Slide 1: Half Year 2016 Update
Half Year 2016 Update July 2016 Rod Antal, President & Chief Executive Officer TSX: ASR / ASX: AQG / 1

Slide 2: Cautionary Statements
Cautionary Statements Forward-looking information includes statements concerning, among other things, preliminary cost reporting in this presentation, production, cost and capital expenditure guidance; ability to expand the current heap leach pad, development plans for processing sulfide ore at Çöpl

Slide 3: H1 2016 Highlights
H1 2016 Highlights Strategic Operational Financial Board approves full construction Produced 61,973 gold Cash of $311M at June 30, of the Sulfide Project ounces as per plan with 2016 Land Use Permits for Sulfide production expected to Operating cash flows of Project and Heap Leach Pad incr

Slide 4: Çöpler Sulfide Expansion Project Update
Çöpler Sulfide Expansion Project Update Bulk earthworks for process plant complete and first concrete poured $204M of capital commitments in place $71M of the $744M pre-production capital spent through Q2 80% of Total Capital Under Commercial Agreement by the End of 2016 TSX: ASR / ASX: AQG /

Slide 5: Sulfide Project Advancing
Sulfide Project Advancing Construction approved - a huge step forward Secures gold production for the long term Adds substantial value for all stakeholders Fully funded Project is defined Further de-risked Significant value enhancements achieved Project capex clearly defined at $744M, wi

Slide 6: Sulfide Project Capital Costs
Sulfide Project Capital Costs Capital Cost Summary Project Area US$ millions (100%1) Process Plant 270 Process Plant Utilities & Services 74 Tailings Storage Facility 31 Support Infrastructure & Temporary Facilities 101 Engineering, Procurement & Construction Management 94 Start-up & Commissioning 1

Slide 7: Substantial Growth with Significant Margins
Substantial Growth with Significant Margins 10 Year Production Profile (100% Basis1) 400 346 350 322 287 282 289 300 Production (000 oz) 250 150- 272 200 179 170 273 160 153 143 253 150 267 289 97 100 143 160 153 50 81 74 49 34 0 15 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Oxide Sulfide T

Slide 8: Çöpler District – Potential for Rapid Development
Çöpler District – Potential for Rapid Development Shallow, oxide targets with favorable metallurgy identified within 5km - 7km of Çöpler Mine with potential to add oxide production within the next two years from the existing Çöpler infrastructure: Çakmaktepe North Çakmaktepe East Çakmaktepe

Slide 9: Çakmaktepe North Prospect
Çakmaktepe North Prospect Çakmaktepe North is the priority target in the Çöpler District with potential to add oxide production within the next two years Gossan hosted mineralization occurring along ophiolite, metasediment, diorite and limestone contacts Domain is over 40m wide and potentially

Slide 10: Dursunbey Project
Dursunbey Project Discovery in western Turkey Metallurgical work completed Finalizing technical review Exercised clawback to 50% Dursunbey update delivered in Q3 2016 For additional information, please see press release dated February 24, 2014 entitled “Alacer Announces Results of Explorat

Slide 11: Alacer Gold – Strong Investment Case
Alacer Gold – Strong Investment Case Sustainable, Low-Cost Producer Strong Financial Position Organic Growth Well Positioned to Capitalize on Exploration Success Continuing to Execute Sulfide Project – Under Construction TSX: ASR / ASX: AQG / 11

Slide 12: Contact
Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 12

Slide 13: Appendix
Appendix TSX: ASR / ASX: AQG / 13

Slide 14: Company Snapshot
Company Snapshot Simple Capital Structure Corporate / Asset Location Market Cap C$1B Shares on issue 292M Corporate Head Office Denver, Colorado Turkey Fully Diluted 296M Turnover 1.5M shares/day Project Office Turkey Office Cash US$311M at 6/30/16 Debt Nil Finance Facility $350M1 1 Advances under t

Slide 15: Corporate Structure
Corporate Structure 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV Çöpler Gold Mine Dursunbey Project Certain Turkey Çöpler District Licenses Regional Exploration 5 Projects Turkey 3 Projects Certain Çöpler Regional District Licenses Exploration 6 Projects 9 Projects Strong

Slide 16: Board of Directors
Board of Directors Edward C. Dowling, Jr. Thomas R. Bates, Jr. B.Sc, MS.c, Ph.D Ph.D, M.S.ME., B.S.ME Chairman Non-Executive Director Mr. Bates has been a Director at Alacer Gold since April 17, 2014 and has 40 years’ Mr. Dowling has been a Director at Alacer Gold since February 20, 2008 and experie

Slide 17: Updated 2016 Guidance
Updated 2016 Guidance Çöpler Mine 2016 Guidance Heap-leach gold ounces produced1 (100%) (ʹ000’s) 150 to 170 Total Cash Costs (C2)2 ($/oz) 575 to 625 All-in Sustaining Costs2 ($/oz) 780 to 830 All-in Costs1 Including Sulfide Growth ($/oz) 2,200 to 2,700 Capital sustaining expenditure (100%) (millions

