Alacer Gold — BMO 2016 Global Metals & Mining Conference
19 slides from Alacer Gold's conference presentation, Mar 1, 2016

Slide 1: Sustainable Producer With Growth
Sustainable Producer With Growth BMO 2016 Global Metals & Mining Conference Rod Antal, President & Chief Executive Officer March 1, 2016 TSX: ASR / ASX: AQG / 1

Slide 2: Cautionary Statements
Cautionary Statements FORWARD-LOOKING STATEMENTS Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking informat

Slide 3: Alacer Gold – Strong Investment Case
Alacer Gold – Strong Investment Case Sustainable, Low-Cost Producer Strong Financial Position Organic Growth Well Positioned to Capitalize on Exploration Success Continuing to Execute Vision To Become A Sustainable, Multi-Mine Producer TSX: ASR / ASX: AQG / 3

Slide 4: Company Snapshot
Company Snapshot Simple Capital Structure Corporate / Asset Location Market Cap C$780M Corporate Head Office Shares on issue 292M Denver, Colorado Turkey Fully Diluted 296M Turnover 1.3M shares/day Project Office Turkey Office Cash US$361M at 12/31/15 Debt Nil Finance Facility $250M (undrawn) Strong

Slide 5: 2015 Accomplishments
2015 Accomplishments Operational Financial Strategic At year end Çöpler Mine Cash of $361M at year end Increased Çöpler’s reserves and achieved 7.9M hours worked Attributable net profit of LOM production by >800,000 ozs without a lost-time injury $47M or $0.16 per share Rapid development p

Slide 6: 2016 Guidance
2016 Guidance Çöpler Mine 2016 Guidance Heap-leach gold ounces produced (100%) (ʹ000’s) 150 to 170 Total Cash Costs (C2)1 ($/oz) 575 to 625 All-in Sustaining Costs1 ($/oz) 780 to 830 Capital sustaining expenditure (100%) (millions) $13 Çöpler sulfide capital expenditure (100%) 2 (millions) $315 Expl

Slide 7: Çöpler District – Potential for Rapid Development
Çöpler District – Potential for Rapid Development Shallow, oxide targets with favorable metallurgy identified within 5km - 7km of Çöpler Mine with potential for rapid development: Yakuplu North Yakuplu East Yakuplu Southeast Bayramdere Alacer Exploration Exploration 2016 Exploration Guidan

Slide 8: Yakuplu North Prospect Plan
Yakuplu North Prospect Plan Yakuplu North is a high priority target in the Çöpler District Gossan hosted mineralization occurring along ophiolite and limestone contacts Domain is over 40m wide and potentially mineralized over 1km Work to date identified high-grade gold over 250m strike lengt

Slide 9: Sulfide Project Update
Sulfide Project Update Project team in place Consolidated Project team in Istanbul with Amec Foster Wheeler Procurement of long-lead items commenced Decision made to install twin horizontal autoclaves Proceeding on an Engineering, Procurement, Construction Management basis (EPCM) Detaile

Slide 10: Positioned to Create Shareholder Value - Short, Medium & Long Term
Positioned to Create Shareholder Value - Short, Medium & Long Term Sustainable, Low-Cost Producer 1Moz produced at an average cash cost of $401/oz 2015 Total Cash Costs1 (C2) of $482/oz, generating significant operating cash flow Strong Financial Position $361M in cash and no debt $250M undr

Slide 11: Contact
Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 11

Slide 12: Appendix
Appendix TSX: ASR / ASX: AQG / 12

Slide 13: Corporate Structure
Corporate Structure 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV Çöpler Gold Mine Dursunbey Project Certain Turkey Çöpler District Licenses Regional Exploration 5 Projects Turkey 3 Projects Certain Çöpler Regional District Licenses Exploration 6 Projects 9 Projects Strong

Slide 14: Board of Directors
Board of Directors Edward C. Dowling, Jr. Thomas R. Bates, Jr. B.Sc, MS.c, Ph.D Ph.D, M.S.ME., B.S.ME Non-Executive Director Chairman Mr. Bates has been a Director at Alacer Gold since April 17, 2014 and has 40 years’ Mr. Dowling has been a Director at Alacer Gold since February 20, 2008 and experie

Slide 15: Çöpler Geology – Plan of Deposit
Çöpler Geology – Plan of Deposit Manganese Pit Marble Pit Main Pit West Pits TSX: ASR / ASX: AQG / 15

Slide 16: Çöpler Mineral Resources
Çöpler Mineral Resources Mineral Resources for the Ҫӧpler Deposit (As of December 31, 2015) Gold Cut-off Material Reserve Category Tonnes Contained Au Au (g/t) Ag (g/t) Cu (%) Grade (g/t) Type Material (x1000) (oz x 1000) Measured - - - - - Indicated 29,862 1.06 3.09 0.16 1,013 Variable Oxide Stockp

Slide 17: Çöpler Mineral Reserves
Çöpler Mineral Reserves Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2015) Contained Au Recoverable Au Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Ounces Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 18,062 1.19 3.83 0.14 693,000 499,487 Prob

Slide 18: Exceptional Exploration Potential
Exceptional Exploration Potential 18 years in Turkey gives Alacer early-mover advantage Tethyan Belt is historically under-explored and has excellent mineral potential TSX: ASR / ASX: AQG / 18

Slide 19: Dursunbey Project
Dursunbey Project Cross Section L450 NE – Looking NE DRRC-002 28m @ 0.5g/t Au, 0.6% Cu, 1.9% Zn DRD-043 2.6m @ 3g/t Au, 41g/t Ag DRD-081 DRD-080 DRD-060 5m @ 1.2g/t Au, 20.1m @ 1.4g/t Au, 20.4m @ 0.5g/t Au, 48g/t Ag, 1.4% 49g/t Ag, 0.7% Cu, 0.7% Cu, 1.5% Zn Cu, 0.6% Pb, 0.7% Pb, 3.5% Zn 3.9% Zn DRD-
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017