Hokkaido Electric Power Company,Incorporated — FY2009 Earnings Presentation
40 slides from Hokkaido Electric Power Company,Incorporated's earnings presentation, 2009
Slide 1: 1
1
Slide 2: CTA.
CTA.
Slide 3: Cth
Cth
Slide 4: 4
4
Slide 5: inemcereres.
inemcereres. leCTA a
Slide 6: 6
6
Slide 7: 7
7
Slide 8: – – – –
– – – – 8
Slide 9: CTA.
CTA.
Slide 10: – – “ ”
– – “ ” 10
Slide 11: CTA
CTA 11
Slide 12: CTA.
CTA. 12
Slide 13: CTA.
CTA. 13
Slide 14: CTA.
CTA. 14
Slide 15: CTA.
CTA. 15
Slide 16: CTA.
CTA. 16
Slide 17: 17
17
Slide 18: CTA.
CTA. 18
Slide 19: 19
19
Slide 20: Cth
Cth 20
Slide 21: CTA
CTA 21
Slide 22: Wind and solar power interconnection and introduction plans
“ ” The interconnected capacity is 260,000kW at present. We are seeking application, being planned for the future, for 50,000kW with another 50,000kW on condition that decoupling will be performed if the possibility of adverse effects on the HEPCO system arises. Electricity from small-scale wind pow
Slide 23: Hydropower, photovoltaic and wind power generation business
’ Hydropower generation business and commissioned business of maintenance and management of hydropower generation facilities, etc. Sales of electric power generated by photovoltaic and wind power generation Commissioned business relating to photovoltaic and wind power generation, including consultat
Slide 24: “ ” ’
“ ” ’ 24
Slide 25: Electricity demand and supply forecast
(Note) 1. After publication of the supply plan in March, figures for FY2009 has been replaced to actual results. 2. Peak demand is 3-day average value at transmission end in December. 3. Figures in parentheses are the numerals after adjustment for temperature and other factors. Meteorological and in
Slide 26: Power generation facility mix and electricity generated
Note 1. Purchased power is included. 2. Electricity generated from oil for FY2014 and 2019 include electricity generated from natural gas (scheduled to be introduced as a part of fuels for power generation at the Tomakomai Power Plant Unit 1 from December 2009). 3. Due to instability of power supply
Slide 27: CTA.
CTA. 27
Slide 28: (Note) Total amount may not agree due to rounding off. (Note) Classification has been
(Note) Total amount may not agree due to rounding off. (Note) Classification has been changed after FY2007 Figures of FY2010 and 2011 are planned value. 28
Slide 29: CTA.
CTA. 29
Slide 30: – – – –
– – – – 30
Slide 31: – – – – –
– – – – – 31
Slide 32: – – – – –
– – – – – 32
Slide 33: – – – – – “ ” – –
– – – – – “ ” – – 33
Slide 34: CTA.
CTA. 34
Slide 35: – – – – – – –
– – – – – – – 35
Slide 36: – – – ’
– – – ’ 36
Slide 37: Fuel cost adjustment system and electricity rates
(former system) (new system) (new system) (Average fuel price Standard Fuel Price <31,100yen>) Standard unit price* 0.161yen/kWh 1,000 Within unadjusted band ( 5 *Standard Unit Price: Fuel cost adjusted unit price when an average fuel price has fluctuated by 1,000 yen/kl. The reduction of fuel cost
Slide 38: “ ” “ ” “ ”
“ ” “ ” “ ” 38
Slide 39: “ ”
“ ” 39
Slide 40
Source: Internet Archive copy of hepco.co.jp
More decks from Hokkaido Electric Power Company,Incorporated