineralisation Zones

    Exploration Focused on Known Mineralisation Zones Mineralised Zones Over Six Kilometre Long Trend TSX.V: COL Exploration Target Zones | 14

  15. Slide 15: Oxide Transition to Sulphide Copper

    Slide 15: Oxide Transition to Sulphide Copper

    Oxide Transition to Sulphide Copper Oxide Zone Oxide Zone Transition Zone with Native Copper Sulphide Zone TSX.V: COL Carmacks – Oxide and Sulphide Mineral Resource | 15

  16. Slide 16: 2017 Exploration – Filling in the Gaps

    Slide 16: 2017 Exploration – Filling in the Gaps

    2017 Exploration – Filling in the Gaps North-South Longitudinal Section Showing Oblique 3-D View of Oxide, Sulphide, and Transition Mineralisation TSX.V: COL Exploration – 2017 Drill Targets | 16

  17. Slide 17: Expanding the Mineral Resource

    Slide 17: Expanding the Mineral Resource

    Carmacks Project Expanding the Mineral Resource 2014  Trenching and diamond drilling defined near-surface mineralisation over 500 metres in Zone 2  Further delineation drilling planned for future years 2015 Drilling  3,271 m of infill and step-out diamond drilling in Zones 2000S, 12, and 13:  Ox

  18. Slide 18: NI 43-101 Oxide Mineral Resources (2016)

    Slide 18: NI 43-101 Oxide Mineral Resources (2016)

    Carmacks Project NI 43-101 Oxide Mineral Resources (2016) Notes: 1. Calculated using a cut-off grade of 0.25% total Cu. 2. Calculated using a cut-off grade of 0.15% acid-soluble Cu. 3. PEA refers to the JDS Energy and Mining Inc. 2016. NI 43-101 Preliminary Economic Assessment Technical Report on th

  19. Slide 19: NI 43-101 Sulphide Mineral Resource (2016)

    Slide 19: NI 43-101 Sulphide Mineral Resource (2016)

    Carmacks Project NI 43-101 Sulphide Mineral Resource (2016) Sulphide Resource has potential for expansion and addition to future processing Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc. 2016. NI 43-101 Preliminary Economic Assessment Technical Repor

  20. Slide 20: Oxide Mineral Resources (2018)

    Slide 20: Oxide Mineral Resources (2018)

    Carmacks Project Oxide Mineral Resources (2018) Notes: 1. Calculated using a cut-off grade of 0.25% total Cu. 2. Calculated using a cut-off grade of 0.15% acid-soluble Cu. Includes NI 43-101 resource from 2016 PEA plus added resource announced in April 9, 2018 News Release 3. PEA refers to the JDS E

  21. Slide 21: Sulphide Mineral Resource (2018)

    Slide 21: Sulphide Mineral Resource (2018)

    Carmacks Project Sulphide Mineral Resource (2018) Sulphide Resource has potential for expansion and addition to future processing Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc. 2016. NI 43-101 Preliminary Economic Assessment Technical Report on the C

  22. Slide 22: Numerous Financing Alternatives

    Slide 22: Numerous Financing Alternatives

    Carmacks Project Numerous Financing Alternatives Senior Debt Financing  Low cost of copper production (after gold and silver credits) provides for high debt capacity (debt:equity ratio of about 70%:30%).  Pay-back is fast at current and expected copper and gold prices.  Relatively small capex is

  23. Slide 23: Working Toward Production – Next Steps

    Slide 23: Working Toward Production – Next Steps

    Carmacks Project Working Toward Production – Next Steps Feasibility Engineering  Advance metallurgical process engineering to feasibility level (Q2/Q3 2018) with a focus on:  reducing process plant capital costs (target 8% CAPEX reduction); and,  optimizing the process to minimize reagent require

  24. Slide 24: Copper North Directors and Management

    Slide 24: Copper North Directors and Management

    Copper North Directors and Management Robert McKnight, P.Eng. MBA - Chairman  Currently Executive Vice-President and CFO of Nevada Copper Corp and extensive development and engineering and financial companies. Dr. Harlan Meade, P.Geo. - President, CEO and Director  Former President and CEO Selwyn

  25. Slide 25: Contact

    Slide 25: Contact

    Suite 1120 – 1095 West Pender St. Vancouver, BC V6E 2M6 T: 604.398.3451 F: 604.398.3456 www.coppernorthmining.com info@coppernorthmining.com TSX.V:COL

Source: Internet Archive copy of coppernorthmining.com