  1. Slide 1: A New Direction: Developing Copper Assets in Canada's North

    Slide 1: A New Direction: Developing Copper Assets in Canada's North

    A New Direction Developing Copper Assets in Canada’s North Oct 28, 2014 May 2013 TSX.V:COL

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

  3. Slide 3: Development & Exploration Projects

    Slide 3: Development & Exploration Projects

    DEVELOPMENT & EXPLORATION PROJECTS Development CARMACKS PROJECT 100% (Yukon, Canada) Proven & Probable Reserves 11.6Mt @ 0.98% Cu, 0.43g/t Au and4.34g/t Ag. YUKON 249 M lbs Contained Copper, NORTHWEST 161,000 oz Au & 1,610,000 oz Ag TERRITORIES Copper-Gold-Silver Deposit Exploration BRITISH REDSTONE

  4. Slide 4: Copper North - Restructuring

    Slide 4: Copper North - Restructuring

    COPPER NORTH - Restructuring  Corporate Restructuring: March 1, 2014 appointment of Dr. Harlan Meade as President and CEO, having more than 30 years of exploration and development experience in the Yukon and globally.  Financial Restructuring: Payment of arrears to service providers and eliminatio

  5. Slide 5: Copper North - TSX.V:COL Capital Structure

    Slide 5: Copper North - TSX.V:COL Capital Structure

    COPPER NORTH – TSX.V.COL Capital Structure Issued: 92,882,698 Options: 6,285,834 Warrants: 19,400,850 Fully Diluted: 115,119,382 Working Capital Cash: $913,000 Payables: Arrears $350K As at June 30, 2014 • Includes growth proceeds from August 20, 2014 financing. • Additional $1.3M financing in progr

  6. Slide 6: Copper North Investment Attraction

    Slide 6: Copper North Investment Attraction

    COPPER NORTH INVESTMENT ATTRACTION  Canada and Yukon: low political risk jurisdiction, stable tax regime, current exchange rate favourable for investors, and 100% ownership.  Road accessible; new 10km transmission line to the grid.  High-grade copper oxide with significant gold and silver.  Redu

  7. Slide 7: Carmacks Copper - Good Infrastructure

    Slide 7: Carmacks Copper - Good Infrastructure

    CARMACKS COPPER - Good Infrastructure TSX.V: COL Carmacks Location | 7

  8. Slide 8: Benchmarking - SXEW Copper Leach

    Slide 8: Benchmarking - SXEW Copper Leach

    CARMACKS BENCHMARKING - SXEW COPPER LEACH Carmacks Copper: unique, high grade and significant gold and silver credits. Heap Leach Status % Measured & Indicated Inferred Annual Capex Op Cost Other Projects Tonnes Cu Cu sol% Tonnes Cu Cu sol Production (M$) US$/lb (Million) % (million) % % M lbs Cu Ca

  9. Slide 9: Carmacks Project - Reserve & Resource Estimate

    Slide 9: Carmacks Project - Reserve & Resource Estimate

    CARMACKS PROJECT - RESERVE & RESOURCE ESTIMATE Resource Ktonnes Total Copper Acid Sol Cu Gold (g/t) Silver (g/t) Category (%) (%) Measured 4,031 1.10 0.90 0.588 5.666 Indicated 7,949 1.04 0.83 0.391 4.039 OXIDE M+I 11,980 1.07 0.86 0.456 4.578 Inferred 90 0.73 0.53 0.128 1.809 Measured 695 0.80 0.02

  10. Slide 10: Carmacks Project - Favourable Site Development

    Slide 10: Carmacks Project - Favourable Site Development

    CARMACKS PROJECT – Favourable Site Development Copper on/off pad or leach vats Zone 2 Extension Proposed Au&Ag leach pad Zone 1, 4 and 7 Resources Zones 12 and 13 TSX.V: COL Mine Site With Exploration Workings | 10

  11. Slide 11: Carmacks Project - Oxide Ores

    Slide 11: Carmacks Project - Oxide Ores

    CARMACKS PROJECT - Oxide Ores Oxide copper mineralization within rapidly developing new copper-gold district in north central Yukon; deep weathering profiles preserved, similar to as in other arid and semi-arid low latitude environments. TSX.V: COL | 11

