Talisker Resources Ltd. · TSX:TSK
Talisker Resources — Investor Presentation (May 2024)
23 slides from Talisker Resources's investor presentation, May 2024
Slide 1: High-Grade Gold Production Corporate Presentation
TSX : TSK OTCQX : TSKFF High-Grade Gold Production Corporate Presentation May 2024 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 1
Slide 2: Forward-Looking Statements
Forward-Looking Statements Certain statements in this presentation constitute forward-looking information, which reflect the expectations of management Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance. The use of any of the words “could”, “
Slide 3: Gold Production Imminent
Key Points Access & Strong Infrastructure Leadership Highway access to Over 50Moz Vancouver and Discovered - Toll Milling Experienced Board Facilities Growing Permitted Resource Base and Advisors 2 Fully permitted 1.7Moz at 6.4 g/t resource stage Strongly Au at the Bralorne assets Gold Project* Capi
Slide 4: Located in the Heart of BC Mining
Located in the Heart of BC Mining ▪ Highway Access ▪ Connected to Grid Power ▪ Multiple Toll Milling Facilities 4 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 4
Slide 5: Rapid Pathway to High Margin Gold in 2024
Funded to Fully Permitted Key Indigenous Extensive High- Production for Mining Agreements In Grade Resource place + clear resource expansion Rapid Pathway to High Margin Gold in 2024 Offsite Limited 100koz/y Self Funding Processing = Development to production Growth Low capex access ore = target Str
Slide 6: 2024 Resource Conversion Program Strong Grade Confirmation
2024 Resource Conversion Program ▪ 129.99 g/t Au over 2.00 Metres ▪ 97.40 g/t Au over 2.00m within 38.17 g/t Au over 5.20m ▪ 86.50 g/t Au over 1.50 m within 14.31 g/t Au over 9.55m ▪ 80.68 g/t Au over 2.20m within 28.58 g/t Au over 6.35m ▪ 40.82 g/t Au over 2.60m within 8.54 g/t Au over 13.45m ▪ 37.
Slide 7: Ore Processing Agreements
Ore Processing Agreements ▪ Signed with New Gold to process 350,000t of material at New Afton Mill ▪ Signed with Nicola Mining to process 6,300t of stockpile at Craigmont Mill ▪ Multiple agreement gives long-term optionality and contingency 7 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 7
Slide 8: Mine Plan Unlocking Future High-Grade Production
Bralorne Gold Mines Mine Plan Mustang Mine 3 Year Development Plan 1105 ACCESS BRALORNE WEST RAMP BRALORNE WEST RAMP TO 1150 1120 LEVEL MUSTANG MINE PORTAL 1105 LEVEL 1090 LEVEL 1075 LEVEL 1060 LEVEL RAMP TO 980 ALHAMBRA VEIN 980 PORTAL BK-9870 VEIN Legend BK VEIN Year 1 Mine Plan Year 2 Mine Plan Y
Slide 9: Bralorne - BC's Iconic Gold Camp
Bralorne - BC’s Iconic Gold Camp ▪ Over 40 years of production (1929-1971)- 4.2Moz @ 17.7g/t ▪ 2,300oz/vertical metre average ▪ Orogenic veins, structural continuity defined for 2.5 km along strike and 1.9 km depth ▪ Ore shoot continuity demonstrated for up to 1.5 km ▪ High-grade vein core surrounde
Slide 10: On Track for Near Term Success
Milestones and Upcoming Major Catalysts 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 ✓ Resource Conversion Drilling ✓ Engineering Studies ✓ Results from 15,000m ✓ Updated Mine Plan Drill Program Inaugural Resource ✓ Portal Construction ✓ Ore Sale Agreement ✓ January 2023 Development Funding ✓ Decline Construction ✓
Slide 11: Value Proposition
Value Proposition Growing Production Profile Pathway to 100koz/y production in 4 years Analyst Coverage Target Price**** Large Exploration Upside** $2.00 5Moz+ upside based on historic drift assays and drilling + Strong pipeline of Greenfields Projects $1.25 Strong High-Grade Resource Base*** $2.00
