Copper North Mining — Investor Presentation (October 2019)
28 slides from Copper North Mining's investor presentation, October 2019

Slide 1: Transforming the Carmacks Cu-Au-Ag Project
Transforming the Carmacks Cu-Au-Ag Project Yukon, Canada Doug Ramsey, President and CEO Oct 2019 TSX.V:COL

Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

Slide 3: Focused on the Carmacks Project
Focused on the Carmacks Project CARMACKS OXIDE Cu-Au-Ag PROJECT 100% owned Advanced-stage development asset SX/EW cathode copper and gold/silver doré production Positive 2017 PEA Located in mining-friendly Yukon, Canada Based on 7-year mine life Measured & Indicated Resource 11.98 Mt @ 1.07% Cu, 0.4

Slide 4: Copper North – Capital Structure
Copper North – Capital Structure Capital Structure (as at 30 June 2019) Issued 85,900,413 Options 5,264,000 Warrants 17,101,066 Fully Diluted 108,265,479 TSX.V: COL Capital Structure | 4

Slide 5: Our Experienced Team
Our Experienced Team Management – Directors - Advisors Doug Ramsey, M.Sc., R.P.Bio. – President, CEO, and Director Ø Over 35 years experience in permitting, development, operations, and closure of base and precious metal mines. Previously, VP Sustainability and Environmental Affairs at Copper North

Slide 6: Carmacks Project – Far from Remote
Carmacks Project – Far from Remote In the heart of the Carmacks Copper Belt TSX.V: COL Far from Remote | 6

Slide 7: Project Road Access Today
Carmacks Project Road Access Today TSX.V: COL Road Access Today | 7

Slide 8: Transforming the Carmacks Project: In the beginning
Transforming the Carmacks Project In the beginning (2011 for Copper North) Ø When Copper North acquired the Carmacks property in 2011, the project was planned as a copper-only heap leach with a relatively short 7 year mine life Ø In particular, the heap leaching plan ignored the precious metals in t

Slide 9: Transforming the Carmacks Project: Building Value
Transforming the Carmacks Project Building Value Building value in the Carmacks Project by: Ø Maximizing metal recovery from the mineral resource § By including precious metals recovery along with copper recovery § Resulting in a low-cost potential producer (after precious metal credits) Ø Expanding

Slide 10: Maximizing Metal Recovery
Carmacks Copper-Gold-Silver Project Building Value Maximizing Metal Recovery Ø Oxide deposit grades 1.07% Cu, 0.45 g/t Au, and 4.5 g/t Ag (Zones, 1, 4, 7, and 7A) Ø Historical plan was to heap leach and only recover copper Ø Selected two-stage agitated tank leach process expected to efficiently reco

Slide 11: Engineering a Potential Low-cost Copper Producer
Carmacks Copper-Gold-Silver Project Building Value Engineering a Potential Low-cost Copper Producer Ø Precious metals recovery adds to project value compared to copper recovery only (2017 PEA) Ø Result is a potential low-cost Cu producer after precious metals credits (estimated US$1.08/lb C1 cash co

Slide 12: Two-Stage Agitated Tank Leaching
Carmacks Cu-Au-Ag Project Two-Stage Agitated Tank Leaching TSX.V: COL Two-Stage Agitated Tank Leaching | 12

Slide 13: Planned Mine Site Layout
Carmacks Copper-Gold-Silver Project Planned Mine Site Layout Dry Stack TMA Waste Rock Open Pit Process Plant Camp TSX.V: COL Carmacks Site Plan | 13

Slide 14: Project Economics
Carmacks Project Economics Cu US$1.75/lb Cu US$2.50/lb Cu US$2.75/lb Cu US$3.25/lb Au US$1,300/oz Au US$1,300/oz Au US$1,300/oz Au US$1,300/oz Ag US$17.50/oz Ag US$17.50/oz Ag US$17.50/oz Ag US$17.50/oz 2017 PEA 2017 PEA 2017 PEA 2017 PEA Sensitivityb Basea Sensitivityd Sensitivityc 30M lbs Cu 30M l

Slide 15: Summary of the Gold Benefit
Carmacks Project Economics Summary of the Gold Benefit Adding Gold Recovery has potential economic benefits for the project (2017 PEA): Ø C1 cash cost of copper production, after precious metal credits, estimated at US$1.08/lb (at US$1,300/oz Au) making the project a legitimate low-cost potential pr

