US Oil Sands Inc.

US Oil Sands — Investor Presentation (July 2015)

35 slides from US Oil Sands's investor presentation, July 2015

  1. Slide 1: Corporate Presentation

    Slide 1: Corporate Presentation

    Corporate Presentation July 2015 TSX-V: USO www.usoilsandsinc.com

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward- looking statements in this presentation include, but are not limited to, st

  3. Slide 3: Overview

    Slide 3: Overview

    OVERVIEW INNOVATION BREAKTHROUGH ENVIRONMENTAL LEADERSHIP CAPITAL EFFICIENCY LARGE RESOURCES & LAND (capital / environment / oil recovery) 3

  4. Slide 4: Company Snapshot

    Slide 4: Company Snapshot

    COMPANY SNAPSHOT Proprietary extraction process Corporate Profile  Small environmental footprint, no tailings ponds  Calgary-based oil sands mining  $20,000-$30,000/bpd capital intensity company  TSX Venture listed: “USO” Executing on 2,000 bpd project in Utah  Market cap: C$102MM(1)  Funded a

  5. Slide 5: Breakthrough Extraction Process

    Slide 5: Breakthrough Extraction Process

    BREAKTHROUGH EXTRACTION PROCESS Our process uses a biodegradable solvent extracted from citrus fruits US Oil Sands’ patented extraction process is one of the most important breakthroughs in mineable oil sands extraction techniques in more than 45 years. 90-96% Bitumen recovery Process Facts  Uses l

  6. Slide 6: Game-Changing Benefits

    Slide 6: Game-Changing Benefits

    GAME-CHANGING BENEFITS Economic Benefits Environmental Benefits  Low threshold  Smallest footprint of any oil sands Low Up  Elimination of tailings ponds, bitumen mining process Smallest Front froth treatment, middlings sludge and  Eliminates need for tailings ponds, Footprint Capital tailings r

  7. Slide 7: Superior Capital Efficiency

    Slide 7: Superior Capital Efficiency

    SUPERIOR CAPITAL EFFICIENCY Lowest capital intensity of any recent mining oil sands project – even at small scale Non-Integrated Oil Sands Mining Projects Capital Efficiency ($/bbl/d) $120,000 $100,000 Athabasca average $92,553/bbl/d $80,000 $60,000 $40,000 $20,000 $0 US Oil Sands(1) US Oil Sands Jo

  8. Slide 8: Low GHG Emissions

    Slide 8: Low GHG Emissions

    LOW GHG EMISSIONS USO expects to be lower than any existing oil sands project and lower than many conventional projects kgCO2e/Barrel of Refined Products US-California Midway Sunset Venezuela-Petrozuata US-California Kern River Cdn Oil Sands-SAGD Bitumen Ave Oil Sands Refined in US (2011) Nigeria-Bo

  9. Slide 9: Concurrent Reclamation

    Slide 9: Concurrent Reclamation

    CONCURRENT RECLAMATION Simultaneous mining and reclamation means land can be returned to its natural state in 4 – 6 years Year 1 – Mine Opening Year 2 – Backfill Commences Year 3 – Initial Revegetation Concurrent reclamation is a first in oil sands mining Year 4 – Continued Reclamation  USO’s surfa

  10. Slide 10: Extensive Land & Resources

    Slide 10: Extensive Land & Resources

    EXTENSIVE LAND & RESOURCES Largest oil sands land base in the U.S.  PR Spring Project area Development  100% working interest in 5,930 acres Area  184 MMbbls Discovered Resource(1) Exploration  Cedar Camp and NW exploration blocks Area  100% working interest in 26,075 acres (1) Sproule Unconven

  11. Slide 11: PR Spring Project

    Slide 11: PR Spring Project

    PR SPRING PROJECT Fully approved surface mine and Utah - Attractive Oil Sands Development  Large known resource development project - Estimated up to 30 billion barrels in place  Uinta Basin in NE Utah  Development-oriented state; attractive royalties  Proximity to ideal markets  Initial 2,000

  12. Slide 12: Commercial Demo Objectives

    Slide 12: Commercial Demo Objectives

    COMMERCIAL DEMO OBJECTIVES  2,000 bpd demonstration project to prove commerciality of the process Primary Success Measures Prove it’s Game-changing; no Show-stoppers  No tailings pond  High oil recovery  High solvent recovery and recycle  Low capital intensity  Continuous safe operation  Use

