Copper North Mining — Investor Presentation (May 2013)
34 slides from Copper North Mining's investor presentation, May 2013

Slide 1: A New Direction: Developing Copper Assets in Canada's North
A New Direction Developing Copper Assets in Canada’s North May 2013 TSX.V:COL

Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

Slide 3: Introduction
INTRODUCTION Formed in 2011 following Western Copper Plan of Arrangement – Listed on the TSX Venture Exchange (TSX.V: COL) Developing Copper Assets in Canada’s North – Carmacks & Redstone Carmacks Copper Project is ‘Construction Ready’ – Updated feasibility study completed in 2012 – Permitting

Slide 4: Senior Management & Board
SENIOR MANAGEMENT & BOARD Dale Corman - Non-Executive Chairman – Former Chairman & Chief Executive Officer of Western Silver Corp. (sold in 2006 to Glamis) Dr. Sally Eyre - President & Chief Executive Officer – Former President & Chief Executive Officer of Etruscan Resources (now Endeavour Minin

Slide 5: Development & Exploration Projects
DEVELOPMENT & EXPLORATION PROJECTS Development CARMACKS COPPER PROJECT 100% (Yukon, Canada) Proven & Probable Reserves 11.6Mt @ 0.98% Cu Contained Metal (Cu) YUKON 249Mlbs (0.11Mt) NORTHWEST TERRITORIES Copper Oxide Deposit Exploration REDSTONE PROPERTY 100% BRITISH (NWT, Canada) COLUMBIA *Historic

Slide 6: Northern Canada
NORTHERN CANADA Carmacks (Yukon) Redstone (NWT) – 220km N of Whitehorse – 300km NE of Watson Lake – Existing road into site – Airstrip to camp – 11km from Yukon Power Grid (project load = 10 MVA) – Coates Lake enables float plane access – 400km from Port (Skagway) TSX.V: COL Location | 6

Slide 7: What's New
WHAT’S NEW DATE ANNOUNCEMENT Feb 1, 2012 Commencement of Carmacks Feasibility Study Update Mar 1, 2012 Design Changes to Carmacks Copper Project May 14, 2012 Historic Resource Estimate for Coates Lake, Redstone May 24, 2012 C$1.0M Non-Brokered Private Placement (closed June 1) July 4, 2012 Commenced

Slide 8: Carmacks Copper Project, Yukon
CARMACKS COPPER PROJECT, YUKON TSX.V: COL Location | 8

Slide 9: Carmacks Operating Data
CARMACKS OPERATING DATA Mining & Processing – Conventional Open Pit, Oxide Mine – Heap Leach, SX-EW (85% recovery) – LME Grade A Copper Cathode – Operating costs based on annual ore tonnage of 1.77 million tonnes OPERATING DATA ORE THROUGHPUT (t/d) 4,860 COPPER PRODUCTION (M lb/y) 30 STRIP RATIO (

Slide 10: Annual Production & Cash Cost
ANNUAL PRODUCTION & CASH COST 2.00 40,000 Annual Production 1.80 35,000 Cash cost - Carmacks 1.60 30,000 2011 Avg Cash Costs - SxEw (source: Wood 1.40 Mackenzie) 25,000 1.20 US$ per lb 000's lb 1.00 20,000 Copper Copper 0.80 15,000 0.60 10,000 0.40 5,000 0.20 - - 1 2 3 4 5 6 7 8 Year of Production C

Slide 11: Carmacks – Capital Costs
CARMACKS – CAPITAL COSTS Total Capex $177.6 million (includes contingency 9% and power line costs) Sustaining capital for life of mine is $4.7 million CAPITAL COSTS PROCESS, (C$ M) 162.1 INFRASTRUCTURE, CONTINGENCY MINE DEVELOPMENT (C$ M) 5.9 MINE EQUIP. LEASE (C$ M) 3.8 OWNERS COSTS (C$ M) 5.8

Slide 12: Carmacks - Financial Analysis
CARMACKS - FINANCIAL ANALYSIS IRR 15.6% and an NPV (8%) of $55M (at SEC Copper Price $3.63/lb) FINANCIAL ANALYSIS* UNIT SEC PRICE BASE CASE SPOT PRICE (Sept 2012) COPPER PRICE (US$/lb) 3.63 3.20 3.75 FOREIGN EXCHANGE (US$:C$) 1.00 1.00 1.00 After-Tax NPV @ 0% (C$M) 156.0 98.9 171.7 After-Tax NPV @