Slide 16: Expanding the Mineral Resource
Carmacks Copper-Gold-Silver Project Building Value Expanding the Mineral Resource Ø Copper North resumed exploration of the Carmacks property in 2014, after a 6-year hiatus, and continued in 2015 and 2017 Ø Focused on known oxide copper-gold mineralised targets along a 6 km long north/south trend Ø

Slide 17: The Right Neighbourhood for Copper
Carmacks Exploration Potential The Right Neighbourhood for Copper Western Canada Project Copper Grades - 2018 TSX.V: COL Western Canada – Project Copper Grades 2018 | 17

Slide 18: Exploration Focused on Known Mineralised Zones
Carmacks Exploration Building Value Exploration Focused on Known Mineralised Zones 2015 + 2017 Drilling 2017 PEA Basis 2014 Trench/Drill TSX.V: COL Exploration Target Zones | 18

Slide 19: Example Carmacks Drill Core
Example Carmacks Drill Core Oxide Transition to Sulphide Copper Oxide Zone Oxide Zone Transition Zone with Native Copper Sulphide Zone TSX.V: COL Carmacks – Oxide and Sulphide Mineral Resource | 19

Slide 20: Near-Surface Mineralisation
Carmacks Exploration Near-Surface Mineralisation TSX.V: COL Near-Surface Mineralisation | 20

Slide 21: Expanding the Mineral Resource: 2015 and 2017 Drilling
Carmacks Project Expanding the Mineral Resource 2015 Drilling Ø 3,271 m of infill and step-out diamond drilling in Zones 2000S, 12, and 13: § Oxide Measured+Indicated resource tonnes increased by 31%; § Sulphide Measured+Indicated resource tonnes increased by 85%; § Combined oxide and sulphide miner

Slide 22: 2017 Exploration – Filling in the Gaps
2017 Exploration – Filling in the Gaps North-South Longitudinal Section Showing Oblique 3-D View of Oxide, Sulphide, and Transition Mineralisation Sulphide open at depth along entire strike length TSX.V: COL Exploration – 2017 Drill Targets | 22

Slide 23: Oxide Mineral Resource Estimate (2018)
Carmacks Project Oxide Mineral Resource Estimate (2018) Acid- Total Sulphide Au Ag Zones Class Tonnes soluble Mine Life Cu (%) Cu (%) (g/t) (g/t) Cu (%) ME+IN4 11,980,000 1.07 0.86 0.21 0.456 4.578 First 7 Years 1, 4, 7, 7A 1 Inferred5 90,000 0.73 0.53 0.20 0.128 1.809 (PEA)3 ME+IN 4,304,000 0.47 0.

Slide 24: Sulphide Mineral Resource Estimate (2018)
Carmacks Project Sulphide Mineral Resource Estimate (2018) Sulphide Resource has potential for expansion and addition to future processing Acid- Resource Total Sulphide Au Ag Zone Class Tonnes soluble Domain Cu (%) Cu (%) (g/t) (g/t) Cu (%) ME+IN 4,340,000 0.75 0.03 0.72 0.22 2.33 1 Inferred 4,031,0

Slide 25: Progressive Transformation: Value Added So Far
Carmacks Cu-Au-Ag Project Progressive Transformation Value Added – So Far! Ø Re-engineered process – two-stage agitated tank leaching allows recovery of oxide copper and precious metals • Improves estimated project economics compared to recovery of copper only • 4-hour copper leach time estimated to

Slide 26: Continuing to Build Value – Next Steps
Carmacks Project Continuing to Build Value – Next Steps Feasibility Engineering Ø Advance metallurgical process engineering to feasibility level (Q4 2019/Q1 2020), focusing on: § reducing process plant capital costs (target 8% CAPEX reduction); and, § optimizing the process to minimize reagent requi

Slide 27: Strengths + Opportunities = Investment Value
Carmacks Cu-Au-Ag Project Strengths + Opportunities = Investment Value STRENGTHS Ø Advanced Stage Ø Positioned to take advantage of looming • As soon as 3.5 years to production (subject copper supply short-fall to feasibility study and a production decision) Ø Poised for re-rating as de-risking cont

Slide 28: Join us in the Transformation!
Carmacks Cu-Au-Ag Project Join us in the Transformation! Suite 1120 – 1095 West Pender St. Vancouver, BC V6E 2M6 T: 604.398.3452 F: 604.398.3456 www.coppernorthmining.com info@coppernorthmining.com Oct 2019 TSX.V:COL