  12. Slide 12: Carmacks Project - Geology & Mineral Zones

    Slide 12: Carmacks Project - Geology & Mineral Zones

    CARMACKS PROJECT – Geology & Mineral Zones  Carmacks deposits Resource & Reserves open at depth & oxidised to ~230m  Malachite, cuprite, Section 400N azurite and tenorite minerals dominate oxide mineralization  All Resources and Reserves based on zones 1,4, 7 & 7A  Exploration upside potential i

  13. Slide 13: Carmacks Project - Cross Section Main Ore Zone

    Slide 13: Carmacks Project - Cross Section Main Ore Zone

    CARMACKS PROJECT - Cross Section Main Ore Zone  Deposit lies within the Yukon Cataclastic Terrane of deformed granitic rocks.  Granite Mountain contains pendants of strongly foliated feldspar, biotite, hornblende-quartz gneisses that host the copper-gold-silver mineralization.  Structurally contr

  14. Slide 14: Carmacks Project - Zone 1 Oxide Copper

    Slide 14: Carmacks Project - Zone 1 Oxide Copper

    CARMACKS PROJECT – Zone 1 Oxide Copper Zones 12 & 13 Zone 1 malachite and tenorite copper minerals: fracture coatings and disseminated oxide mineralization. Recovery 85%Cu, 78%Au &75%Ag. TSX.V: COL Zone 1 copper oxices | 14

  15. Slide 15: Carmacks Project - 2014 Strategic Review

    Slide 15: Carmacks Project - 2014 Strategic Review

    CARMACKS PROJECT – 2014 Strategic Review Re-engineering in progress with changes to leach process simplified operating plan is key to Capex and Opex cost reduction, and improved project economics. THREE PHASE PLAN:  Phase I - Preliminary Economic Assessment, adding gold and silver recovery and Fore

  16. Slide 16: Carmacks Copper-Gold-Silver

    Slide 16: Carmacks Copper-Gold-Silver

    Carmacks Copper-Gold Silver • Next copper mine in Yukon • High grade 1% copper oxide • Strong gold and silver credits • Feasibility study targeted Oct Joint 2015 Canada-China Feasibility Study • • Forecast Re-engineering to simplify production operations and reduce CAPEX and OPEX. Q1 2017 • • Annual

  17. Slide 17: Carmacks Project - New Feasibility Study

    Slide 17: Carmacks Project - New Feasibility Study

    CARMACKS PROJECT – New Feasibility Study Copper North engages JDS and BGRIMM to complete a joint feasibility study for Carmacks Project to re- engineer the project to provide improved operational efficiency and reduced capital and operating costs. JDS responsible for completion of the NI 43-101 comp

  18. Slide 18: Carmacks Project - Re-engineering Steps

    Slide 18: Carmacks Project - Re-engineering Steps

    CARMACKS PROJECT – Re-engineering Steps TSX.V: COL Evolution Of New Leach Plan | 18

  19. Slide 19: Carmacks Project - Addition of Gold-Silver Recovery

    Slide 19: Carmacks Project - Addition of Gold-Silver Recovery

    CARMACKS PROJECT – Addition of Gold-Silver Recovery  Strategic Review Plan and Progress:  Phase I, re-engineer processing plan to transfer leached copper ores to the previously proposed heap leach pad for recovery of gold, silver and residue copper by cyanidation.  Phase II, undertake additional

  20. Slide 20: Copper Vat Leach Plan - Improved Efficiency

    Slide 20: Copper Vat Leach Plan - Improved Efficiency

    Copper Vat Leach Plan- Improved Efficiency Phase I : Addition of Gold and Silver Recovery Simplified Flow Sheet » Measured & Indicated mineral resource containing161,000 ounces of gold and 1,610,000 ounces of silver. » 128,000 ounces payable gold and 1,230,000 ounces payable silver assuming recovery

