US Oil Sands — Investor Presentation (September 2014)
30 slides from US Oil Sands's investor presentation, September 2014

Slide 1: Corporate Presentation
Corporate Presentation September 2014 TSXV: USO

Slide 2: Forward Looking Statements
Forward Looking Statements This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward-looking statements in this presentation include, but are not limited to, sta

Slide 3: Overview
Overview LARGE RESOURCES & LAND INNOVATION BREAKTHROUGH ENVIRONMENTAL LEADERSHIP CAPITAL EFFICIENCY (capital / environment / oil recovery) 3

Slide 4: Company Snapshot
Company Snapshot • Proprietary extraction process Corporate Profile – Small environmental footprint, no tailings ponds • Calgary-based oil sands mining – ~$20,000/bpd capital intensity, rapid payout company • TSX Venture listed: “USO” • Executing on 2,000 bpd project in Utah • Market cap: C$102MM(1)

Slide 5: Extensive Land & Resource Base
Extensive Land & Resource Base • Largest oil sands land base in the U.S. • PR Spring Project Area: ─ 100% working interest in 5,930 acres ─ Sproule assessment of 184 MMbbls Discovered Resource(1) • Significant exploration lands ─ 100% W.I. in 26,075 acres (1) Sproule Unconventional Limited report ef

Slide 6: Breakthrough Extraction Process
Breakthrough Extraction Process Our process uses a biodegradable solvent extracted from citrus fruits US Oil Sands’ patented extraction process is one of the most important breakthroughs in mineable oil sands extraction techniques in more than 45 years. 90-96% Bitumen recovery Process facts: • Uses

Slide 7: Game-Changing Benefits
Game-Changing Benefits Economic Benefits Environmental Benefits • Low threshold, payout in 2 years • Smallest footprint of any oil sands mining Low Up • Low cost; process eliminates pond water process Smallest Front handling, bitumen froth treatment, • Eliminates need for tailings ponds, Footprint C

Slide 8: Superior Capital Efficiency
Superior Capital Efficiency • Lowest capital intensity of any recent mining oil sands project – even at small scale Non-Integrated Oil Sands Mining Projects Capital Efficiency ($/bbl/d) $140,000 $120,000 Athabasca average $92,553/bbl/d $100,000 $80,000 $60,000 $40,000 $20,000 $0 US Oil Sands(1) US O

Slide 9: Concurrent Reclamation
Concurrent Reclamation Year 1 – Mine Opening • Simultaneous mining and reclamation means land can be returned to its natural state in 4 – 6 years Year 2 – Backfill – A first in oil sands mining Commences – USO’s surface footprint is estimated to be 90–95% smaller than traditional projects (on a per

Slide 10: PR Spring Project
PR Spring Project • Fully approved surface mine and Attractive Oil Sands Development development project in Utah – Uinta Basin in Northeast Utah • Large known resource – Initial 2,000 bpd phase – Estimated up to 30 Bbbls in place – Off-the-shelf process equipment • Development-oriented state – Conve

Slide 11: Commercial Demonstration Objectives
Commercial Demonstration Objectives • Build 2,000 bpd demonstration project to prove the commerciality of the process Primary Success Measures Secondary Success Measures Prove it’s Game-changing w/no Show-stoppers Optimize Performance - No tailings pond - On time - High oil recovery - On budget - Hi

Slide 12: Proven, Permitted, Financed & Under Development
Proven, Permitted, Financed & Under Development • Extensive pilot testing of extraction process – Four prototypes ranging from 24 – 500 bpd, various ores tested • Phase I approved by Utah Division of Oil, Gas and Mining – Only commercial bitumen extraction project permitted in the U.S. • Phase I fun

Slide 13: Project Implementation Schedule
Project Implementation Schedule PR Spring Project - Phase I 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Detailed Engineering Final Mine Plan Infrastructure Site Prep/Roads Equipment Procurement Water Tie-in Overburden Removal, Ore stockpiling and On-Going Mine Operations Plant Fabrication Mob

Slide 14: Phased Production Growth
Phased Production Growth • Rapid build-up in phases • Modular construction allows flexible development of various capacities ─ Can be stand-alone, sequential or scaled-up • Low capital threshold, ~$20,000/bpd of capacity 2,000 bpd Commercial 2,000 Demo Unit bpd Commercial 10,000 bpd Production Units

Slide 15: Markets
Markets • Crude quality – 10-12° API, sweet, heavy crude Netbacks Coastal – Highly suitable for heavy oil Crude Oil Price $105 / bbl(1) refineries • Market options provide higher Heavy Differential $10 netbacks Transportation $13 – 40 refineries in the region with over 3 million bpd capacity Operati

