US Oil Sands Inc.

US Oil Sands — Investor Presentation (September 2014)

30 slides from US Oil Sands's investor presentation, September 2014

  1. Slide 1: Corporate Presentation

    Slide 1: Corporate Presentation

    Corporate Presentation September 2014 TSXV: USO

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward-looking statements in this presentation include, but are not limited to, sta

  3. Slide 3: Overview

    Slide 3: Overview

    Overview LARGE RESOURCES & LAND INNOVATION BREAKTHROUGH ENVIRONMENTAL LEADERSHIP CAPITAL EFFICIENCY (capital / environment / oil recovery) 3

  4. Slide 4: Company Snapshot

    Slide 4: Company Snapshot

    Company Snapshot • Proprietary extraction process Corporate Profile – Small environmental footprint, no tailings ponds • Calgary-based oil sands mining – ~$20,000/bpd capital intensity, rapid payout company • TSX Venture listed: “USO” • Executing on 2,000 bpd project in Utah • Market cap: C$102MM(1)

  5. Slide 5: Extensive Land & Resource Base

    Slide 5: Extensive Land & Resource Base

    Extensive Land & Resource Base • Largest oil sands land base in the U.S. • PR Spring Project Area: ─ 100% working interest in 5,930 acres ─ Sproule assessment of 184 MMbbls Discovered Resource(1) • Significant exploration lands ─ 100% W.I. in 26,075 acres (1) Sproule Unconventional Limited report ef

  6. Slide 6: Breakthrough Extraction Process

    Slide 6: Breakthrough Extraction Process

    Breakthrough Extraction Process Our process uses a biodegradable solvent extracted from citrus fruits US Oil Sands’ patented extraction process is one of the most important breakthroughs in mineable oil sands extraction techniques in more than 45 years. 90-96% Bitumen recovery Process facts: • Uses

  7. Slide 7: Game-Changing Benefits

    Slide 7: Game-Changing Benefits

    Game-Changing Benefits Economic Benefits Environmental Benefits • Low threshold, payout in 2 years • Smallest footprint of any oil sands mining Low Up • Low cost; process eliminates pond water process Smallest Front handling, bitumen froth treatment, • Eliminates need for tailings ponds, Footprint C

  8. Slide 8: Superior Capital Efficiency

    Slide 8: Superior Capital Efficiency

    Superior Capital Efficiency • Lowest capital intensity of any recent mining oil sands project – even at small scale Non-Integrated Oil Sands Mining Projects Capital Efficiency ($/bbl/d) $140,000 $120,000 Athabasca average $92,553/bbl/d $100,000 $80,000 $60,000 $40,000 $20,000 $0 US Oil Sands(1) US O

  9. Slide 9: Concurrent Reclamation

    Slide 9: Concurrent Reclamation

    Concurrent Reclamation Year 1 – Mine Opening • Simultaneous mining and reclamation means land can be returned to its natural state in 4 – 6 years Year 2 – Backfill – A first in oil sands mining Commences – USO’s surface footprint is estimated to be 90–95% smaller than traditional projects (on a per

  10. Slide 10: PR Spring Project

    Slide 10: PR Spring Project

    PR Spring Project • Fully approved surface mine and Attractive Oil Sands Development development project in Utah – Uinta Basin in Northeast Utah • Large known resource – Initial 2,000 bpd phase – Estimated up to 30 Bbbls in place – Off-the-shelf process equipment • Development-oriented state – Conve

  11. Slide 11: Commercial Demonstration Objectives

    Slide 11: Commercial Demonstration Objectives

    Commercial Demonstration Objectives • Build 2,000 bpd demonstration project to prove the commerciality of the process Primary Success Measures Secondary Success Measures Prove it’s Game-changing w/no Show-stoppers Optimize Performance - No tailings pond - On time - High oil recovery - On budget - Hi

  12. Slide 12: Proven, Permitted, Financed & Under Development

    Slide 12: Proven, Permitted, Financed & Under Development

    Proven, Permitted, Financed & Under Development • Extensive pilot testing of extraction process – Four prototypes ranging from 24 – 500 bpd, various ores tested • Phase I approved by Utah Division of Oil, Gas and Mining – Only commercial bitumen extraction project permitted in the U.S. • Phase I fun

  13. Slide 13: Project Implementation Schedule

    Slide 13: Project Implementation Schedule

    Project Implementation Schedule PR Spring Project - Phase I 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Detailed Engineering Final Mine Plan Infrastructure Site Prep/Roads Equipment Procurement Water Tie-in Overburden Removal, Ore stockpiling and On-Going Mine Operations Plant Fabrication Mob

  14. Slide 14: Phased Production Growth

    Slide 14: Phased Production Growth

    Phased Production Growth • Rapid build-up in phases • Modular construction allows flexible development of various capacities ─ Can be stand-alone, sequential or scaled-up • Low capital threshold, ~$20,000/bpd of capacity 2,000 bpd Commercial 2,000 Demo Unit bpd Commercial 10,000 bpd Production Units

  15. Slide 15: Markets

    Slide 15: Markets

    Markets • Crude quality – 10-12° API, sweet, heavy crude Netbacks Coastal – Highly suitable for heavy oil Crude Oil Price $105 / bbl(1) refineries • Market options provide higher Heavy Differential $10 netbacks Transportation $13 – 40 refineries in the region with over 3 million bpd capacity Operati

