Alacer Gold — Goldman Sachs Annual Global Metals & Mining/Steel Conference 2014
37 slides from Alacer Gold's conference presentation, Nov 20, 2014

Slide 1: Continuing to Deliver
Continuing to Deliver Goldman Sachs Annual Global Metals & Mining/Steel Conference Rod Antal, Chief Executive Officer TSX: ASR / ASX: AQG November 20, 2014

Slide 2: Cautionary Statements
Cautionary Statements FORWARD-LOOKING STATEMENTS Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking informat

Slide 3: Positioned to Capitalize on Multi-Mine Strategy
Positioned to Capitalize on Multi-Mine Strategy Attractive Organic Growth Opportunities 1 Additional oxides Low capital cost High margin Significant cash flow Leverage existing infrastructure 2 Sulfide project Significant and scalable low-cost, long-term production Become multi-mine 3

Slide 4: Company Snapshot
Company Snapshot Capital Structure Corporate / Asset Location Market Cap ~$600M Corporate Head Office Shares on Issue 290M Denver, Colorado Turkey Fully Diluted 294M Turnover ~1.7M shares/day Cash $320M at Sept 30, 2014 Istanbul Turkey Office Kabadüz Kurttepe Debt Nil Ankara Fol-ken Akoluk Guvemlï K

Slide 5: Delivery on Action Plan Since September 2013
Delivery on Action Plan Since September 2013 Initial results Çöpler Released of heap leach Confirmed Sold Confirmed achieves '13 positive pad study solid oxide Australian POX is best record Çöpler DFS reveals production Business processing annual Au for Sulfide potential profile to Unit solution for

Slide 6: Çöpler – Q3 2014 Performance
Çöpler – Q3 2014 Performance Çöpler continues to demonstrate operational excellence 90,000 1,000 80,000 900 800 70,000 700 $ O 60,000 / u 600 50,000 o n 500 u c 40,000 400 n e 1.70 1.84 c s 30,000 1.59 1.48 1.46 300 e 20,000 200 Çöpler Non-Controlling Interest (ozs) 10,000 100 Çöpler Attributable (o

Slide 7: Life-of-Mine Production Profile
Life-of-Mine Production Profile Çöpler Gold Production 2014 - 2034 300 250 270 258 Gold Production ('000 oz) 241 200 191 203 150 174 177 178 150 157 159 100 119 107 50 0 H2 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026-2034 Avg Oxide Gold Produced Sulfide Gold Produced Sulfide p

Slide 8: High-Value, Near-Term Oxide Opportunities
High-Value, Near-Term Oxide Opportunities Çöpler heap leach pad expansion Sulfide project DFS mine plan includes 4.2Mt at 1.2 gpt of heap leachable material currently classified as waste Study well progressed to expand existing heap leach pad capacity beyond current 50Mt Initial results indica

Slide 9: Positive DFS for Sulfide Project Delivered
Positive DFS for Sulfide Project Delivered DFS and updated Resources & Reserves further demonstrate: Robustness of sulfide project Significant increase to Çöpler’s Reserves Sulfide project generates attractive financial returns Brownfield project already significantly derisked Clear plan

Slide 10: Key Metrics for Sulfide Project
Key Metrics for Sulfide Project NI 43-101 NI 43-101 Report Report Metrics Metrics LOM Cash Flow $1.6B Total Cash Costs1 $540/oz Total Çöpler NPV at 5% $921M All-in Sustaining Costs1 $597/oz Pre-Production Capex $633M All-in Costs1 $810/oz Sustaining Capex $187M Payback from start of sulfide 1.7 year

Slide 11: Sulfide Project Fully On Track
Sulfide Project Fully On Track Project Schedule Build Project Team: July 2014 to March 2015 2014 2015 2016 2017 2018 Project Director position filled Recruit Owner’s Construction Team Çöpler Sulfides DFS Continue to build Operations Team through life of project Build Project Team Supplemental

Slide 12: Exceptional Exploration Potential
Exceptional Exploration Potential Leveraging our expertise, assets and strategic advantage in Turkey 18 years in Turkey gives Alacer early-mover advantage Tethyan Belt is historically under-explored and has excellent mineral potential TSX: ASR / ASX: AQG / 12

Slide 13: Strong Targets Identified in Highly Prospective Çöpler District
Strong Targets Identified in Highly Prospective Çöpler District Anagold Yakuplu (80%) 17m at 1.7g/t Au from 55m 6m at 4.7g/t Au from 55m 14m at 1.6g/t Au from 1m 17m at 2.7g/t Au from 73m Dursunbey Dursunbey Yakuplu (50%) 7m at 4.6g/t Au from surface 10m at 1.0g/t Au from 6m 14m at 1.1

