US Oil Sands — Investor Presentation (December 2015)
35 slides from US Oil Sands's investor presentation, December 2015

Slide 1: Corporate Presentation December 2015
December 2015 TSX-V: USO www.usoilsandsinc.com

Slide 2: Forward-looking statements
This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward- looking statements in this presentation include, but are not limited to, statements with respect to: b

Slide 3: Innovation breakthrough, environmental leadership, capital efficiency, large resources
INNOVATION BREAKTHROUGH ENVIRONMENTAL LEADERSHIP CAPITAL EFFICIENCY LARGE RESOURCES & LAND (capital / environment / oil recovery) 3

Slide 4: Company overview and history
Proprietary extraction process Small environmental footprint, no tailings ponds Calgary-based oil sands mining $20,000-$30,000/bpd capital intensity company TSX Venture listed: “USO” Executing on 2,000 bpd project in Utah Market cap: C$77MM(1) Funded and permitted, first-oil Q1 2016 C$

Slide 5: US Oil Sands' patented extraction process
US Oil Sands’ patented extraction process is one of the most important breakthroughs in mineable oil sands extraction techniques in more than 45 years. 90-96% Bitumen recovery Front-end engagement of bio-solvent Eliminates bitumen froth treatment, no 0 Eliminates tailings ponds middling sludge c

Slide 6: Competitive advantages of the extraction process
Low threshold Smallest footprint of any mineable oil Low Up Elimination of tailings ponds, bitumen sands project Smallest Front froth treatment, middlings sludge and Eliminates need for tailings ponds, Footprint Capital tailings recovery lowers capital costs enabling rapid reclamation $20,

Slide 7: Lowest capital intensity of any recent oil sands mining project
Lowest capital intensity of any recent oil sands mining project – even at small scale Non-Integrated Oil Sands Mining Projects Capital Efficiency ($/bbl/d) $120,000 Athabasca average $93,646/bbl/d $100,000 $80,000 $60,000 $40,000 $20,000 $0 US Oil Sands(1) US Oil Sands Frontier Joslyn Pierre River(2

Slide 8: Greenhouse gas emissions per barrel of refined products
USO expects to be lower than any existing oil sands project and lower than many conventional projects kgCO2e/Barrel of Refined Products US-California Midway Sunset Venezuela-Petrozuata US-California Kern River Cdn Oil Sands-SAGD Bitumen Ave Oil Sands Refined in US (2011) Nigeria-Bonny Light Cdn Oil

Slide 9: Simultaneous mining and reclamation
Simultaneous mining and reclamation means land can be returned to its natural state in 4 – 6 years Year 1 – Mine Opening Year 2 – Backfill Commences Year 3 – Initial Revegetation Concurrent reclamation is a first in oil sands mining Year 4 – Continued Reclamation USO’s surface footprint is estimat

Slide 10: Largest oil sands land base in the U.S.
Largest oil sands land base in the U.S. PR Spring Project area Development 100% working interest in 5,930 acres Area 184 MMbbls Discovered Resource(1) Exploration Cedar Camp and NW exploration blocks Area 100% working interest in 26,075 acres (1) Sproule Unconventional Limited report at De

Slide 11: Fully approved surface mine and development project
Fully approved surface mine and Large known resource development project - Estimated up to 30 billion barrels in place Uinta Basin in NE Utah Development-oriented state; attractive royalties Proximity to ideal markets Initial 2,000 bpd phase - Low transportation costs, better product prici

Slide 12: 2,000 bpd demonstration project to prove commerciality
2,000 bpd demonstration project to prove commerciality of the process Prove it’s Game-changing; no Show-stoppers No tailings pond High oil recovery High bio-solvent recovery and recycle Low capital intensity Continuous safe operation Use the success of Phase I to prove viability of tar

Slide 13: Proven technology, fully permitted, fully financed
Proven Extensive pilot testing Technology of extraction process Fully Phase I approved by DIVISION OF OIL, Permitted Utah regulators GAS AND MINING Fully Phase I project funded Financed to first-oil Under Construction nearing Development completion 13

Slide 14: Construction progress: major equipment set
All major equipment set, installing piping and electrical/instrumentation 14

Slide 15: PR Spring Project - Phase I schedule
PR Spring Project - Phase I 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Mine Planning Basic & Detailed Engineering Equipment Procurement Plant Site Grading Equipment & Plant Fabrication Water Tie-in Mob, Erect, Commission Haul Rd/Pit Opening Ore Stockpiling, Mining Bitumen Production Debottle

Slide 16: Rapid build-up in phases, modular construction
Rapid build-up in phases Modular construction allows for flexible development of various capacities - Can be stand-alone, sequential or scaled-up Low capital threshold: $20,000-$30,000/bpd of capacity First commercial demonstration of Deploy 10,000 bpd modules as the technology resources a

Slide 17: Stranded bitumen resources worldwide
Example of stranded bitumen resources in Athabasca Billions of barrels of mineable bitumen... stranded - Stranded by scale in pools too small for mega-projects - Stranded economically in lower-grade deposits - Stranded without a social license to produce These resources are well suited to USO’s

Slide 18: Extraction process, resource and location differentiation
Extraction Process - Environmental advantages = social license - Reduced capital costs = economic license - Wide range of resources developable - Simplifying technology Resource Characteristics - Low sulphur, TAN, and metals Value compared to Athabasca bitumen Differentiation - Lighter than Atha