  16. Slide 16: Robust Economics, Stable Cash Flow

    Slide 16: Robust Economics, Stable Cash Flow

    Robust Economics, Stable Cash Flow • Significant, recurring cash flow Before Tax Cash Flow 1,400 1,200 1,000 800 ($MM) 600 Payout of Effective payout of second project 400 first project 200 - (200) 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Annual Cash Flow Cumulative Cash Flow Notes: PR

  17. Slide 17: The Opportunity

    Slide 17: The Opportunity

    The Opportunity Example of stranded bitumen resources in Athabasca • Hundreds of millions of barrels of mineable bitumen stranded in large pools too small for mega projects – Canada, U.S., global • Well suited for modular 10,000 bpd developments • The world is demanding responsible development • USO

  18. Slide 18: Experienced Leadership

    Slide 18: Experienced Leadership

    Experienced Leadership Management Team • Experienced leader with over 30 years in oil, gas and oil sands development and operations, Cameron Todd most recently as Senior VP Operations, Refining and Marketing with Connacher Oil and Gas CEO • 13 years as an executive in U.S., Canadian and internationa

  19. Slide 19: Strong Governance

    Slide 19: Strong Governance

    Strong Governance Board of Directors Verne Johnson, Chairman Mark Brown • Chairman of Petromanas Energy Inc. and • Co-founder, Seven Generations Energy Ltd. director of Gran Tierra Energy Inc. • Previously Vice President, EPC of North • Former CEO of ELAN Energy Inc. American Oil Sands Corporation R

  20. Slide 20: Capitalization

    Slide 20: Capitalization

    Capitalization Ticker USO Exchange TSX Venture Basic Shares Outstanding 853.1 million Options 45.7 million (average exercise price of $0.20) Warrants Nil Fully Diluted 898.8 million Current Share Price(1) $0.12 52 week high (Sept. 23, 2013) $0.24 52 week low (July 11, 2013) $0.09 Basic Market Capita

  21. Slide 21: Conclusion

    Slide 21: Conclusion

    Conclusion • USO’s next generation solvent technology represents a paradigm shift in surface mineable oil sands economics and environmental impact – Best-in-class capital efficiency, environmental footprint, oil recovery • Commercialization of the process provides significant opportunities for resou

  22. Slide 22: Appendix

    Slide 22: Appendix

    Appendix a) U.S. OIL SANDS*

  23. Slide 23: Well-defined Resources

    Slide 23: Well-defined Resources

    Well-defined Resources • 184 core holes provide strong well control ─ Up to 2.5-acre spacing, >4,400 assays • Multiple beds; combined thickness up to 100’ • Average 25’ overburden, 5–15 wt% ore grade, average 10 wt% in planned pits • Significant resource beyond Phase I PR Spring Development Lease –

  24. Slide 24: Planned Development Area

    Slide 24: Planned Development Area

    © OD — < + a YO of for O° O > YO e Oo O G e ic Oo U.S. OIL SANDS’ 24

  25. Slide 25: Plant Site Layout

    Slide 25: Plant Site Layout

    Plant Site Layout ry U.S. OIL SANDS’

  26. Slide 26: Adaptation for Oil Wet Reservoirs Rock

    Slide 26: Adaptation for Oil Wet Reservoirs Rock

    Adaptation for Oil Wet Reservoirs Rock • Athabasca oil sands are “water wet” Water Wet Oil Sands – Sand grains enveloped by water, then by oil – Clark process uses hot water to remove the oil Sand but hard to break oil-water-clay suspensions / Water emulsions created, results in tailings ponds Bitum

  27. Slide 27: Extraction Process Flow Chart

    Slide 27: Extraction Process Flow Chart

    Extraction Process Flow Chart Separation Towers Bitumen/Fines/Water Feed Hopper Milled Ore from Mine Ore De-lumper Stockpile Rotating Drum Mixer Make-up Chemical Hot Water Extraction Chemical Bitumen Bitumen Clean Solids Polishing Clean Fines De-watering Unit Unit & Water Distillation Process Steam

  28. Slide 28: Pilot Facilities

    Slide 28: Pilot Facilities

    Pilot Facilities • 24 bpd shop demonstration unit in Grande Prairie, Alberta d-Limonene Rotating Drum Tricanter and Shale Shaker Storage Tank Mixer Control Panel Feed Hopper and Separation Water and Dilute De-lumper Vessels Bitumen Tanks USO continues to lead in technology development and applicatio

  29. Slide 29: Shop Demonstration Unit Run

    Slide 29: Shop Demonstration Unit Run

    Shop Demonstration Unit Run 29

  30. Slide 30: Cameron M. Todd, Chief Executive Officer

    Slide 30: Cameron M. Todd, Chief Executive Officer

    Cameron M. Todd Chief Executive Officer cameron.todd@usoilsandsinc.com D. Glen Snarr President & Chief Financial Officer glen.snarr@usoilsandsinc.com (403) 233-9366 www.usoilsandsinc.com

Source: Internet Archive copy of usoilsandsinc.com

More decks from US Oil Sands Inc.