Slide 14: Dursunbey Project
Dursunbey Project Promising early-stage results continue DRD-115 15.9m @ 2.2g/t Au, 59g/t Ag DRD-086 63.9m @ 1.0g/t Au, 27g/t Ag DRD-083 Recent discovery in western Turkey 48.0m @ 1.4 g/t Au, 99g/t Ag DRD-067 Over 26,500m & 250 holes drilled to date 10.8m @ 4.2g/t Au, 48g/t Ag Notable high grade

Slide 15: Dursunbey Project Cross Section
Dursunbey Project Cross Section L450 NE – Looking NE DRRC-002 28m @ 0.5g/t Au, 0.6% Cu, 1.9% Zn DRD-043 2.6m @ 3g/t Au, 41g/t Ag DRD-081 DRD-080 DRD-060 5m @ 1.2g/t Au, 20.1m @ 1.4g/t Au, 20.4m @ 0.5g/t Au, 48g/t Ag, 1.4% Cu, 49g/t Ag, 0.7% Cu, 0.7% Cu, 1.5% Zn 0.6% Pb, 3.9% Zn 0.7% Pb, 3.5% Zn DRD-

Slide 16: Key Investment Highlights
Key Investment Highlights World-class mine with significant, low-cost production and excellent infrastructure Heap leach operation consistently delivering substantial cash flow Significant increase in heap leach pad capacity provides near-team opportunities Sulfide project NI 43-101 estimates Çöpler

Slide 17: For further information, please contact
For further information, please contact: Lisa Maestas +1-303-292-1299 TSX: ASR / ASX: AQG / 17

Slide 18: Appendix
ALACER GOLD

Slide 19: Company Structure
Company Structure Corporate Overview 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV (Lidya Mining) (Lidya Mining) (Lidya Mining) (Lidya Mining) Çöpler Gold Mine Certain Turkey Turkey Çöpler District Licenses Regional Exploration Regional Exploration 5 Projects 11 Projects 3 Pr

Slide 20: Substantial Capital Invested to Optimize Operations Over Past Three Years
Substantial Capital Invested to Optimize Operations Over Past Three Years Over $60 million invested in optimization and process improvement projects Clay‐Handling Bypass Circuit $13M spent HL Pad Phase 3 Expansion $7M spent Designed to improve processing Increased total leach pad capacity

Slide 21: Sulfide Project Demonstrates Robust Economics
Sulfide Project Demonstrates Robust Economics LOM Key Assumptions1 (100%) Free Cash Flow1 (millions) (100%) Oxide - HL Sulfide - POX Total Ore Mined Kt 23,249 28,868 LOM $1.6B Au Grade g/t 1.31 2.67 Free Au Recovery % 69.2% 93.9% Cash Flow LOM Modelled Mine Life years 6 18 $227 $227 Operating $197 $

Slide 22: Sulfide Project to Deliver Significant Growth
Sulfide Project to Deliver Significant Growth Average annual gold production of over 150 koz at Total Cash Costs1 of $540/oz Tonnes Processed and Grade (100%) Production and Total Cash Costs1 (C2) (100%) H2 6.4 6.4 H2 2014 5.7 2014 1.8 1.4 1.2 1.3 1.7 1.3 1.0 3.3 3.9 269 257 $540 0.9 0.6 241 2014E 2

Slide 23: Base Case Financial Metrics
Base Case Financial Metrics Financial Metrics Base Case DFS Case (as of July 1, 2014) (Oxide (Heap Leach + Incremental Only) POX) B–A A B LOM cash flow (millions) $323 $1,600 $1,250 NPV at 5% (millions) $299 $921 $622 IRR % N/A N/A 20.5 Payback from start of sulfide Years N/A 1.7 gold production G

Slide 24: Sulfide Project - Sensitivities
Sulfide Project - Sensitivities Gold Price Gold Price Base Case Gold Price Gold Price (as of July 1, 2014) $1,100/oz $1,200/oz $1,300/oz $1,400/oz $1,500/oz After-tax Total cash flows $ millions $956 $1,265 $1,600 $1,862 $2,114 Total NPV at 5% $ millions $516 $719 $921 $1,117 $1,293 Payback from sta

Slide 25: Sulfide Project Capital Cost & Risk Management
Sulfide Project Capital Cost & Risk Management Capital Cost Summary1 (millions) • Project Management – Recruitment of the owner’s team Crushing and Grinding Equipment $70 – Leverage local knowledge and experience Autoclaves and Ancillary Equipment $170 – Set clear and achievable milestones Metal Rec

Slide 26: Sulfide Project Capital Schedules
Sulfide Project Capital Schedules Pre-Production Capital Expenditure $ Millions Total 2014 2015 2016 2017 2018 Plant 571.1 15.1 82.2 236.7 203.5 33.7 Tailing Facility 49.3 0.0 10.4 25.9 13.0 0.0 Social and Permitting 12.3 0.8 1.2 4.5 5.7 0.0 Total Pre-Production Capital 632.8 15.9 93.8 267.2 222.2 3