  21. Slide 21: Carmacks Copper - 2014 Gold & Silver Modelling

    Slide 21: Carmacks Copper - 2014 Gold & Silver Modelling

    CARMACKS COPPER – 2014, Gold & Silver Modelling Phase I Preliminary Modelling Gold & Silver Recovery and Forex Adjustment. LOM Carmacks M3 Feasibility PEA • Annual recovery of 17,300 oz gold Project (US$) Cu only Cu+Au+Ag recovery and 165,000 oz silver Gross Net Revenues $678M $892M • Gold-silver cr

  22. Slide 22: Carmacks Project - Before Tax NPV Sensitivity Analysis

    Slide 22: Carmacks Project - Before Tax NPV Sensitivity Analysis

    CARMACKS PROJECT – BeforeTax NPV Sensitivity Analysis Sensitivity analysis illustrates the impact on Before Tax NPV(8%) for the key parameters. Base Case US$66M, with NPV and % change from Base Case. The project economics are most sensitive to changes in copper price, exchange rate and operating cos

  23. Slide 23: Phase II - Re-engineering and Cost Reduction

    Slide 23: Phase II - Re-engineering and Cost Reduction

    PHASE II - Re-engineering and Cost Reduction » Evaluate vat leaching alternative for copper and gold & silver, to minimize extensive earthworks and pad liner expense associated with heap leach pad operations. » Sourcing of detailed engineering and procurement of key equipment components from Chinese

  24. Slide 24: Phase II - Copper Vat Leaching Vs Heap Leaching

    Slide 24: Phase II - Copper Vat Leaching Vs Heap Leaching

    PHASE II- Copper Vat Leaching Vs Heap Leaching » Copper Vat Leaching: – Shorter leach time of 3 to 4 weeks as compared to 12 month leach time for heap leaching of copper. – Slow dispersing of weak sulphuric acid in heap leach versus soubmerging the crushed ore in a weak sulphuric acid bath in the va

  25. Slide 25: Carmacks Copper - Permitting Framework

    Slide 25: Carmacks Copper - Permitting Framework

    CARMACKS COPPER – Permitting Framework Copper North to complete re-engineering and finalize the development plan before re- entering the permitting process. The Phase I and II are expected to be substantially completed in Q4, 2014.  Complete Technical Review with First Nations Q1 2015 − Letter of I

  26. Slide 26: Carmacks Project - First Nations and Community

    Slide 26: Carmacks Project - First Nations and Community

    CARMACKS PROJECT – First Nations and Community » Copper North has initiated in improved consultation program with local First Nations, providing them the key technical information on the project as it is produced and ensuring they have sufficient time and resources to review the information, and hav

  27. Slide 27: Carmacks Project - New Discovery Extends Zone 2

    Slide 27: Carmacks Project - New Discovery Extends Zone 2

    CARMACKS PROJECT – New Discovery Extends Zone 2 Zone 2, 1980’s surface trench, with steep dipping shear structure and oxide copper mineralization. Historic trench sampling of 45.7 metres grading 1.0% copper. Exploration largely dormant since initial trench work; excepting small geophysical survey wo

  28. Slide 28: Carmacks Project - New Discovery Extends Zone 2

    Slide 28: Carmacks Project - New Discovery Extends Zone 2

    CARMACKS PROJECT – New Discovery Extends Zone 2 Zone 2 • Expanded the strike length of Zone 2 mineralization from 100 metres to 500 metres; drill results pending. • Open to expansion to southwest towards Zone 1 Extension Area. Zone 1 North Extension • Major target area north of the bounding cross fa

  29. Slide 29: Carmacks Project - Zone 2 Extension

    Slide 29: Carmacks Project - Zone 2 Extension

    CARMACKS PROJECT – Zone 2 Extension Discovery trench extending Zone 2 from 100 metres length to more than 500 metres. Note permafrost cover (wet area) at contact with copper oxide mineralization. TSX.V: COL Project Opportunities | 29

  30. Slide 30: Appendix 1: Resource Expansion Opportunities

    Slide 30: Appendix 1: Resource Expansion Opportunities

    APPENDIX 1: Resource Expansion Opportunities Expansion of Oxide Mineral Resources: » M3 Feasibility Study only considers processing the 10.6 million tonnes of oxide ore contained in Zones 1, 4, and 7. Current permit allows for processing of up to 16.3 million tonnes of oxide ore. » Oxide ore also id

