Iron Bear Resources Ltd · ASX:IBR

Iron Bear Resources — Cape Lambert Resources — Investor Presentation (May 2013)

22 slides from Iron Bear Resources's investor presentation, May 27, 2013

  1. Slide 1: ASX Announcement: Marampa Presentation

    Slide 1: ASX Announcement: Marampa Presentation

    ASX Announcement 27 May 2013 Cape Lambert is an Australian domiciled, mineral investment company. Its current investment portfolio is geographically diverse and consists of mineral assets and Marampa Presentation interests in mining and exploration companies. The Company continues to focus on Cape L

  2. Slide 2: Marampa Project

    Slide 2: Marampa Project

    FY Winarampa iron ore" Marampa Project

  3. Slide 3: Disclaimer

    Slide 3: Disclaimer

    Disclaimer This presentation contains summary information about Marampa Iron Ore Limited (Marampa) and its activities and it is not intended for general circulation or publication and it cannot be reproduced without the prior written consent of Marampa. This presentation contains forecasts and forwa

  4. Slide 4: Project Overview

    Slide 4: Project Overview

    Project Overview Location and - Sierra Leone, West Africa Tenure - Granted Exploration Licence (305km2) JORC Resource - 681Mt @ 28.2% Fe Product - High-grade hematite concentrate (>65% Fe) - Stage 1 - 2.5Mtpa Development - Stage 2 - 10Mtpa Strategy - Stage 3 - 15Mtpa - Environmental Licence Approved

  5. Slide 5: Pepel Infrastructure

    Slide 5: Pepel Infrastructure

    Pepel Infrastructure Pepel Railway Transhiping at Pepel Port 4

  6. Slide 6: Key Project Parameters

    Slide 6: Key Project Parameters

    Key Project Parameters Stage 1 Stage 2 Stage 3 Parameter Units Life of Mine 2.5 Mtpa 10 Mtpa 15 Mtpa Mine Life years 1.5 1 13.5 16 Mining Waste Mined Mt 6.9 16.6 805.5 829.0 Ore Mined Mt 15.0 26.6 513.7 555.3 Waste to Ore Ratio 0.5 0.6 1.6 1.5 Average Feed Head Grade % Fe 36.2 31.9 26.8 27.3 Process

  7. Slide 7: Key Project Parameters - Financials

    Slide 7: Key Project Parameters - Financials

    Key Project Parameters - Financials1 65% Fe Concentrate FOB Selling Price Description Unit US$95 /t US$100 /t US$105 /t Base Case – No Mine Gate Sales Total Revenue $M 19,213.3 20,224.5 21,235.8 Net Project Cashflow $M 3,741.7 4,475.8 5,210.0 2NPV $M 761.6 1,059.1 1,356.2 10% 2IRR % 17.7 20.4 22.9 M

  8. Slide 8: Geology & Mineral Resources

    Slide 8: Geology & Mineral Resources

    Geology & Mineral Resources Deposits – 7 known deposits – >20km strike length Drilling – Drilling completed to 31 July 2011 totals 51,982m:  24,290m of RC drilling in 199 holes  27,692m of diamond drilling in 122 holes – Drilling on 200m and selected 100m sections completed at Gafal, Matukia, Mafu

  9. Slide 9: Geology & Mineral Resources (cont.)

    Slide 9: Geology & Mineral Resources (cont.)

    Geology & Mineral Resources (cont.) Ore Types – Coarse-grained specular hematite in schist – Laterite 1-5m thick (“red cap” ore) and soft oxide 20-30m deep (“powder ore”) with grades of 27-50% Fe. – Hematite schist to >300m depth (“fresh ore”) with grades of 20-35% Fe. 8

  10. Slide 10: Geology & Mineral Resources (cont.)

    Slide 10: Geology & Mineral Resources (cont.)

    Geology & Mineral Resources (cont.) Ore Types Matukia: Laterite (“red-cap”) and Oxide Ore (“powder”) ores MPDD015 (0.0m -12.6m) 12.6m at 47.9% Fe, 23.5% SiO2, 4.4% Al2O3, 0.02% P, 0.0% S, 1.9% LOI Gafal West: Fresh Ore MPDD038 (391.1m -397.2m) 6.1m at 38.3% Fe, 31.7% SiO2, 2.1% Al2O3, 0.12% P, 0.0%

  11. Slide 11: Mining & Site Layout

    Slide 11: Mining & Site Layout

    Mining & Site Layout Process Plant – Centrally located and adjacent to existing railway. – Stage 1 - Commencing 2016* - low Opex oxide circuit at 2.5Mtpa. – Stage 2 - Increased output to 10Mtpa commencing 2018. Oxide and fresh ore circuits. – Stage 3 - Increased output to 15Mtpa commencing 2019. Con