Slide 27: Sulfide Ore Mined by Year
Sulfide Ore Mined by Year Sulfide Ore Total 20141 20151 20161 20171 2018 2019 2020 2021 2022 2023 2024 2025 2026 Low-Grade (1.4-2.3 g/t) Mined (Mt) 15.7 0.9 0.9 1.0 0.8 1.3 2.4 1.6 0.8 0.6 1.6 1.4 2.4 0.0* Low-Grade Gold Grade (g/t) 1.86 1.82 1.85 1.88 1.84 1.85 1.89 1.88 1.88 1.87 1.85 1.80 1.88 1.

Slide 28: Sulfide Ore Processed by Year
Sulfide Ore Processed by Year Çöpler Gold Mine Total ‘17 ‘18 ‘19 ‘20 ‘21 ‘22 ‘23 ‘24 ‘25 ‘26 ‘27 ‘28 ‘29 ‘30 ‘31 ‘32 ‘33 ‘34 Sulfide Ore Processed (Mt) 31.7 0.0* 1.5 1.8 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.6 Sulfide Au Grade Processed (g/t) 2.7 5.2 4.9 4.2 4.2 3.5 3.0 3.0 2.7 3

Slide 29: Sulfide Project Operating Costs
Sulfide Project Operating Costs LOM Cash Operating Costs1 Summary Unit Cost Mining Per tonne mined $1.85 Rehandle Per tonne rehandled $1.16 Heap Leach Processing Per tonne heap leach $9.79 processed POX Processing Per tonne POX processed $34.55 Site Support and Offsite Per tonne processed $3.54 Cash

Slide 30: Sulfide Project Operating Costs
Sulfide Project Operating Costs LOM Cash Costs Summary POX Processing Costs by Component LOM Fuel Oil Mobile Equipment Electric Power ($/t ore $109/oz $15/oz Fuel ($/oz) 26% 3% $7/oz processed) 2% Mining Contract / Support $7.18 $121.85 Labour $53/oz 12% Rehandle G&A Supplies $14/oz 3% Wear Material

Slide 31: Overview of Sulfide Processing Facility
Overview of Sulfide Processing Facility Proven technology Proven technology used for 38% of global gold production Autoclave circuit comprised of seven individual pressure vessels Temperature of 220o C (430o F), Pressure of 2,900 kPag (420 psi) Sulfur grade averages 4.2%, providing the heat

Slide 32: Sulfide Project Site Layout
Sulfide Project Site Layout Designed with room for a staged approach EXISTING AGGLOMERATOR EXISTING CRUSHING TSX: ASR / ASX: AQG / 32

Slide 33: Resource Reconciliation Study To Date
Resource Reconciliation Study To Date • Resource reconciliation work has significantly upgraded the quality of the reserve • Changed modelling method from Ordinary Kriging to Probability Assigned Constrained Kriging (PACK), utilized because it allows better calibration of the resource model to histo

Slide 34: Çöpler Reserves and Resources
Çöpler Reserves = 3.8Moz Çöpler M+I Resources = 7.8Moz Çöpler Resource + Mined Ounces (100%) 14 12 10 Million ounces of gold 8 Inferred 6 Measured + Indicated Contained Ounces Mined 4 2 - Dec 11 Dec 13 June 12 June 13 Feb 10 Çöpler reserves and resources have continued to increase TSX: ASR / ASX: AQ

Slide 35: New Çöpler Mineral Resource
New Çöpler Mineral Resource Updated Mineral Resources for the Ҫӧpler Deposit (As of December 31, 2013) Material Resource Category Tonnes Contained Gold Cut-off Grade (g/t) Au (g/t) Ag (g/t) Cu (%) Type Material (x1000) Au Ounces Measured - - - - - Indicated 69,512 1.08 2.78 0.15 2,420,600 Variable O

Slide 36: New Çöpler Mineral Reserve
New Çöpler Mineral Reserve Updated Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2013) Tonnes Au Ag Cu Contained Au Recoverable Au Reserve Category Material (x1000) (g/t) (g/t) (%) Ounces Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 26,207 1.32 2.88 0.13 1,114,700

Slide 37: Life-of-Mine Production Profile
Life-of-Mine Production Profile 3.2 million ounces produced July 2014 2018 2023 to Dec 2017 to 2022 to 2034 Total Heap Leach First 5 years Remainder of (100%) Only of POX LoM Mining Oxide Ore to Heap Leach Pad Mt 21.8 1.5 0 23.2 Sulfide Ore Mt 6.31 13.7 8.9 28.9 Waste Mt 85.8 51.4 24.1 161.2 Total T
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017