US Oil Sands — CAPP Investment Symposium 2012
24 slides from US Oil Sands's conference presentation, December 2012

Slide 1: CAPP Investment Symposium
CAPP Investment Symposium December 2012 TSXV: USO

Slide 2: Forward Looking Statements
Forward Looking Statements This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward-looking statements in this presentation include, but are not limited to, sta

Slide 3: US Oil Sands Inc.
US Oil Sands Inc. Large Innovation Resources & Breakthrough Lands Capital Environmental Efficiency Leadership TSXV: USO 3

Slide 4: US Oil Sands Inc.
US Oil Sands Inc. • Focused on developing its Utah bitumen resources – Largest commercial oil sand land position in U.S. (32,005 acres) • Expects to develop 50,000 BPD(1) over next 10 years – Phase 1 construction in 2013 – Modular plants, sequential development, low capital cost – Worldwide developm

Slide 5: Corporate Snapshot
Corporate Snapshot • Calgary based oil sands mining company • TSX Venture listed; TSX-V: USO • Current market capitalization - CAD$58 million (1) • CAD$8.2 million in treasury – no debt (2) • Independent assessment – 190 million barrel discovered resource(3) • Proven proprietary extraction process •

Slide 6: Capitalization – Post $11MM Private Placement
Capitalization – Post $11MM Private Placement • Directors and Management aligned ─ 312,831,064 common shares, D&O 10.3% w/no founders or low ACB shares ─ 421,230,799 fully diluted, D&O 14.0% Securities Common Shares Stock Options Warrants Fully Diluted Issued and Outstanding # 312,831,064 24,675,000

Slide 7: Why Oil Sands in Utah?
Why Oil Sands in Utah? • Large known resources – Estimated at over 30 billion bbls in place (>50% of oil sands in the US) – Total US conventional oil proved reserves are only 21 billion bbls (1) • Available land for leasing from development-oriented State • Attractive royalties, good business enviro

Slide 8: Experienced Leadership
Experienced Leadership Management Team • Experienced leader with over 30 years in oil, gas and oil sand development and operations, most recently as Senior VP Operations, Refining and Marketing with Cameron Todd Connacher Oil and Gas (5 years) Chief Executive Officer • 13 years as executive in US, C

Slide 9: Experienced Leadership
Experienced Leadership Board of Directors Verne Johnson • Chairman of Petromanas Energy Chairman • Director of Gran Tierra Energy and Statoil Canada • President of RFM Capital Corporation and Bluesky Equities Ltd , private investment Douglas Hunter companies Director • Past director of Wellco Energy

Slide 10: Utah’s Prolific Uinta Basin
Utah’s Prolific Uinta Basin Utah’s Production Facts • 3,600 producing oil wells • 72,000 bbl/d oil • 6,100 producing gas wells • 1.4 bcf/d gas • 306,000 boe/d 10

Slide 11: Extensive Land and Resource Base
Extensive Land and Resource Base • PR Spring Mining Project Area: ─ Multiple bitumen beds with combined thickness up to 100 feet ─ Average 20 feet overburden, 5% - 14% ore grade by wt. ─ Independent resource assessment by Sproule Associates shows 190 million barrels discovered resource (1) • Explora

Slide 12: US Oil Sands Extraction Process
US Oil Sands Extraction Process • Adaptation of existing Canadian processes – Addition of proprietary solvent process improves recovery – Process uses low mechanical energy, reduces clay suspensions – No tailings ponds – Major reduction in capital intensity • USO process uses renewable biodegradable

Slide 13: Process is Proven and Scalable
Process is Proven and Scalable • Extensive pilot testing of extraction process – Four prototypes ranging from 24 to 500 bbl/d – Oil sands tested from various locations worldwide – Tested both in the field and in the lab – Independent engineering and supplier review • Commercial units are scalable: 2

Slide 14: Project is Shovel Ready
Project is Shovel Ready • Project approved by Utah Division of Oil, Gas and Mining • Conventional mining approach with standard equipment • Clean sand produced and stacked in mined out areas immediately • Rapid reclamation • Close to market • Secure domestic oil reserves for America 14

Slide 15: Production Growth in Phased Development
Production Growth in Phased Development • Rapid build-up in phases ─ Modular construction allows flexible development of various capacities ─ Can be stand-alone, sequential or paired together ─ Units are portable and re-deployable ─ Low capital threshold, payout < 2 years ─ Capital cost per base mod

Slide 16: Markets, Transportation and Netbacks
Markets, Transportation and Netbacks • Primary Market – Salt Lake City Refineries (via truck) – 157,000 bpd capacity • Secondary Market – West Coast Refineries (via rail) – 2.5 million bpd capacity • Transportation – truck and rail in insulated asphalt tankers Netbacks $/bbl $/bbl West Coast WTI Cru

Slide 17: Appendices
Appendices a» U.S. OIL SANDS

Slide 18: Land Holdings are Extensive
Land Holdings are Extensive 18

Slide 19: Planned 2013 Development Area
Planned 2013 Development Area 19

Slide 20: An Adaptation for Oil Wet Reservoir Rock
An Adaptation for Oil Wet Reservoir Rock • Athabasca oil sands of Canada are “water wet” – Water sticks to the sand grains, bitumen and clay are in between – Clark process uses hot water to remove the oil – Hard to break oil-water-clay emulsions created in traditional extraction process, inevitably

Slide 21: Project Implementation Schedule
Project Implementation Schedule 2011 2012 2013 2014 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Shop Demo Unit Testing Program Permit PR Spring Mine Operation Design Commercial Unit (FLSmidth/ADC/LCI) Coring (2011 resource estimate + 2012 infill ) & Detailed Mine Model Order Long Delivery Equipm

Slide 22: US Oil Sands Extraction Process
US Oil Sands Extraction Process 2 Bitumen/Fines/Water Feed Hopper 1 Separation Towers Ore De-lumper 3 4 Stockpile Rotating Drum Mixer Make-up Chemical Hot Water Extraction Clean Sand & Water Chemical Bitumen Bitumen 6 Horizontal Belt Filter Polishing Clean Fines Unit & Water Distillation Process Ste

Slide 23: Mining Equipment – Wirtgen Surface Miner
Mining Equipment – Wirtgen Surface Miner Self-propelled/self-loading mining & ore conditioning machine 23

Slide 24: TSXV: USO
Cameron M. Todd Chief Executive Officer cameron.todd@usoilsandsinc.com D. Glen Snarr President & Chief Financial Officer glen.snarr@usoilsandsinc.com (403) 233-9366 www.usoilsandsinc.com TSXV: USO
Source: Internet Archive copy of usoilsandsinc.com
More decks from US Oil Sands Inc.
Investor Presentation (September 2016)33 slides · September 2016
Investor Presentation (December 2015)35 slides · December 2015
Investor Presentation (July 2015)35 slides · July 2015
Investor Presentation (September 2014)30 slides · September 2014
Investor Presentation (September 2013)26 slides · September 2013
Shareholder Meeting (May 2013)22 slides · May 15, 2013