US Oil Sands — Investor Presentation (July 2015)
35 slides from US Oil Sands's investor presentation, July 2015

Slide 1: Corporate Presentation
Corporate Presentation July 2015 TSX-V: USO www.usoilsandsinc.com

Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward- looking statements in this presentation include, but are not limited to, st

Slide 3: Overview
OVERVIEW INNOVATION BREAKTHROUGH ENVIRONMENTAL LEADERSHIP CAPITAL EFFICIENCY LARGE RESOURCES & LAND (capital / environment / oil recovery) 3

Slide 4: Company Snapshot
COMPANY SNAPSHOT Proprietary extraction process Corporate Profile Small environmental footprint, no tailings ponds Calgary-based oil sands mining $20,000-$30,000/bpd capital intensity company TSX Venture listed: “USO” Executing on 2,000 bpd project in Utah Market cap: C$102MM(1) Funded a

Slide 5: Breakthrough Extraction Process
BREAKTHROUGH EXTRACTION PROCESS Our process uses a biodegradable solvent extracted from citrus fruits US Oil Sands’ patented extraction process is one of the most important breakthroughs in mineable oil sands extraction techniques in more than 45 years. 90-96% Bitumen recovery Process Facts Uses l

Slide 6: Game-Changing Benefits
GAME-CHANGING BENEFITS Economic Benefits Environmental Benefits Low threshold Smallest footprint of any oil sands Low Up Elimination of tailings ponds, bitumen mining process Smallest Front froth treatment, middlings sludge and Eliminates need for tailings ponds, Footprint Capital tailings r

Slide 7: Superior Capital Efficiency
SUPERIOR CAPITAL EFFICIENCY Lowest capital intensity of any recent mining oil sands project – even at small scale Non-Integrated Oil Sands Mining Projects Capital Efficiency ($/bbl/d) $120,000 $100,000 Athabasca average $92,553/bbl/d $80,000 $60,000 $40,000 $20,000 $0 US Oil Sands(1) US Oil Sands Jo

Slide 8: Low GHG Emissions
LOW GHG EMISSIONS USO expects to be lower than any existing oil sands project and lower than many conventional projects kgCO2e/Barrel of Refined Products US-California Midway Sunset Venezuela-Petrozuata US-California Kern River Cdn Oil Sands-SAGD Bitumen Ave Oil Sands Refined in US (2011) Nigeria-Bo

Slide 9: Concurrent Reclamation
CONCURRENT RECLAMATION Simultaneous mining and reclamation means land can be returned to its natural state in 4 – 6 years Year 1 – Mine Opening Year 2 – Backfill Commences Year 3 – Initial Revegetation Concurrent reclamation is a first in oil sands mining Year 4 – Continued Reclamation USO’s surfa

Slide 10: Extensive Land & Resources
EXTENSIVE LAND & RESOURCES Largest oil sands land base in the U.S. PR Spring Project area Development 100% working interest in 5,930 acres Area 184 MMbbls Discovered Resource(1) Exploration Cedar Camp and NW exploration blocks Area 100% working interest in 26,075 acres (1) Sproule Unconven

Slide 11: PR Spring Project
PR SPRING PROJECT Fully approved surface mine and Utah - Attractive Oil Sands Development Large known resource development project - Estimated up to 30 billion barrels in place Uinta Basin in NE Utah Development-oriented state; attractive royalties Proximity to ideal markets Initial 2,000

Slide 12: Commercial Demo Objectives
COMMERCIAL DEMO OBJECTIVES 2,000 bpd demonstration project to prove commerciality of the process Primary Success Measures Prove it’s Game-changing; no Show-stoppers No tailings pond High oil recovery High solvent recovery and recycle Low capital intensity Continuous safe operation Use

Slide 13: Milestones Achieved
MILESTONES ACHIEVED Proven Extensive pilot testing Technology of extraction process Fully Phase I approved by DIVISION OF OIL, Permitted Utah regulators GAS AND MINING Fully Phase I funded to Financed first-oil Under Field construction Development ongoing 13

Slide 14: Project Schedule
PROJECT SCHEDULE PR Spring Project - Phase I 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Mine Planning Basic & Detailed Engineering Equipment Procurement Site Preparation Overburden Removal, Ore Stockpiling and On-Going Mine Operations Equipment & Plant Fabrication Water Tie-in Site Prep/Road

Slide 15: Phased Production Growth
PHASED PRODUCTION GROWTH Rapid build-up in phases Modular construction allows for flexible development of various capacities - Can be stand-alone, sequential or scaled-up Low capital threshold: $20,000-$30,000/bpd of capacity 2,000 bpd Commercial Demo Unit 10,000 bpd Production Units First c

Slide 16: Markets
MARKETS Crude quality - 10-12° API, sweet, heavy crude Targeted Netbacks - Highly suitable for heavy oil refineries Crude Oil Price (Brent) $60 / bbl(1) Market options provide higher Heavy Differential $5 netbacks Transportation $16 - 40 refineries in the region with over 3 million bpd capacity

Slide 17: The Opportunity
THE OPPORTUNITY Billions of barrels of Example of stranded bitumen resources in Athabasca mineable bitumen stranded - Economically stranded in pools too small for mega- projects - Economically stranded in low-grade deposits - Stranded without a social license to produce These resources are well

Slide 18: Value Differentiation
VALUE DIFFERENTIATION Extraction Process - Environmental advantages = social license - Reduced capital costs = economic license - Wide range of resources developable - Simplifying technology Resource Characteristics - Low sulphur, TAN, and metals Value compared to Athabasca bitumen Differentiati