  13. Slide 13: Milestones Achieved

    Slide 13: Milestones Achieved

    MILESTONES ACHIEVED Proven  Extensive pilot testing Technology of extraction process Fully  Phase I approved by DIVISION OF OIL, Permitted Utah regulators GAS AND MINING Fully  Phase I funded to Financed first-oil Under  Field construction Development ongoing 13

  14. Slide 14: Project Schedule

    Slide 14: Project Schedule

    PROJECT SCHEDULE PR Spring Project - Phase I 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Mine Planning Basic & Detailed Engineering Equipment Procurement Site Preparation Overburden Removal, Ore Stockpiling and On-Going Mine Operations Equipment & Plant Fabrication Water Tie-in Site Prep/Road

  15. Slide 15: Phased Production Growth

    Slide 15: Phased Production Growth

    PHASED PRODUCTION GROWTH  Rapid build-up in phases  Modular construction allows for flexible development of various capacities - Can be stand-alone, sequential or scaled-up  Low capital threshold: $20,000-$30,000/bpd of capacity 2,000 bpd Commercial Demo Unit 10,000 bpd Production Units  First c

  16. Slide 16: Markets

    Slide 16: Markets

    MARKETS  Crude quality - 10-12° API, sweet, heavy crude Targeted Netbacks - Highly suitable for heavy oil refineries Crude Oil Price (Brent) $60 / bbl(1)  Market options provide higher Heavy Differential $5 netbacks Transportation $16 - 40 refineries in the region with over 3 million bpd capacity

  17. Slide 17: The Opportunity

    Slide 17: The Opportunity

    THE OPPORTUNITY  Billions of barrels of Example of stranded bitumen resources in Athabasca mineable bitumen stranded - Economically stranded in pools too small for mega- projects - Economically stranded in low-grade deposits - Stranded without a social license to produce  These resources are well

  18. Slide 18: Value Differentiation

    Slide 18: Value Differentiation

    VALUE DIFFERENTIATION  Extraction Process - Environmental advantages = social license - Reduced capital costs = economic license - Wide range of resources developable - Simplifying technology  Resource Characteristics - Low sulphur, TAN, and metals Value compared to Athabasca bitumen Differentiati

  19. Slide 19: Experienced Leadership

    Slide 19: Experienced Leadership

    EXPERIENCED LEADERSHIP Management Team  Experienced leader with over 30 years in oil, gas and oil sands development and operations, most recently as Senior VP Operations, Refining and Marketing at Connacher Oil and Gas Cameron Todd CEO  13 years as an executive in U.S., Canadian and international

  20. Slide 20: Strong Governance

    Slide 20: Strong Governance

    STRONG GOVERNANCE Board of Directors Mark Brown, Director Verne Johnson, Chairman of the Board  Co-founder, Seven Generations Energy Ltd.  Chairman of Petromanas Energy Inc.  Previously Vice President, EPC of North  Former CEO of ELAN Energy Inc. American Oil Sands Corporation Ronald Pantin, Dir

  21. Slide 21: Capitalization

    Slide 21: Capitalization

    CAPITALIZATION Ticker USO Exchange TSX Venture Shares Out (Basic) 853.1 million Options 56.1 million (average exercise price of $0.18) Restricted Share Units 14.1 million Share Out (Fully Diluted) 923.4 million Current Share Price(1) C$0.12 52 Week High (Sept. 2, 2014) C$0.13 52 Week Low (Apr. 20, 2

  22. Slide 22: LTM Share Price Performance

    Slide 22: LTM Share Price Performance

    LTM SHARE PRICE PERFORMANCE $0.14 6,000 $0.12 5,000 $0.10 4,000 $0.08 Price per share Volume (000s) 3,000 $0.06 2,000 $0.04 $0.02 1,000 $0.00 0 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 20% 10% 0% -10% -20% -30% -40% -50% -60% -70% Jun-14 Jul-14 Aug-14 Sep-1

