  1. Slide 1: Corporate Presentation September 2016

    Slide 1: Corporate Presentation September 2016

    September 2016 TSX-V: USO www.usoilsandsinc.com

  2. Slide 2: Forward-looking statements

    Slide 2: Forward-looking statements

    This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward-looking statements in this presentation include, but are not limited to, statements with respect to: bu

  3. Slide 3: Innovation, environmental leadership, capital efficiency, large resources

    Slide 3: Innovation, environmental leadership, capital efficiency, large resources

    INNOVATION BREAKTHROUGH ENVIRONMENTAL LEADERSHIP CAPITAL EFFICIENCY LARGE RESOURCES & LAND (capital / environment / oil recovery) 3

  4. Slide 4: PR Spring Project 98% complete

    Slide 4: PR Spring Project 98% complete

     PR Spring Project 98% complete - Commercial operation unlocks USO’s High value proposition Recovery  USO is a next-gen resource developer - Unique in its ability to separate oil environmentally, at low capital cost and at low oil prices Environmental  USO is a continuous innovator of Sustainabil

  5. Slide 5: World petroleum consumption

    Slide 5: World petroleum consumption

     Global oil consumption continues to increase World Petroleum Consumption 100 - 100 million bpd by 2020 95  Excess supply won’t persist 90 Characteristics of 85 Million Barrels per Day Successful Future Producers 80 75 Low Capital 70 Cost 65 60 55 50 Environmentally 1980 1984 1988 1992 1996 2000 2

  6. Slide 6: Sustainable energy development

    Slide 6: Sustainable energy development

     The UN predicts world population will reach 9 billion by 2050 - For every barrel of oil conserved in the developed world, two barrels more are consumed in the developing world(1)  Every energy generating process has impacts on the environment - Land disturbance, use of hazardous materials in manu

  7. Slide 7: USO is an innovator of oil extraction technologies

    Slide 7: USO is an innovator of oil extraction technologies

     USO is an innovator of oil extraction technologies - Patented and low-cost bio-solvent extraction process for surface mineable oil sands - First surface mining oil sands operation to use concurrent reclamation - First to use a continuous surface mining machine for oil sands ore - First to use an o

  8. Slide 8: US Oil Sands' patented process

    Slide 8: US Oil Sands' patented process

    US Oil Sands’ patented process is one of the most important breakthroughs in mineable oil sands extraction techniques in more than 45 years. 90-96% Bitumen recovery  Front-end engagement of bio-solvent  Eliminates bitumen froth treatment, no 0 Eliminates tailings ponds middling sludge created  Hi

  9. Slide 9: Bio-solvent extraction process vs Clark Hot Water process

    Slide 9: Bio-solvent extraction process vs Clark Hot Water process

     USO’s bio-solvent extraction process updates the nearly 100-year old Clark Hot Water process currently used in Athabasca Reclamation Capital $20,000 - $30,000/bpd ~$100,000/bpd Intensity 90% - 96% Oil Recovery 80% - 90% Lower than many conventional GHG Some of the most GHG intensive crude sources(

  10. Slide 10: USO's separation expertise is rapidly evolving

    Slide 10: USO's separation expertise is rapidly evolving

     USO’s separation expertise is rapidly evolving Expanded fundamental understanding of oil and Oil-Water- water separation principles from oil-wet and water- Mineral wet oil sand ore Surface Leveraging oil-wet oil sand ore Chemistry properties in unique process separation equipment Only process that

  11. Slide 11: Fully approved surface mine and development project

    Slide 11: Fully approved surface mine and development project

    Fully approved surface mine and development project  Large known resource - Estimated up to 30 billion barrels in place  Uinta Basin in NE Utah  Development-oriented state; attractive royalties  Initial 2,000 bpd phase 98% complete  Proximity to ideal markets - Low transportation costs, better

  12. Slide 12: U.S. Oil Sands

    Slide 12: U.S. Oil Sands

    12 U.S. OIL SANDS*

  13. Slide 13: PR Spring Project - Phase I

    Slide 13: PR Spring Project - Phase I

    PR Spring Project - Phase I 2014 2015 2016 2017 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Mine Planning Basic & Detailed Engineering Equipment Procurement Site Grading Equipment Fabrication Water Tie-in Site Construction and Commissioning Pit Opening Ore Stockpiling, On-going Mining Bitumen Pr

  14. Slide 14: Environmental attributes and social license

    Slide 14: Environmental attributes and social license

     PR Spring Project 98% complete - Turning point for USO that unlocks the company’s value proposition  USO is a next-gen resource developer Enviro Social - Unique in its ability to separate oil Attributes License environmentally, at low capital cost and at low oil prices Low Economic  USO is a con

  15. Slide 15: International growth and phased development

    Slide 15: International growth and phased development

     Optimize design - Based on learnings from Phase I  Phased development - Add up to 5 - 10,000 bpd Phase II  Deploy 5 - 10,000 bpd modules as resources are acquired / developed - Modular design scales to resource size, provides capital deployment flexibility - Off-the-shelf equipment leads to Inte

  16. Slide 16: Rapid build-up in phases

    Slide 16: Rapid build-up in phases

     Rapid build-up in phases  Modular construction allows for flexible development of various capacities - Can be stand-alone, sequential or scaled-up  Low capital threshold: $20,000-$30,000/bpd of capacity 2,000 bpd Commercial Demo Unit 10,000 bpd Production Units  First commercial demonstration o

  17. Slide 17: Stranded bitumen resources

    Slide 17: Stranded bitumen resources

    Example of stranded bitumen resources in Athabasca  Billions of barrels of mineable bitumen... stranded - Stranded by scale in pools too small for mega-projects - Stranded economically in lower-grade deposits - Stranded without a social license to produce  These resources are well suited to USO’s