Slide 19: Experienced Leadership
EXPERIENCED LEADERSHIP Management Team Experienced leader with over 30 years in oil, gas and oil sands development and operations, most recently as Senior VP Operations, Refining and Marketing at Connacher Oil and Gas Cameron Todd CEO 13 years as an executive in U.S., Canadian and international

Slide 20: Strong Governance
STRONG GOVERNANCE Board of Directors Mark Brown, Director Verne Johnson, Chairman of the Board Co-founder, Seven Generations Energy Ltd. Chairman of Petromanas Energy Inc. Previously Vice President, EPC of North Former CEO of ELAN Energy Inc. American Oil Sands Corporation Ronald Pantin, Dir

Slide 21: Capitalization
CAPITALIZATION Ticker USO Exchange TSX Venture Shares Out (Basic) 853.1 million Options 56.1 million (average exercise price of $0.18) Restricted Share Units 14.1 million Share Out (Fully Diluted) 923.4 million Current Share Price(1) C$0.12 52 Week High (Sept. 2, 2014) C$0.13 52 Week Low (Apr. 20, 2

Slide 22: LTM Share Price Performance
LTM SHARE PRICE PERFORMANCE $0.14 6,000 $0.12 5,000 $0.10 4,000 $0.08 Price per share Volume (000s) 3,000 $0.06 2,000 $0.04 $0.02 1,000 $0.00 0 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 20% 10% 0% -10% -20% -30% -40% -50% -60% -70% Jun-14 Jul-14 Aug-14 Sep-1

Slide 23: Conclusion
CONCLUSION USO’s next generation solvent technology represents a paradigm shift in surface mineable oil sands economics and environmental impact - Best-in-class capital efficiency, environmental footprint, oil recovery Commercialization of the process provides significant opportunities for resou

Slide 24: Appendix
U.S. OIL SANDS*

Slide 25: Well-Defined Resources
WELL-DEFINED RESOURCES 184 core holes provide strong well control - Up to 2.5-acre spacing, >4,400 assays Multiple beds; combined pay thickness up to 100 feet, average overburden only 25 feet Ore grade range of 5 – 15 wt% - Average 10 wt% in planned pits Significant resource beyond Phase I a

Slide 26: PR Spring Project Aerial View
PR SPRING PROJECT AERIAL VIEW Test pit Plant site USO#5 water well PW-1 water well New Seep Ridge Secondary Hwy Gas pipeline compressor station Drill camp site 26

Slide 27: Plant Site Aerial View
PLANT SITE AERIAL VIEW 27

Slide 28: Plant Site Layout
PLANT SITE LAYOUT Mine maintenance Admin / control warehouse Ore stockpile room building radial stacker Finished Process water tanks Scraper dump product oil tanks Rotary mixer Solvent recovery distillation unit Turbine Feed hopper Ore stockpiles generators Main processing units Screening crusher un

Slide 29: Plant Engineering Model
PLANT ENGINEERING MODEL 29

Slide 30: Construction Progress
CONSTRUCTION PROGRESS Plant foundations set, main pipe rack infrastructure installed 30

Slide 31: Oil-Wet Oil Sands Application
OIL-WET OIL SANDS APPLICATION Athabasca oil sands are “water-wet” Water-wet Oil Sands - Sand grains enveloped by water, then by oil - Traditional extraction process (the Clark Hot Water Sand Process) uses hot water to remove the oil but hard to Water break oil-water-clay suspensions / emulsions ar

Slide 32: USO's Extraction Process
USO’S EXTRACTION PROCESS Primary Separation Bitumen/Fines/Water Feed Hopper Milled Ore from Mine Water Rotating PSV 1 PSV 2 Ore De-lumper Drum Mixer Stockpile Bulk Secondary Separator Ore Conditioning Separation Make-up Rock Rejection Bitumen Chemical Hot Water & Fines Condensed Solvent Solvent Extr

Slide 33: Pilot Facility
PILOT FACILITY 24 bpd shop demonstration unit in Grande Prairie, Alberta Bio-solvent Rotating drum Centrifuge & Sand screen & storage tank mixer control panel storage bin Fee hopper & Separation Water & dilute de-lumper vessels bitumen tanks USO continues to lead in technology development and appl

Slide 34: Shop Demonstration Unit Run
SHOP DEMONSTRATION UNIT RUN Oil sand ore ready to be fed into the feed hopper Oil / water / solvent / solids slurry discharge Separation vessel top from the rotating drum mixer stream Clean dilute bitumen flowing into a holding tank Clean damp sand on the vibrating screen Clean damp sand, no oil pro

Slide 35: TSX-V: USO www.usoilsandsinc.com
Cameron M. Todd CEO cameron.todd@usoilsandsinc.com D. Glen Snarr President & CFO glen.snarr@usoilsandsinc.com Suite 1600, 521 – 3rd Avenue SW Calgary, Alberta T2P 3T3 (403) 233-9366 TSX-V: USO www.usoilsandsinc.com
Source: Internet Archive copy of usoilsandsinc.com
More decks from US Oil Sands Inc.
Investor Presentation (September 2016)33 slides · September 2016
Investor Presentation (December 2015)35 slides · December 2015
Investor Presentation (September 2014)30 slides · September 2014
Investor Presentation (September 2013)26 slides · September 2013
Shareholder Meeting (May 2013)22 slides · May 15, 2013
Investor Presentation (May 2013)25 slides · May 2013