Slide 13: Carmacks - Property Geology
CARMACKS - PROPERTY GEOLOGY Resource & Reserves Carmacks deposit open at depth & oxidised to ~230m Section 400N All Resources and Reserves based on zones 1,4, 7 & 7A Upside potential in zones 2,12, 13,14 Malachite, cuprite, azurite and tenorite minerals dominate See Appendix 8 for Section 40

Slide 14: Carmacks - Permitting Status
CARMACKS - PERMITTING STATUS Complete Technical Review with First Nations (Q1 2013) − Commenced upon execution of LOI which established framework for consultation & provides for negotiation of an Impact Benefits Agreement Submit ‘Carmacks’ Project Proposal to *YESAB (Q1 2013) − Design changes as

Slide 15: Stratiform Copper Districts & Deposits
STRATIFORM COPPER DISTRICTS & DEPOSITS A Potential ‘New Mining District’ at Redstone *COL is not treating this historical resource estimate as current mineral resources and the Qualified Person *Redstone Historic Resource Estimate responsible for review of the historical resource estimate on behalf

Slide 16: High-Grade Copper Deposits
HIGH-GRADE COPPER DEPOSITS 2.6% Cu 2.6% Cu 4.1% Cu 3.92% Cu DRC Contained Copper (Mt) USA Canada Australia Spain Kazakhstan (Kinsevere & Kinsenda in DRC) Historical Source: Ivanplats IPO Preliminary Prospectus, Sept. 28, 2012. Data Provided by Brook Hunt, a Wood Mackenzie Company. * Redstone TSX.V

Slide 17: Redstone - Regional Geology
REDSTONE - REGIONAL GEOLOGY *Property consists of 22 claims and 5 leases extending NW-SE over ~180 km 3 key target areas for exploration Historical Resource of 33.4Mt @ 3.92% Cu & 11.3g/t Ag TSX.V: COL Redstone | 17 * Property map not to scale

Slide 18: Redstone Exploration Targets
REDSTONE EXPLORATION TARGETS Coates Lake deposit (stratiform) ‒ Historic resource estimate of 33.4Mt @ 3.92% Cu Redstone Property and 11.3g/t Ag. consists of 22 claims ‒ High grade zone currently open to the north and and 5 leases extending at depth to west and southwest NW-SE over 180km Hidden

Slide 19: Coates Lake Deposit – Redstone Copper Belt
COATES LAKE DEPOSIT – REDSTONE COPPER BELT Copper mineralization traced in outcrop for ~6km laterally along Transition Zone (view looking west) North end of deposit will be drill tested TSX.V: COL Image rendered using Leapfrog 3D: 50cm Geoeye satellite imagery draped over a DEM Redstone | 19

Slide 20: Coates Lake Deposit – Drill Targets
COATES LAKE DEPOSIT – DRILL TARGETS Chargeable IP anomalies at north end of Coates Lake Property that extend 3,000m along strike Chargeable IP anomalies at south end of Coates Lake Property extend 1,000m along strike Geological potential for a conceptual, stratiform, sedimentary rock-hosted co

Slide 21: Near Term Objectives
NEAR TERM OBJECTIVES OBJECTIVE TARGET STATUS Update Feasibility Study Q3 2012 Completed Advance Redstone Property Q3 2012 Completed Secure Water Use Licence Q4 2013/Q1 2014 Underway Arrange Financing Q3/Q4 2013 Pending Initiate Basic Engineering Q3/2013 Pending Commence Construction Q1 2014 Pend

Slide 22: Investment Opportunity
INVESTMENT OPPORTUNITY TSX.V: COL A Near Term Copper Producer | 22

Slide 23: Concluding Comments
CONCLUDING COMMENTS Operate in low-risk jurisdiction – Canada High-grade copper projects – 0.98% Cu at Carmacks – 3.92% Cu at Redstone Carmacks is near term – Production by early 2016 – Forecast production of ~30Mlbs p.a. (LME Grade A Copper Cathode) – Potential to expand oxide resource & rese