Slide 16: Robust Economics, Stable Cash Flow
Robust Economics, Stable Cash Flow • Significant, recurring cash flow Before Tax Cash Flow 1,400 1,200 1,000 800 ($MM) 600 Payout of Effective payout of second project 400 first project 200 - (200) 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Annual Cash Flow Cumulative Cash Flow Notes: PR

Slide 17: The Opportunity
The Opportunity Example of stranded bitumen resources in Athabasca • Hundreds of millions of barrels of mineable bitumen stranded in large pools too small for mega projects – Canada, U.S., global • Well suited for modular 10,000 bpd developments • The world is demanding responsible development • USO

Slide 18: Experienced Leadership
Experienced Leadership Management Team • Experienced leader with over 30 years in oil, gas and oil sands development and operations, Cameron Todd most recently as Senior VP Operations, Refining and Marketing with Connacher Oil and Gas CEO • 13 years as an executive in U.S., Canadian and internationa

Slide 19: Strong Governance
Strong Governance Board of Directors Verne Johnson, Chairman Mark Brown • Chairman of Petromanas Energy Inc. and • Co-founder, Seven Generations Energy Ltd. director of Gran Tierra Energy Inc. • Previously Vice President, EPC of North • Former CEO of ELAN Energy Inc. American Oil Sands Corporation R

Slide 20: Capitalization
Capitalization Ticker USO Exchange TSX Venture Basic Shares Outstanding 853.1 million Options 45.7 million (average exercise price of $0.20) Warrants Nil Fully Diluted 898.8 million Current Share Price(1) $0.12 52 week high (Sept. 23, 2013) $0.24 52 week low (July 11, 2013) $0.09 Basic Market Capita

Slide 21: Conclusion
Conclusion • USO’s next generation solvent technology represents a paradigm shift in surface mineable oil sands economics and environmental impact – Best-in-class capital efficiency, environmental footprint, oil recovery • Commercialization of the process provides significant opportunities for resou

Slide 22: Appendix
Appendix a) U.S. OIL SANDS*

Slide 23: Well-defined Resources
Well-defined Resources • 184 core holes provide strong well control ─ Up to 2.5-acre spacing, >4,400 assays • Multiple beds; combined thickness up to 100’ • Average 25’ overburden, 5–15 wt% ore grade, average 10 wt% in planned pits • Significant resource beyond Phase I PR Spring Development Lease –

Slide 24: Planned Development Area
© OD — < + a YO of for O° O > YO e Oo O G e ic Oo U.S. OIL SANDS’ 24

Slide 25: Plant Site Layout
Plant Site Layout ry U.S. OIL SANDS’

Slide 26: Adaptation for Oil Wet Reservoirs Rock
Adaptation for Oil Wet Reservoirs Rock • Athabasca oil sands are “water wet” Water Wet Oil Sands – Sand grains enveloped by water, then by oil – Clark process uses hot water to remove the oil Sand but hard to break oil-water-clay suspensions / Water emulsions created, results in tailings ponds Bitum

Slide 27: Extraction Process Flow Chart
Extraction Process Flow Chart Separation Towers Bitumen/Fines/Water Feed Hopper Milled Ore from Mine Ore De-lumper Stockpile Rotating Drum Mixer Make-up Chemical Hot Water Extraction Chemical Bitumen Bitumen Clean Solids Polishing Clean Fines De-watering Unit Unit & Water Distillation Process Steam

Slide 28: Pilot Facilities
Pilot Facilities • 24 bpd shop demonstration unit in Grande Prairie, Alberta d-Limonene Rotating Drum Tricanter and Shale Shaker Storage Tank Mixer Control Panel Feed Hopper and Separation Water and Dilute De-lumper Vessels Bitumen Tanks USO continues to lead in technology development and applicatio

Slide 29: Shop Demonstration Unit Run
Shop Demonstration Unit Run 29

Slide 30: Cameron M. Todd, Chief Executive Officer
Cameron M. Todd Chief Executive Officer cameron.todd@usoilsandsinc.com D. Glen Snarr President & Chief Financial Officer glen.snarr@usoilsandsinc.com (403) 233-9366 www.usoilsandsinc.com
Source: Internet Archive copy of usoilsandsinc.com
More decks from US Oil Sands Inc.
Investor Presentation (September 2016)33 slides · September 2016
Investor Presentation (December 2015)35 slides · December 2015
Investor Presentation (July 2015)35 slides · July 2015
Investor Presentation (September 2013)26 slides · September 2013
Shareholder Meeting (May 2013)22 slides · May 15, 2013
Investor Presentation (May 2013)25 slides · May 2013