  31. Slide 31: Zones 2000S, 12 and 13 Oxide Intercepts

    Slide 31: Zones 2000S, 12 and 13 Oxide Intercepts

    Zones 2000S, 12 and 13 Oxide Intercepts Zone 5 Oxide Hole From (m) To (m) Width (m) Cu (%) CuOx (%) WC-015 116.0 117.0 1.0 1.82 0.75 WC-016B 95.0 97.0 2.0 1.16 0.81 Zone 2000S Oxide WC-039 30.5 41.3 10.8 0.72 0.63 RC-92-01 45.7 56.4 10.7 0.67 RC-92-10 38.1 44.2 6.1 0.63 WC-033 104.3 120.0 15.7 0.51

  32. Slide 32: Appendix 1: Carmacks Sulfide Intercepts

    Slide 32: Appendix 1: Carmacks Sulfide Intercepts

    APPENDIX 1: Carmacks Sulfide Intercepts Zone 2000S Sulfide From To Width Cu CuOx Au Ag Mo Hole (m) (m) (m) (%) (%) (g/t) (g/t) (ppm) WC-037 107.6 116.0 8.4 1.61 0.03 0.33 9.37 414 WC-034B 125.0 162.5 37.5 0.88 0.04 0.17 51.43 171 WC-033 120.0 146.0 26.0 0.53 0.01 0.12 1.97 74 WC-043 210.7 214.8 4.1

  33. Slide 33: Thor Property Acquisition - Elephant Hunting near Kemess

    Slide 33: Thor Property Acquisition - Elephant Hunting near Kemess

    THOR PROPERTY ACQUISITION– Elephant Hunting near Kemess Kemess Mine, north central B.C. TSX.V: COL | 33

  34. Slide 34: Thor Property: North Central British Columbia

    Slide 34: Thor Property: North Central British Columbia

    THOR PROPERTY: North Central British Columbia TSX.V: COL | 34

  35. Slide 35: Thor Property: Road Accessible

    Slide 35: Thor Property: Road Accessible

    THOR PROPERTY: Road Accessible TSX.V: COL | 35

  36. Slide 36: Thor Project - Unique Discovery Opportunity

    Slide 36: Thor Project - Unique Discovery Opportunity

    THOR PROJECT – Unique Discovery Opportunity Thor Project: A Unique Opportunity For Discovery Adjacent The Shutdown Kemess Mine. ▲ Large property (13,000 hectares) located 20 km south of Kemess and straddling main access road and power lines. ▲ Not previously explored due to extensive overburden cove

  37. Slide 37: Thor Acquisition: Terms

    Slide 37: Thor Acquisition: Terms

    THOR ACQUISITION: Terms  Purchase Agreement for 100% Interest :  Cash payments aggregating $525,000 over 6 years  Exploration expenditures aggregating $5M over 6 years  Issuance of 5 million shares of Copper North over 5 years  2% Net Smelter Return Royalty capped at $5M  Acquisition structure

  38. Slide 38: Kemess Mine: Operations and Development History

    Slide 38: Kemess Mine: Operations and Development History

    KEMESS MINE: Operations and Development History Kemess South (depleted) ▲ 15 years open pit operations at 52,000 tpd producing copper concentrates. ▲ LOM tonnage of 218.5M tonnes grading 0.209% copper and 0.626 g/t gold. ▲ Mill facilities and mine infrastructure on care and maintenance. Kemess North

  39. Slide 39: Northwest View Of Moose Valley & Takla Host Rocks

    Slide 39: Northwest View Of Moose Valley & Takla Host Rocks

    Northwest View Of Moose Valley & Takla Host Rocks TSX.V: COL | 39

  40. Slide 40: Kemess Mine: Geology

    Slide 40: Kemess Mine: Geology

    KEMESS MINE: Geology Porphyry copper-gold and epithermal deposits in the Toodoggone District, NW B.C.. Thor target area to the southeast of Kemess hosted in Takla Volcanic Suite and Black Lake Intrusive Suite. TSX.V: COL | 40