Slide 24: Share Capitalization
SHARE CAPITALIZATION CASH POSITION Cash on Hand C$0.5 M December 31, 2012 Short/Long Term Debt 0.0 SHARE STRUCTURE Share Price $0.07 May 1, 2013 Market Cap $4.1M Common Shares 58,762,781 Options 3,989,334 Warrants 3,384,500 Fully Diluted 66,136,615 COMMON SHARES Management & Board 8% May 1, 2013 Pri

Slide 25: Financing History
FINANCING HISTORY NON-BROKERED PRIVATE PLACEMENT Gross Proceeds C$200,000 Common Shares 800,000 November 16, 2011 Unit Price $0.25 *Warrants @ $0.28 800,000 NON-BROKERED PRIVATE PLACEMENT Gross Proceeds C$1,002,000 Common Shares 6,000,000 June 1, 2012 Unit Price $0.167 Warrants N/A NON-BROKERED PRIV

Slide 26: Appendix 1. Carmacks Reserve & Resource Estimate
APPENDIX 1. CARMACKS RESERVE & RESOURCE ESTIMATE Reserve Category Ktonnes Total Copper Acid Sol Cu Gold (g/t) Silver (g/t) (%) (%) Proven 4,127 1.04 0.851 0.559 5.39 Probable 7,424 0.94 0.78 0.365 3.76 Proven & Probable 11,551 0.98 0.805 0.435 4.34 Contained Metal 248.9 (Mlbs) Notes: Mineral reserve

Slide 27: Appendix 2: Valuation Metrics
APPENDIX 2: VALUATION METRICS (US₵/lb Cu Eq.) *Carmacks Copper Project *Includes Carmacks & Redstone Copper Property Discovery cost by major companies is approximately US₵4.0/lb Cu TSX.V: COL Valuation Metrics | 27 Source: Canaccord Genuity – Copper Comparables, Sept 21 2012. See Appendix 3 & 4.

Slide 28: Appendix 3. Copper Exploration & Development Universe
APPENDIX 3. COPPER EXPLORATION & DEVELOPMENT UNIVERSE TSX.V: COL Appendix 3 | 28

Slide 29: Appendix 4. Near-Term Junior Copper Producers
APPENDIX 4. NEAR-TERM JUNIOR COPPER PRODUCERS TSX.V: COL Appendix 4 | 29

Slide 30: Appendix 5. YESAB Assessment Process
APPENDIX 5. YESAB ASSESSMENT PROCESS Proposal Submission • Proposal to be submitted by Copper North in Q1 2013 Adequacy Review (includes Scoping & Screening) • Starting with adequate proposal – initial review to be completed in 60 days • Scoping document prepared by YESAB • Screening: Project Propos

Slide 31: Appendix 6. Oxide Heap Leach Operations (Chemical)
APPENDIX 6. OXIDE HEAP LEACH OPERATIONS (CHEMICAL) Property Country Operating Status Heap Type Annual Production (ktpa) Whim Creek Australia 2005 - 2009 Multi-Lift 18 Interlift liners San Manuel USA Closed 45.3 Nifty Australia 1998 - 2006 Multi-Lift 18 Interlift Liners Andacollo Chile 1996 - 2010 Mu

Slide 32: Appendix 7. Feasibility Study Assumptions
APPENDIX 7. FEASIBILITY STUDY ASSUMPTIONS ASSUMPTIONS & MODEL PARAMETERS October 2012 ‒ Base Case Metal Price (C$) 3.20/lb Cu ‒ Power (C¢/kWh) 10.5 ‒ Delivered cost of sulphur (C$/t) 233 (assumes sulphur netback price of C$74/t) ‒ Diesel C$/litre 1.04 ‒ Power Line Capital $9.7 million ‒ Mineral Reso

Slide 33: Appendix 8. Carmacks - Cross Section Main Ore Zone
APPENDIX 8. CARMACKS - CROSS SECTION MAIN ORE ZONE Deposit lies within the Yukon Cataclastic Terrane Deposit area underlain by intrusive and meta- intrusive rocks of the Granite Mountain Intrusion Granite Mountain granodiorite contains pendants of strongly foliated feldspar, biotite, horneblen

Slide 34: Contact
2050 – 1111 West Georgia Street Vancouver, BC V6E 4M3 T: 604.638.2505 F: 604.669.2926 www.coppernorthmining.com info@coppernorthmining.com May 2013 TSX.V:COL