Alacer Gold — Scotiabank Mining Conference 2015
27 slides from Alacer Gold's conference presentation, Dec 2, 2015

Slide 1: Low-Cost Producer With Growth
Low-Cost Producer With Growth Scotiabank Mining Conference 2015 Mark Murchison, Chief Financial Officer December 2, 2015 TSX: ASR / ASX: AQG /1

Slide 2: Cautionary Statements
Cautionary Statements FORWARD-LOOKING STATEMENTS Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking informat

Slide 3: Key Investment Highlights
Key Investment Highlights Vision to become a sustainable, multi-mine producer Continuing to Execute Organic Growth Right team in place Increased oxide production by 210,000ozs beyond 2017, further On track to meet 2015 guidance de-risking the Sulfide Project start-up Over 7.2 million man-hou

Slide 4: Continue to Execute on our Strategy
Continue to Execute on our Strategy Commenced Engaged AFW for Initial Site Announced Sulfide Sulfide Project Earthworks for Strengthened the Project Team Detailed Sulfide Project Board Exceeded 2014 Engineering Production Engaged Air Liquide Expanded Heap Guidance Approval Received for Sulfide Proje

Slide 5: Sustainable, Low-Cost Producer
Sustainable, Low-Cost Producer Corporate / Asset Location Excellent health, safety, environment and community Corporate Head Office relations record Denver, Colorado Turkey Generated over $600M of cash in 5 years of operation Istanbul Turkey Office Kurttepe Kabadüz Ankara Fol-ken 2015 Total Cash Cos

Slide 6: Ongoing Operational Delivery
Ongoing Operational Delivery 70,000 800 $660 $690 $672 60,000 700 All-in Sustaining Costs ($/oz) $598 600 Gold Production (oz) 50,000 500 40,000 Çöpler Non-Controlling Interest (ozs) 1.88 400 Çöpler Attributable (ozs) 1 1.75 30,000 1.37 All-in Sustaining Costs ($/oz) 2 0.84 300 Oxide Head Grade (g/t

Slide 7: Strong Financial Position
Strong Financial Position $369M in Cash No Debt Undrawn $250M Credit Facility 7-year term Interest rate of LIBOR + 2.5% to 2.95% No mandatory hedging Third Incentive Certificate Secured Includes tax incentives providing significant cash tax credits Certificate has a 6-year duration to Octo

Slide 8: Organic Growth Underway
Organic Growth Underway Çöpler’s Gold Production 100% (000 oz) 319 300 294 250 190-210* 200 171 173 150 100 50 0 2015 2016 2017 2018 2019 Increased oxide production in years 2015-2019 generates significant additional free cash flow during construction, commissioning and ramp up of Sulfide Project

Slide 9: Sulfide Project On Track
Sulfide Project On Track Project Schedule 2014 2015 2016 2017 2018 Çöpler Sulfide DFS – Announced June 2014 Çöpler Sulfides DFS 43-101 Technical Report issued July 2014 Build Project Team Build Project Team: Sulfide Team announced January 2015 Permitting Supplemental Environmental Impact Assessm

Slide 10: Çöpler District and Regional Exploration
Çöpler District and Regional Exploration Yakuplu E (50%) 7m @ 4.6g/t Au from surface 10m @ 1.0g/t Au from 6m 14m @ 1.1g/t Au from 42m 12m @ 1.2g/t Au from 48m Yakuplu SE (80%) 17m @ 1.7g/t Au from 55m 6m @ 4.7g/t Au from 55m 14m @ 1.6g/t Au from 1m 17m @ 2.7g/t Au from 73m Bayramdere

Slide 11: Dursunbey Project
Dursunbey Project DRD-115 15.9m @ 2.2g/t Au, 59g/t Ag Discovery in western Turkey 58,000m & 500 holes drilled through DRD-086 63.9m @ 1.0g/t Au, 27g/t Ag DRD-083 48.0m @ 1.4 g/t Au, 99g/t Ag DRD-067 September 2015 10.8m @ 4.2g/t Au, 48g/t Ag Notable high grade intercepts DRD-058 DRD-006 14m @

Slide 12: For further information, please contact
For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 12

Slide 13: Appendix
Appendix TSX: ASR / ASX: AQG / 13

Slide 14: Company Structure
Company Structure Capital Structure Corporate Overview Market Cap ~C$740M Shares on Issue 291M 80% 50% 20%1 50% Fully Diluted 294M Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV Turnover ~1.8M shares/day Cash US$369M at September 30, 2015 Çöpler Gold Mine Debt Nil Certain Turkey Turkey Çöpler

Slide 15: Board of Directors
Board of Directors Edward C. Dowling, Jr. Thomas R. Bates, Jr. B.Sc, MS.c, Ph.D Ph.D, M.S.ME., B.S.ME Chairman Non-Executive Director Mr. Bates has been a Director at Alacer Gold since April 17, 2014 and has 35 years’ Mr. Dowling has been a Director at Alacer Gold since February 20, 2008 and experie