  18. Slide 18: Changing the way oil sands bitumen is extracted

    Slide 18: Changing the way oil sands bitumen is extracted

     USO’s next generation bio-solvent technology represents a paradigm shift in surface mineable oil sands - Best-in-class capital efficiency, environmental footprint, oil recovery  The process provides significant opportunities for resource development - Initiates oil sands development in the U.S. -

  19. Slide 19: U.S. Oil Sands

    Slide 19: U.S. Oil Sands

    U.S. OIL SANDS’

  20. Slide 20: Company overview and history

    Slide 20: Company overview and history

    Proprietary extraction process  Small environmental footprint, no tailings ponds  Calgary-based oil sands mining  $20,000-$30,000/bpd capital intensity company  TSX Venture listed: “USO” Executing on 2,000 bpd project in Utah  Market cap: C$43MM(1)  Operational Q4 2016  C$6MM in working capit

  21. Slide 21: Lowest capital intensity of any recent oil sands mining project

    Slide 21: Lowest capital intensity of any recent oil sands mining project

    Lowest capital intensity of any recent oil sands mining project – even at small scale Non-Integrated Oil Sands Mining Projects Capital Efficiency ($/bbl/d) $120,000 Athabasca average $92,553/bbl/d $100,000 $80,000 $60,000 USO Projects $40,000 $20,000 $0 US Oil Sands(1) US Oil Sands Frontier Joslyn P

  22. Slide 22: Simultaneous mining and reclamation

    Slide 22: Simultaneous mining and reclamation

    Simultaneous mining and reclamation means land can be returned to its natural state in 4 – 6 years Year 1 – Mine Opening Year 2 – Backfill Commences Year 3 – Initial Revegetation Concurrent reclamation is a first in oil sands mining Year 4 – Continued Reclamation  USO’s surface footprint is estimat

  23. Slide 23: GHG emissions versus other crude sources

    Slide 23: GHG emissions versus other crude sources

    USO expects to be lower than any existing oil sands project and lower than many conventional projects kgCO2e/Barrel of Refined Products US-California Midway Sunset Venezuela-Petrozuata US-California Kern River Cdn Oil Sands-SAGD Bitumen Ave Oil Sands Refined in US (2011) Nigeria-Bonny Light Cdn Oil

  24. Slide 24: Largest oil sands land base in the U.S.

    Slide 24: Largest oil sands land base in the U.S.

    Largest oil sands land base in the U.S.  PR Spring Project area Development  100% working interest in 5,930 acres Area  184 MMbbls Discovered Resource(1) Exploration  Cedar Camp and NW exploration blocks Area  100% working interest in 26,075 acres (1) Sproule Unconventional Limited report at De

  25. Slide 25: PR Spring Development Block

    Slide 25: PR Spring Development Block

     184 core holes provide strong well control PR Spring Development Block - Down to 2.5-acre spacing, >4,400 assays (5,930 acres)  Multiple beds; combined pay thickness up to 100 feet, average overburden only 25 feet  Ore grade range of 5 – 15 wt% - Average 10 wt% in planned pits  Significant reso

  26. Slide 26: Continuous Surface Miner

    Slide 26: Continuous Surface Miner

    Continuous Surface Miner: 500-700 tph of milled & windrowed ore Exposing Top of Ore Bed 2012 Mining Trials Milled & Bagged Ore for Testing 26

  27. Slide 27: PR Spring Project Area

    Slide 27: PR Spring Project Area

    To Vernal UT 80 mi. North Plant Site Test Pit Pit #1 Opening I-70 / UPR Pit #2 Box Cut Corridor (40 mi. South) Main Haul Road Overburden Storage Area PR SPRING PROJECT AREA - Viewing NE 27

  28. Slide 28: 24 bpd shop demonstration unit in Grande Prairie

    Slide 28: 24 bpd shop demonstration unit in Grande Prairie

     24 bpd shop demonstration unit (pilot plant) in Grande Prairie, Alberta 28

  29. Slide 29: Pilot plant process photos

    Slide 29: Pilot plant process photos

    Oil sand ore ready to be fed into the Slurry (oil/water/bio-solvent/solids) Bitumen overflow launder on top of primary feed hopper discharge from the rotating drum mixer separation vessel Dilute bitumen discharge to holding tank Clean damp sand on dewatering screen Clean damp sand, no oil or bio-sol

  30. Slide 30: Management team

    Slide 30: Management team

     Experienced leader with over 30 years in oil, gas and oil sands development and operations, most recently as Senior VP Operations, Refining and Marketing at Connacher Oil and Gas Cameron Todd CEO  13 years as an executive in U.S., Canadian and international oil companies with extensive experience

  31. Slide 31: Board of Directors

    Slide 31: Board of Directors

    Board of Directors Verne Johnson, Chairman of the Board Mark Brown, Director  Former CEO of ELAN Energy Inc.  Co-founder, Seven Generations Energy Ltd.  Former Director of Gran Tierra Energy Inc. and  Previously Vice President, EPC of North Chairman of Petromanas Energy Inc. American Oil Sands C

  32. Slide 32: Capital structure

    Slide 32: Capital structure

    Ticker USO Exchange TSX Venture Shares Out (Basic)(1) 1,706 million Options & Warrants(1) 211.8 million (average exercise price of C$0.06) Restricted Share Units(1) 12.6 million Share Out (Fully Diluted) 1,931 million Current Share Price(2) C$0.025 52 Week High (Nov. 12, 2015) C$0.105 52 Week Low (S

  33. Slide 33: Contact

    Slide 33: Contact

    Suite 1600, 521 – 3rd Avenue SW Calgary, Alberta T2P 3T3 (403) 233-9366 TSX-V: USO www.usoilsandsinc.com