Slide 18: Sulfide Project – Value Enhancements and Further De-Risking
Sulfide Project – Value Enhancements and Further De-Risking Value Enhancements Increased sulfide reserves Design improvements Twin horizontal autoclaves Increased recoveries Increased NPV to Further Project De-Risking $728 million Engineering significantly advanced Procurement well progr

Slide 19: Value Enhancements
Value Enhancements Increased sulfide reserves Grade improved 7% to 2.8 g/t Increased recoverable ounces by 245,000 life-of-mine Twin horizontal autoclave design Improved operating flexibility and availability Increases throughput to 2.2Mtpa by end of 2021 Industry standard configuratio

Slide 20: Engineering Significantly Advanced
Engineering Significantly Advanced Process flowsheet locked down Firm quantities and quotes for a large portion of Project cost base 3D model of plant developed Quantities defined – equipment, piping, cabling, concrete, steel, etc. Installation manpower requirements defined Tailings Stor

Slide 21: Sources and Uses
Sources and Uses Sources & Uses (100% Basis1 - US$M) May 1, 2016 – September 30, 2018 Sources Cash on Hand as of April 30, 2016 335 Free Cash Flow from Operations @ $1,250 Gold Price 140 Bank Debt2 350 JV Partner Net Contributions 35 TOTAL SOURCES 860 Uses Sulfide Project Capex3 697 Financing Costs

Slide 22: Attractive Financial Metrics
Attractive Financial Metrics Total LoM Financial Metrics After Tax – 100% Basis1, 2 Oxide Only Incremental (Oxide + Sulfide) (as of January 1, 2016) A B–A B LoM cumulative cash flow (millions) $94 $1,577 $1,483 NPV at 5% (millions) $94 $822 $728 IRR % N/A 23.6 19.2 Payback from start of sulfide Au p

Slide 23: Life-of-Mine Production Profile
Life-of-Mine Production Profile Jan 2016 July 2018 to 2024 to to Jun Dec 2023 2037 LoM Physicalsi 2018 First 5.5 Years Remainder Total Oxides of Sulfides of LoMii Only Mining Oxide Ore Mt 11.3 6.6 0.0 18.0 Sulfide Oreiii Mt 7.0 27.9 0.0 34.9 Waste Mt 70.0 154.7 0.0 224.8 Total Tonnes Mined Mt 88.4 1

Slide 24: Physicals - Life-of-Mine Production Profile
Physicals - Life-of-Mine Production Profile LoM Production Profile (100% Basis1) 400 346 350 322 287 282 289 300 Production (000 oz) 250 150- 272 200 170 179 273 160 153 156 143 149 148 143 151 152 149 253 139 139 150 267 289 120 129 97 100 67 143 160 153 156 149 148 143 151 152 149 139 120 139 129

Slide 25: Capital Expenditure
Capital Expenditure Capital Cost Summary Capital Cost Schedule Project Area US$M US$ Millions 2015 2016 2017 2018 Total (100%1) Process Plant 270 Capital 23 265 374 82 744 Process Plant Utilities & Services 74 Expenditures Tailings Storage Facility 31 Support Infrastructure & Temporary Facilities 10

Slide 26: Operating Costs
Operating Costs LoM Cash Operating Costs1 Summary POX Processing Costs by Component Unit Cost Mining Per tonne mined $1.50 Laboratory Rehandle Per tonne rehandled $1.12 $0.89/t Other Fuel $0.39/t Heap Leach Processing Per tonne heap leach processed $8.09 $0.92/t 3% Labour 1% POX Processing Per tonne

Slide 27: Sulfide Project - Sensitivities
Sulfide Project - Sensitivities Gold Price Financials After Tax 1,100 1,150 1,200 1,250 1,300 1,350 1,400 Incremental LoM Cash Flow US$M $959 $1,133 $1,308 $1,483 $1,626 $1,799 $1,971 Incremental NPV at 5.0% US$M $406 $513 $620 $728 $815 $921 $1,027 Incremental IRR % 13.5% 15.4% 17.4% 19.2% 20.7% 22

Slide 28: Çöpler Mineral Resources
Çöpler Mineral Resources Mineral Resources Statement for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Material Tonnes Au Contained Au Gold Cut-off Grade (g/t) Resources Category Material Ag (g/t) Cu (%) Type (x1000) (g/t) Ounces Measured - - - - - Indicated 24,959 1.04 3.19 0.13 836,000

Slide 29: Çöpler Mineral Reserves Increased
Çöpler Mineral Reserves Increased Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Mineral Reserves Contained Au Recoverable Au Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Category Material Ounces Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 17,836 1.1

Slide 30: Çöpler Geology – Plan of Deposit
Çöpler Geology – Plan of Deposit TSX: ASR / ASX: AQG / 30

Slide 31: Exceptional Exploration Potential
Exceptional Exploration Potential 18 years in Turkey gives Alacer early-mover advantage Tethyan Belt is historically under-explored and has excellent mineral potential TSX: ASR / ASX: AQG / 31
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017