Slide 19: Management team
Experienced leader with over 30 years in oil, gas and oil sands development and operations, most recently as Senior VP Operations, Refining and Marketing at Connacher Oil and Gas Cameron Todd CEO 13 years as an executive in U.S., Canadian and international oil companies with extensive experience

Slide 20: Board of directors
Mark Brown, Director Verne Johnson, Chairman of the Board Co-founder, Seven Generations Energy Ltd. Chairman of Petromanas Energy Inc. Previously Vice President, EPC of North Former CEO of ELAN Energy Inc. American Oil Sands Corporation Ronald Pantin, Director Alfred Holcomb, Director CEO

Slide 21: Capitalization: C$38.3 million, no debt
Ticker USO Exchange TSX Venture Shares Out (Basic) 853.1 million Options 53.2 million (average exercise price of $0.19) Restricted Share Units 13.3 million Share Out (Fully Diluted) 919.7 million Current Share Price(1) C$0.09 52 Week High (Aug. 7, 2015) C$0.17 52 Week Low (April 20, 2015) C$0.07 Mar

Slide 22: Share price and volume vs. peers
$0.18 2,500 $0.16 $0.14 2,000 $0.12 1,500 Price per share Volume (000s) $0.10 $0.08 1,000 $0.06 $0.04 500 $0.02 $0.00 0 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 120% 100% 80% 60% 40% 20% 0% -20% -40% -60% Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul

Slide 23: Changing the way oil sands bitumen is extracted
USO’s next generation bio-solvent technology represents a paradigm shift in surface mineable oil sands economics and environmental impact - Best-in-class capital efficiency, environmental footprint, oil recovery Commercialization of the process provides significant opportunities for resource dev

Slide 24: U.S. Oil Sands' PR Spring Project
U.S. OIL SANDS’

Slide 25: Core hole control and ore grade
184 core holes provide strong well control - Down to 2.5-acre spacing, >4,400 assays Multiple beds; combined pay thickness up to 100 feet, average overburden only 25 feet Ore grade range of 5 – 15 wt% - Average 10 wt% in planned pits Significant resource beyond Phase I area PR Spring Develop

Slide 26: Continuous surface miner and mining trials
Continuous Surface Miner: 500-700 tph of milled & windrowed ore Exposing Top of Ore Bed 2012 Mining Trials Milled & Bagged Ore for Testing 26

Slide 27: Ore bed outcrop along Pit 1 haul road
Ore bed out-crop along Pit 1 North Haul Road (O/B thickness @ 3-5m) I-70 / UPR Corridor (40 mi. South) Pit 1 Box-cut - Overburden removal (Oct 29/15) 27

Slide 28: PR Spring Project area
To Vernal UT 80 mi. North Phase II Mining Area Plant Site Test Pit Pit #1 Opening I-70 / UPR Pit #2 Box Cut Corridor (40 mi. South) Main Haul Road Overburden Storage Area PR SPRING PROJECT AREA - Viewing NE 28

Slide 29: Plant site layout
Mine maintenance Admin / control warehouse Ore stockpile room building radial stacker Finished Process water tanks Scraper dump product oil tanks Rotary mixer Solvent recovery distillation unit Turbine Feed hopper Ore stockpiles generators Main processing units Screening crusher unit Temporary tails

Slide 30: U.S. Oil Sands' technology
ws U.S. OIL SANDS*

Slide 31: Oil-wet vs. water-wet oil sands
Sand grains directly encased with oil toiloilsands Sand sands Found Athabasca oil sands areU.S. in the “water-wet” & most other areas worldwide Bitumen - Sand grains enveloped by water, then by oil Sand grained enveloped by water, then by oil - Traditional extraction process (the Clark Hot Wa

Slide 32: Process flow diagram
Primary Separation Bitumen/Fines/Water Feed Hopper Milled Ore from Mine Water Rotating PSV 1 PSV 2 Ore De-lumper Drum Mixer Stockpile Bulk Secondary Separator Ore Conditioning Separation Make-up Rock Rejection Bitumen Chemical Hot Water & Fines Condensed Solvent Solvent Extraction Dilute Bitumen Rec

Slide 33: 24 bpd demonstration unit in Grande Prairie
24 bpd shop demonstration unit (pilot plant) in Grande Prairie, Alberta 33

Slide 34: Pilot plant process photos
Oil sand ore ready to be fed into the feed hopper Oil / water / bio-solvent / solids slurry discharge Separation vessel from the rotating drum mixer overflow Dilute bitumen discharge to holding tank Clean damp sand on dewatering screen Clean damp sand, no oil or bio-solvent residue 34

Slide 35: Contact details
Suite 1600, 521 – 3rd Avenue SW Calgary, Alberta T2P 3T3 (403) 233-9366 TSX-V: USO www.usoilsandsinc.com
Source: Internet Archive copy of usoilsandsinc.com
More decks from US Oil Sands Inc.
Investor Presentation (September 2016)33 slides · September 2016
Investor Presentation (July 2015)35 slides · July 2015
Investor Presentation (September 2014)30 slides · September 2014
Investor Presentation (September 2013)26 slides · September 2013
Shareholder Meeting (May 2013)22 slides · May 15, 2013
Investor Presentation (May 2013)25 slides · May 2013