Talisker Resources Ltd. · TSX:TSK
Talisker Resources — Investor Presentation (June 2024)
22 slides from Talisker Resources's investor presentation, June 2024
Slide 1: High-Grade Gold Production Corporate Presentation
TSX : TSK OTCQX : TSKFF High-Grade Gold Production Corporate Presentation June 2024 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 1
Slide 2: Forward-Looking Statements
Forward-Looking Statements Certain statements in this presentation constitute forward-looking information, which reflect the expectations of management Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance. The use of any of the words “could”, “
Slide 3: Gold Production Imminent: Key Points
Key Points Access & Strong Infrastructure Leadership Highway access to Over 50Moz Vancouver and Discovered - Toll Milling Experienced Board Facilities Growing Permitted Resource Base and Advisors 2 Fully permitted 1.7Moz at 6.4 g/t resource stage Strongly Au at the Bralorne assets Gold Project* Capi
Slide 4: Located in the Heart of BC Mining
Located in the Heart of BC Mining ▪ Highway Access ▪ Connected to Grid Power ▪ Multiple Toll Milling Facilities 4 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 4
Slide 5: Rapid Pathway to High Margin Gold in 2024
Funded to Fully Permitted Key Indigenous Extensive High- Production for Mining Agreements In Grade Resource place + clear resource expansion Rapid Pathway to High Margin Gold in 2024 Offsite Limited 100koz/y Self Funding Processing = Development to production Growth Low capex access ore = target Str
Slide 6: On Track for Near Term Success
Milestones and Upcoming Major Catalysts 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 ✓ Engineering Studies 165,000m of Drilling ✓ Updated Mine Plan ✓ Results from Drill Program Inaugural Resource ✓ Portal Construction ✓ Ore Sale Agreement ✓ January 2023 Development Funding ✓ Decline Construction ✓ 2nd Milling Agreem
Slide 7: Peer Group | Select North American Gold Companies
Peer Group | Select North American Gold Companies Significant re-rate potential for Talisker on an EV / oz basis Producers (EV / oz AuEq) (C$) $502 $413 $239 $89 $82 Median: $82 $52 $47 $43 $17 $18 Wesdome Gold Fortitude Gold New Gold Orla Mining Victoria Gold Elevation Gold Ascot Resources i-80 Gol
Slide 8: Value Proposition
Value Proposition Growing Production Profile Pathway to 100koz/y production in 4 years Analyst Coverage Target Price**** Large Exploration Upside** $2.00 5Moz+ upside based on historic drift assays and drilling + Strong pipeline of Greenfields Projects $2.00 Strong High-Grade Resource Base*** 1.7Moz
Slide 9: Share Structure and Capitalization
Share Structure and Capitalization Strong Institutional Shareholders Capital Structure (May 31st, 2024) Common Shares Outstanding 89,198,377 Warrants1 11,504,733 Options + RSUs 1,463,335 Fully Diluted Shares Outstanding 102,166,445 Market Capitalization (Jun 6th) ~$45 million (1) 5,679,600 of the ou
Slide 10: Bralorne - BC's Iconic Gold Camp
Bralorne - BC’s Iconic Gold Camp ▪ Over 40 years of production (1929-1971)- 4.2Moz @ 17.7g/t ▪ 2,300oz/vertical metre average ▪ Orogenic veins, structural continuity defined for 2.5 km along strike and 1.9 km depth ▪ Ore shoot continuity demonstrated for up to 1.5 km ▪ High-grade vein core surrounde
Slide 11: 2024 Resource Conversion Program
2024 Resource Conversion Program ▪ 129.99 g/t Au over 2.00 Metres ▪ 97.40 g/t Au over 2.00m within 38.17 g/t Au over 5.20m ▪ 86.50 g/t Au over 1.50 m within 14.31 g/t Au over 9.55m ▪ 80.68 g/t Au over 2.20m within 28.58 g/t Au over 6.35m ▪ 40.82 g/t Au over 2.60m within 8.54 g/t Au over 13.45m ▪ 37.
Slide 12: Clear Extensive Upside
Bralorne Gold Mines Clear Extensive Upside 2023 Mineral Resource and Undrilled Potential Mustang Mine Bralorne Pioneer Surface Legend Stope Optimized Resource (2023) Exploration Targets Existing Underground Infrastructure Undrilled potential UNDRILLED POTENTIAL constrained by drift assays Mustang Mi
Slide 13: Bralorne District-Scale Upside
Bralorne District-Scale Upside ▪ 7 historical mines, 47 known mineral occurrences ▪ 33 km belt amalgamated by Talisker capturing mineralization associated with major suture zone ▪ Historic Resource 186Koz @ 9.1 g/t Au at Congress from surface to 200m * ▪ BRX first-pass drilling results up to 329 g/t
Slide 14: Ladner Gold Project
Ladner Gold Project ▪ 5 Historical Mines – 24 Known Gold Occurrences ▪ Compliant 691,540oz Inferred Gold Resource* ▪ Major Mines Permit (M-138) in place ▪ 144km2 contiguous land package – ~28kms x 5kms ▪ Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) ▪ Extensiv
Slide 15: Ladner Tailings JV
Ladner Tailings JV ▪ Signed LOI with Regeneration Enterprises to form JV to process tailings ▪ Regeneration to fund, Talisker to retain equipment and facilities ▪ Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU ▪ R
Slide 16: Corporate Head Office
TSX : TSK OTCQX : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 1T1 Terry Harbort, President and CEO +1(416) 357-0227 terry.harbort@taliskerresources.com Matt Filgate, VP , Corporate and Strategic Development +1(778) 679-3579 matt.filgat
Slide 17: Endnotes
Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified p
Slide 18: Endnotes – continued
Endnotes – continued • High grade capping, supported by statistical analysis, was applied to composited data inside the high-grade quartz veins for Pioneer (1.4 m) at 100 g/t Au, Bralorne (1.4 m) at 100 g/t Au, Charlotte (1.0 m) at 31 g/t Au and King (1.2 m) at 110 g/t Au for the drill hole samples
Slide 19: Corporate Leadership
Corporate Leadership Management Terry Harbort – CEO, President, Matt Filgate –VP, Corporate and Leonardo de Souza – QP VP, Director Strategic Development Exploration and Resource Development ▪ PhD in Structural Geology and Tectonics. ▪ Matt is Regional Project Geologist for Talisker ▪ 35 years exper
Slide 20: Corporate Leadership: Non Executive Directors
Corporate Leadership Non Executive Directors Morris Prychidny (1)(2) Christy Smith (2)(3) Eric Tremblay (2*)(3*) Chairman ▪ 25 years of proven expertise working ▪ BSc. in mining engineering and mineral with natural resource companies and ▪ Chartered Accountant with 35+ years indigenous communities p
Slide 21: Bralorne Vein Array
Excellent mineability due to Parallel vein sets provide high-grade continuity, vein Bralorne Vein Array potential for numerous adjacent mining fronts structural continuity, high dip angle Cross Section (415,450 mE) Plan View Many veins defined to near surface Excellent structural continuity down dip
Slide 22: Bralorne Inaugural Mineral Resource Estimate (MRE)
Bralorne Inaugural Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) King Indicated Long Hole > 2.65 111,300 8.61 30,800 Cut and Fill > 3.10 5,900 13.45 2,600 Inferred Long Hole > 2.65 1,598,400 5.76 296,200 Cut and Fill >
Talisker Resources — Investor Presentation (June 2024) on 6ix