Slide 16: Improved 2015 Guidance
Improved 2015 Guidance Çöpler Mine Revised 2015 Previous 2015 Favorable Guidance Guidance Changes Heap-leach gold ounces produced (100%) (‘000’s) 190 to 210 180 to 200 101 Total Cash Costs2 (C2) ($/oz) 450 to 500 525 to 575 751 All-in Sustaining Costs2 (AISC) ($/oz) 700 to 750 775 to 825 751 Çöpler

Slide 17: Çöpler Geology – Plan of Deposit
Çöpler Geology – Plan of Deposit Manganese Pit August Marble 2015 Actual Pit Topography Main Pit West Pits Ultimate Pit Limits TSX: ASR / ASX: AQG / 17

Slide 18: Life-of-Mine Production Profile
Life-of-Mine Production Profile Çöpler Life-of-Mine Production Profile (100% Basis)1 350 319 294 300 276 269 257 Gold Production (000 oz) 241 240 238 250 190- * 210 203 191 193 194 200 177 178 171 173 174 157 159 159 154 150 152 150 136 105 104 104 104 103 102 106 103 106 107 107 106 106 103 103 104

Slide 19: Çöpler Heap Leach Pad Expanded to 58Mt
Çöpler Heap Leach Pad Expanded to 58Mt Heap Leach Pad Phase 4 (“HLP4”) was previously designed for ultimate pad capacity of 49 million tonnes Design change to HLP4 in December 2014 increased pad capacity to 58 million tonnes, extending oxide production through 2025 Current mine plan does not f

Slide 20: Sulfide Project Demonstrates Robust Economics
Sulfide Project Demonstrates Robust Economics LOM Key Metrics As of January 1, 20151 (100%) Oxide - HL Sulfide - POX Total Ore Processed Kt 25,061 40,166 Au Grade g/t 1.24 2.57 LOM Au Recovery % 72% 93% Operating Parameters Total Au Production koz 8142 3,109 Operating Costs $/t $35.46 Total Cash Cos

Slide 21: Base Case Financial Metrics
Base Case Financial Metrics After Tax Financial Metrics Base Case 43-101 Case (as of January 1, 2015) (Oxide (Heap Leach + Incremental Only) POX) B–A A B LOM cash flow (millions) $323 $1,727 $1,404 NPV at 5% (millions) $310 $971 $661 IRR % N/A N/A 18.9% Payback from start of sulfide Years N/A 1.9 go

Slide 22: Sulfide Project - Sensitivities
Sulfide Project - Sensitivities Gold Price Gold Price Base Case Gold Price Gold Price (as of January 1, 2015) $1,100/oz $1,200/oz $1,250/oz $1,300/oz $1,400/oz After-tax Total cash flows $ millions $1,163 $1,539 $1,727 $1,912 $2,219 Total NPV at 5% $ millions $615 $852 $971 $1,089 $1,301 Payback fro

Slide 23: Overview of Sulfide Processing Facility
Overview of Sulfide Processing Facility Proven technology Proven technology used for 38% of global gold production Autoclave circuit comprised of seven individual pressure vessels Temperature of 220o C (430o F), Pressure of 2,900 kPag (420 psi) Sulfur grade averages 4.2%, providing the heat

Slide 24: Çöpler Mineral Resource
Çöpler Mineral Resource Mineral Resources for the Ҫӧpler Deposit (As of December 31, 2014) Gold Cut-off Grade Material Resources Category Tonnes Au Ag Cu Contained Au (g/t) Type Material (x1000) (g/t) (g/t) (%) (oz x 1000) Measured - - - - - Indicated 37,097 1.11 2.91 0.15 1,319 Variable Oxide Stock

Slide 25: Çöpler Mineral Reserve
Çöpler Mineral Reserve Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2014) Tonnes Ag Cu Contained Recoverable Mineral Reserves Category Material Au (g/t) (x1000) (g/t) (%) Au Ounces Au Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 25,002 1.24 3.38 0.13 994,000 716,

Slide 26: Exceptional Exploration Potential
Exceptional Exploration Potential Leveraging our expertise, assets and strategic advantage in Turkey 18 years in Turkey gives Alacer early-mover advantage Tethyan Belt is historically under-explored and has excellent mineral potential TSX: ASR / ASX: AQG / 26

Slide 27: Dursunbey Project
Dursunbey Project Cross Section L450 NE – Looking NE DRRC-002 28m @ 0.5g/t Au, 0.6% Cu, 1.9% Zn DRD-043 2.6m @ 3g/t Au, 41g/t Ag DRD-081 DRD-080 DRD-060 5m @ 1.2g/t Au, 20.1m @ 1.4g/t Au, 20.4m @ 0.5g/t Au, 48g/t Ag, 1.4% 49g/t Ag, 0.7% Cu, 0.7% Cu, 1.5% Zn Cu, 0.6% Pb, 0.7% Pb, 3.5% Zn 3.9% Zn DRD-
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017