  41. Slide 41: Thor Acquisition: Geology

    Slide 41: Thor Acquisition: Geology

    THOR ACQUISITION: Geology Thor Property is southern extension of copper-gold porphyry belt. Early Jurassic Black Lake intrusions hosted by Mid-Triassic Takla volcanic suite. Major post mineral faulting exposes intrusive complex and porphyry systems. Thor Property interpreted to host different levels

  42. Slide 42: Kemess Mine: Operations and Development History

    Slide 42: Kemess Mine: Operations and Development History

    KEMESS MINE: Operations and Development History Kemess South (depleted) ▲ 15 years open pit operations at 52,000 tpd producing copper concentrates. ▲ LOM tonnage of 218.5M tonnes grading 0.209% copper and 0.626 g/t gold. ▲ Mill facilities and mine infrastructure on care and maintenance. Kemess North

  43. Slide 43: Thor Acquisition - Exploration Plan

    Slide 43: Thor Acquisition - Exploration Plan

    Thor Acquisition – Exploration Plan Geophysical Surveys –Fall 2014 » Shallow Induced Polarization (IP) surveys were completed in 2007 and more deep penetrating regional IP was conducted on wide line spacing in 2012. » Completion of the regional IP survey coverage, and fill-in survey for defining dri

  44. Slide 44: Appendix 3: Copper Markets Outlook - May 2014

    Slide 44: Appendix 3: Copper Markets Outlook - May 2014

    APPENDIX 3 Copper Markets Outlook - May 2014 TSX.V: COL | 44

  45. Slide 45: Appendix 3: Copper Supply - Demand Outlook

    Slide 45: Appendix 3: Copper Supply - Demand Outlook

    APPENDIX 3:Copper Supply - Demand Outlook New mine supply leads to refined copper surplus in 2014 and 2015, then transitions to deficit in 2016. TSX.V: COL | 45

  46. Slide 46: Appendix 3: Copper Project Delays - Soon A Problem

    Slide 46: Appendix 3: Copper Project Delays - Soon A Problem

    Appendix 3:Copper Project Delays - Soon A Problem Project delays defer any significant new mine production until 2016 and 2017; leads to deficit starting 2016. TSX.V: COL | 46

  47. Slide 47: Appendix 3: Copper Price Overview

    Slide 47: Appendix 3: Copper Price Overview

    APPENDIX 3: Copper Price Overview Copper price forming an approximate base of US$3.00/lb (US$6600/tonne). Current price is cutting into 90th percentile of the cost curve; any production loss will cause supply deficit and lead to higher copper price to rebalance market. LME Cash Cost, Cutting Into Pr

  48. Slide 48: Appendix 3: New Mine Project Pipeline

    Slide 48: Appendix 3: New Mine Project Pipeline

    APPENDIX 3: New Mine Project Pipeline C1 Cash Cost required for proposed new mines needed by 2020 to meet the forecast 5 million tonnes of new copper supply demand: median incentive price is US$3,703/tonne or US$1.68/lb copper for C1 cash cost, or US$5,604/t (US$2.54/lb) for copper, including indire

  49. Slide 49: Appendix 3: Copper Market Outlook and Carmacks Project

    Slide 49: Appendix 3: Copper Market Outlook and Carmacks Project

    APPENDIX 3: Copper Market Outlook and Carmacks Project Copper Markets • Forecast 3.7% global growth in copper consumption over 2013 to 2018, provides opportunity for new mine production. Analysts are forecasting a need for 5M tonnes of new mine production by 2020. • Near term surplus of refined copp

  50. Slide 50: Appendix 2: Corporate

    Slide 50: Appendix 2: Corporate

    APPENDIX 2: CORPORATE  Dale Corman - Non-Executive Chairman – Former Chairman & Chief Executive Officer of Western Silver Corp. (sold in 2006 to Glamis)  Dr. Harlan Meade – President, CEO and Director Former President and CEO Selwyn Resources Ltd.; Yukon Zinc Corporation  Bill LeClair - Director

  51. Slide 51: Contact: Copper North, Vancouver

    Slide 51: Contact: Copper North, Vancouver