Slide 12: Share Structure and Capitalization
Share Structure and Capitalization Strong Institutional Shareholders Capital Structure (April 30th, 2024) Common Shares Outstanding 89,198,377 Warrants1 11,504,733 Options + RSUs 1,463,335 Fully Diluted Shares Outstanding 102,166,445 Market Capitalization (May 7th) ~$50 million (1) 5,679,600 of the
Slide 13: Clear Extensive Upside
Bralorne Gold Mines Clear Extensive Upside 2023 Mineral Resource and Undrilled Potential Mustang Mine Bralorne Pioneer Surface Legend Stope Optimized Resource (2023) Exploration Targets Existing Underground Infrastructure Undrilled potential UNDRILLED POTENTIAL constrained by drift assays Mustang Mi
Slide 14: Bralorne District-Scale Upside
Bralorne District-Scale Upside ▪ 7 historical mines, 47 known mineral occurrences ▪ 33 km belt amalgamated by Talisker capturing mineralization associated with major suture zone ▪ Historic Resource 186Koz @ 9.1 g/t Au at Congress from surface to 200m * ▪ BRX first-pass drilling results up to 329 g/t
Slide 15: Ladner Tailings JV
Ladner Tailings JV ▪ Signed LOI with Regeneration Enterprises to form JV to process tailings ▪ Regeneration to fund, Talisker to retain equipment and facilities ▪ Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU ▪ R
Slide 16: Ladner Gold Project
Ladner Gold Project ▪ 5 Historical Mines – 24 Known Gold Occurrences ▪ Compliant 691,540oz Inferred Gold Resource* ▪ Major Mines Permit (M-138) in place ▪ 144km2 contiguous land package – ~28kms x 5kms ▪ Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) ▪ Extensiv
Slide 17: Corporate Head Office
TSX : TSK OTCQX : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 1T1 Terry Harbort, President and CEO +1(416) 357-0227 terry.harbort@taliskerresources.com Matt Filgate, VP , Corporate and Strategic Development +1(778) 679-3579 matt.filgat
Slide 18: Endnotes
Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified p
Slide 19: Endnotes – continued
Endnotes – continued • High grade capping, supported by statistical analysis, was applied to composited data inside the high-grade quartz veins for Pioneer (1.4 m) at 100 g/t Au, Bralorne (1.4 m) at 100 g/t Au, Charlotte (1.0 m) at 31 g/t Au and King (1.2 m) at 110 g/t Au for the drill hole samples
Slide 20: Corporate Leadership
Corporate Leadership Management Terry Harbort – CEO, President, Matt Filgate –VP, Corporate and Leonardo de Souza – QP VP, Director Strategic Development Exploration and Resource Development ▪ PhD in Structural Geology and Tectonics. ▪ Matt is Regional Project Geologist for Talisker ▪ 35 years exper
Slide 21: Corporate Leadership
Corporate Leadership Non Executive Directors Morris Prychidny (1)(2) Christy Smith (2)(3) Eric Tremblay (2*)(3*) Chairman ▪ 25 years of proven expertise working ▪ BSc. in mining engineering and mineral with natural resource companies and ▪ Chartered Accountant with 35+ years indigenous communities p
Slide 22: Bralorne Vein Array
Excellent mineability due to Parallel vein sets provide high-grade continuity, vein Bralorne Vein Array potential for numerous adjacent mining fronts structural continuity, high dip angle Cross Section (415,450 mE) Plan View Many veins defined to near surface Excellent structural continuity down dip
Slide 23: Bralorne Inaugural Mineral Resource Estimate (MRE)
Bralorne Inaugural Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) King Indicated Long Hole > 2.65 111,300 8.61 30,800 Cut and Fill > 3.10 5,900 13.45 2,600 Inferred Long Hole > 2.65 1,598,400 5.76 296,200 Cut and Fill >
Talisker Resources — Investor Presentation (May 2024) on 6ix