Talisker Resources Ltd. · TSX:TSK

Talisker Resources — Investor Presentation (November 2023)

21 slides from Talisker Resources's investor presentation, November 2023

  1. Slide 1: Transition to Production

    TSX : TSK OTCQX : TSKFF Transition to Production Corporate Presentation November 2023 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 1

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Certain statements in this presentation constitute forward-looking information, which reflect the expectations of management Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance. The use of any of the words “could”, “

  3. Slide 3: Key Points

    Key Points Access & Strong Infrastructure Leadership Highway access to Over 50Moz Vancouver and Discovered - Toll Milling Experienced Board Facilities Growing Permitted Resource Base and Advisors Fully permitted 1.7Moz at 6.4 g/t resource stage Au at the Bralorne assets Gold Project* Strongly Low Ca

  4. Slide 4: Rapid Pathway to High Margin Gold

    Funded to Fully Permitted Key Indigenous Extensive High- Production for Mining Agreements In Grade Resource place + clear resource expansion Rapid Pathway to High Margin Gold Offsite Limited 100oz/y Self Funding Processing = Development to production Growth Low capex access ore = target Strategy rap

  5. Slide 5: Location in the Heart of BC Mining

    Location in the Heart of BC Mining Flagship Asset 350km from Vancouver ▪ Highway access to projects ▪ Multiple toll milling facilities ▪ Easy access to power ▪ Advanced greenfields portfolio 5 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 5

  6. Slide 6: Bralorne - BC's Iconic Gold Camp

    Bralorne - BC’s Iconic Gold Camp ▪ Over 40 years of production (1929-1971)- 4.2Moz @ 17.7g/t ▪ 2,300oz/vertical metre average ▪ Orogenic veins, structural continuity defined for 2.5 km along strike and 1.9 km depth ▪ Ore shoot continuity demonstrated for up to 1.5 km ▪ High-grade vein core surrounde

  7. Slide 7: Key Points - Bralorne

    Key Points - Bralorne 96% average metallurgical recovery 65% free gold Consolidated 100% owned 14,000ha Brownfields camp 1.7Moz at 47 historic gold occurrences 6.4 g/t Au on 33km trend 150,000+m drilling completed Fully diluted Clear Pathway to 5Moz+ Au 86 veins identified, 75 open in all directions

  8. Slide 8: Upcoming Major Catalysts

    Upcoming Major Catalysts 2023-2024 Q1 - 2023 Q3 - 2023 Q2 - 2024 Resource Conversion Drilling Engineering Studies Updated Mine Plan Inaugural Resource Portal Construction Start Test Production January 2023 Trucking of First Ore Development Funding Decline Construction Secured (US$31.25M) Ore Sale Ag

  9. Slide 9: Value Proposition

    Value Proposition Undervalued Secondary Assets* Resource-ready secondary assets – NI 43-101 Analyst Coverage Target Price**** Compliant 691,540 oz Au ready to expand at Ladner Large Exploration Upside** $2.00 5Moz+ upside based on historic drift assays and drilling + Strong pipeline of Greenfields P

  10. Slide 10: Share Structure and Capitalization

    Share Structure and Capitalization Strong Institutional Shareholders Capital Structure (November 6, 2023) Common Shares Outstanding 88,060,412 Warrants1, 2 11,504,733 Options + RSUs 3,085,667 Fully Diluted Shares Outstanding 102,650,812 Strategic Shareholders Market Capitalization ~$23 million (1) 5

  11. Slide 11: Bralorne New Mineral Resource (2023)

    Bralorne New Mineral Resource (2023)* Resource Expansion BP Gap Zone Open along strike Untested Untested Resource Conversion King Untested Untested Open at depth Close to surface resource - 70% new veins in historic ownership gap * Refer to Bralorne Inaugural Mineral Resource Estimate, slide 21 and

  12. Slide 12: Bralorne District-Scale Upside

    Bralorne District-Scale Upside ▪ 7 historical mines, 47 known mineral occurrences ▪ 33 km belt amalgamated by Talisker capturing mineralization associated with major suture zone ▪ Historic Resource 186Koz @ 9.1 g/t Au at Congress from surface to 200m * ▪ BRX first-pass drilling results up to 329 g/t

  13. Slide 13: Ladner Gold Project

    Ladner Gold Project ▪ 5 Historical Mines – 24 Known Gold Occurrences ▪ Compliant 691,540oz Inferred Gold Resource* ▪ Major Mines Permit (M-138) in place ▪ 144km2 contiguous land package – ~28kms x 5kms ▪ Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) ▪ Extensiv

  14. Slide 14: Golden Hornet Discovery

    Golden Hornet Discovery ▪ High-grade fault-controlled quartz-sulphide breccias and veins ▪ 8.88 g/t Au, 0.42% Cu and 14.99 g/t Ag over 5.1 metres within a broader zone of 2.59 g/t Au over 21.5 metres in GH-DDH-21-004 ▪ Hole GH-DDH-21-003 intercepted 11.58 g/t Au, 0.37% Cu and 11.1 g/t Ag over 1.05 m

  15. Slide 15: Corporate Head Office

    TSX : TSK OTCQX : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 3P5 Terry Harbort, President and CEO +1(416) 357-0227 terry.harbort@taliskerresources.com Matt Filgate, VP , Corporate and Strategic Development +1(778) 679-3579 matt.filgat

  16. Slide 16: Endnotes

    Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified p

  17. Slide 17: Endnotes – continued

    Endnotes – continued • High grade capping, supported by statistical analysis, was applied to composited data inside the high-grade quartz veins for Pioneer (1.4 m) at 100 g/t Au, Bralorne (1.4 m) at 100 g/t Au, Charlotte (1.0 m) at 31 g/t Au and King (1.2 m) at 110 g/t Au for the drill hole samples

  18. Slide 18: Corporate Leadership

    Corporate Leadership Management Terry Harbort – CEO, President, Matt Filgate –VP, Corporate and Leonardo de Souza – QP VP, Director Strategic Development Exploration and Resource Development ▪ PhD in Structural Geology and Tectonics. ▪ Matt is Regional Project Geologist for Talisker ▪ 35 years exper

  19. Slide 19: Corporate Leadership

    Corporate Leadership Non Executive Directors Morris Prychidny (1)(2) Christy Smith (2)(3) Eric Tremblay (2*)(3*) Chairman ▪ 25 years of proven expertise working ▪ BSc. in mining engineering and mineral with natural resource companies and ▪ Chartered Accountant with 35+ years indigenous communities p

  20. Slide 20: Bralorne Vein Array

    Excellent mineability due to Parallel vein sets provide high-grade continuity, vein Bralorne Vein Array potential for numerous adjacent mining fronts structural continuity, high dip angle Cross Section (415,450 mE) Plan View Many veins defined to near surface Excellent structural continuity down dip

  21. Slide 21: Bralorne Inaugural Mineral Resource Estimate (MRE)

    Bralorne Inaugural Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) King Indicated Long Hole > 2.65 111,300 8.61 30,800 Cut and Fill > 3.10 5,900 13.45 2,600 Inferred Long Hole > 2.65 1,598,400 5.76 296,200 Cut and Fill >