  12. Slide 12: Geology & Mineral Resources: Metallurgical Testwork

    Slide 12: Geology & Mineral Resources: Metallurgical Testwork

    Geology & Mineral Resources Metallurgical Testwork – Based on bulk composite samples from many HQ and NQ diamond drill cores from Gafal West, Matukia and Rotret. Process Flowsheet – Simple and robust beneficiation process using proven wet high intensity magnetic separation (“WHIMS”) technology. Mara

  13. Slide 13: Primary Grind-Size

    Slide 13: Primary Grind-Size

    Primary Grind-Size Significantly Coarser than Magnetite Peers – Three stage crushing and screening followed by ball milling to a coarse primary grind size (P98 of 850µm) with 3 stage WHIMS magnetic separation and one intermediate grinding stage. Final concentrate P80 of ~180-200µm. – Coarse grind si

  14. Slide 14: Transport

    Slide 14: Transport

    Transport Rail – Connected to existing ship loading facility at Pepel Port via 73km Marampa operational heavy haulage narrow gauge railway (Marampa Infrastructure). Access – Rights to access 2Mwtpa of capacity on the Marampa Infrastructure (rail and port). – In addition, AML has 3 year option to pur

  15. Slide 15: Rail Proximity

    Slide 15: Rail Proximity

    Rail Proximity Comparative Advantage to Peers Marampa is ~2.5km from existing operational heavy haulage Lunsar–Pepel railway Estimated Rail Distances for Selected African Iron Ore Projects London Mining ‐ Marampa 40 Road haulage then barging Cape Lambert ‐ Marampa 73 Existing CFE has access rights t

  16. Slide 16: Shipping

    Slide 16: Shipping

    Shipping Stage 1 – Pepel Port - trans-shipment to Cape-size vessels in main channel of Freetown Harbour. Stage 2 – Tagrin Port – construction of a 15Mtpa trans- shipping port. Barge transhipping to Cape-size vessels off the coast. Pepel Port 15

  17. Slide 17: Local Company Infrastructure

    Slide 17: Local Company Infrastructure

    Local Company Infrastructure Management – Project management and exploration teams in place. – Administration office in Freetown. Project Facilities - Lunsar – Project office. – Accommodation and messing for Ex-pat staff. – Maintenance workshops and stores. – Sample preparation laboratory. – Drill c

  18. Slide 18: Social Development

    Slide 18: Social Development

    Social Development Community Projects – Several projects completed since February 2010 including, school renovations, new schools, medical clinics. National Employment – Local employment including >100 Sierra Leone national staff, plus casual work force. – Work force training. Empowerment Projects –

  19. Slide 19: Appendices

    Slide 19: Appendices

    Appendices A. Geology & Resource Summary B. Metallurgy Summary C. Sierra Leone Background 18

  20. Slide 20: Appendix A: Mineral Resources at the Marampa Project

    Slide 20: Appendix A: Mineral Resources at the Marampa Project

    Appendix A: Mineral Resources at the Marampa Project1 Tonnes Grade (%) Deposit JORC Category LOI Fe SiO2 Al2O3 P S (millions) % Indicated 77 30.1 40.6 4.9 0.140 0.004 3.1 Matukia Inferred 115 30.2 40.3 5.2 0.132 0.005 3.2 Total 192 30.2 40.4 5.1 0.135 0.005 3.2 Indicated 55 29.6 41.5 5.1 0.130 0.002

  21. Slide 21: Appendix B: Metallurgical Test Work Results

    Slide 21: Appendix B: Metallurgical Test Work Results

    Appendix B: Metallurgical Test Work Results Final Product Grades Head % Mass Iron Composite Recovery Recovery Grade (Fresh ore) % % % Fe Fe SiO2 Al2O3 P S Gafal South 28.4 64.5 4.4 1.4 0.04 0.003 31.8 80.7 Oxide Gafal South 26.7 65.8 2.7 1.0 0.01 0.003 30.4 84.3 Fresh (I) Gafal South 27.4 65.7 1.6 0

  22. Slide 22: Appendix C: Sierra Leone

    Slide 22: Appendix C: Sierra Leone

    Appendix C: Sierra Leone – Population 6.2 million – 134/178 countries in the 2010 – Total land area is 71,740km2 Transparency International – Tropical climate, rainy season from Corruption Perception Index May to November (3-4m /year) (up from 159/180 in 2007) – 2010 GDP US$4.8 billion growing – Est

Source: Internet Archive copy of capelam.com.au

More decks from Iron Bear Resources Ltd

All 37 Iron Bear Resources decks