  23. Slide 23: Conclusion

    Slide 23: Conclusion

    CONCLUSION  USO’s next generation solvent technology represents a paradigm shift in surface mineable oil sands economics and environmental impact - Best-in-class capital efficiency, environmental footprint, oil recovery  Commercialization of the process provides significant opportunities for resou

  24. Slide 24: Appendix

    Slide 24: Appendix

    U.S. OIL SANDS*

  25. Slide 25: Well-Defined Resources

    Slide 25: Well-Defined Resources

    WELL-DEFINED RESOURCES  184 core holes provide strong well control - Up to 2.5-acre spacing, >4,400 assays  Multiple beds; combined pay thickness up to 100 feet, average overburden only 25 feet  Ore grade range of 5 – 15 wt% - Average 10 wt% in planned pits  Significant resource beyond Phase I a

  26. Slide 26: PR Spring Project Aerial View

    Slide 26: PR Spring Project Aerial View

    PR SPRING PROJECT AERIAL VIEW Test pit Plant site USO#5 water well PW-1 water well New Seep Ridge Secondary Hwy Gas pipeline compressor station Drill camp site 26

  27. Slide 27: Plant Site Aerial View

    Slide 27: Plant Site Aerial View

    PLANT SITE AERIAL VIEW 27

  28. Slide 28: Plant Site Layout

    Slide 28: Plant Site Layout

    PLANT SITE LAYOUT Mine maintenance Admin / control warehouse Ore stockpile room building radial stacker Finished Process water tanks Scraper dump product oil tanks Rotary mixer Solvent recovery distillation unit Turbine Feed hopper Ore stockpiles generators Main processing units Screening crusher un

  29. Slide 29: Plant Engineering Model

    Slide 29: Plant Engineering Model

    PLANT ENGINEERING MODEL 29

  30. Slide 30: Construction Progress

    Slide 30: Construction Progress

    CONSTRUCTION PROGRESS  Plant foundations set, main pipe rack infrastructure installed 30

  31. Slide 31: Oil-Wet Oil Sands Application

    Slide 31: Oil-Wet Oil Sands Application

    OIL-WET OIL SANDS APPLICATION  Athabasca oil sands are “water-wet” Water-wet Oil Sands - Sand grains enveloped by water, then by oil - Traditional extraction process (the Clark Hot Water Sand Process) uses hot water to remove the oil but hard to Water break oil-water-clay suspensions / emulsions ar

  32. Slide 32: USO's Extraction Process

    Slide 32: USO's Extraction Process

    USO’S EXTRACTION PROCESS Primary Separation Bitumen/Fines/Water Feed Hopper Milled Ore from Mine Water Rotating PSV 1 PSV 2 Ore De-lumper Drum Mixer Stockpile Bulk Secondary Separator Ore Conditioning Separation Make-up Rock Rejection Bitumen Chemical Hot Water & Fines Condensed Solvent Solvent Extr

  33. Slide 33: Pilot Facility

    Slide 33: Pilot Facility

    PILOT FACILITY  24 bpd shop demonstration unit in Grande Prairie, Alberta Bio-solvent Rotating drum Centrifuge & Sand screen & storage tank mixer control panel storage bin Fee hopper & Separation Water & dilute de-lumper vessels bitumen tanks USO continues to lead in technology development and appl

  34. Slide 34: Shop Demonstration Unit Run

    Slide 34: Shop Demonstration Unit Run

    SHOP DEMONSTRATION UNIT RUN Oil sand ore ready to be fed into the feed hopper Oil / water / solvent / solids slurry discharge Separation vessel top from the rotating drum mixer stream Clean dilute bitumen flowing into a holding tank Clean damp sand on the vibrating screen Clean damp sand, no oil pro

  35. Slide 35: TSX-V: USO www.usoilsandsinc.com

    Slide 35: TSX-V: USO www.usoilsandsinc.com

    Cameron M. Todd CEO cameron.todd@usoilsandsinc.com D. Glen Snarr President & CFO glen.snarr@usoilsandsinc.com Suite 1600, 521 – 3rd Avenue SW Calgary, Alberta T2P 3T3 (403) 233-9366 TSX-V: USO www.usoilsandsinc.com

Source: Internet Archive copy of usoilsandsinc.com

More decks from US Oil Sands Inc.