Talisker Resources — Investor Presentation (May 2025)

24 slides from Talisker Resources's investor presentation, May 2025

  1. Slide 1: High-Grade Gold Production Corporate Presentation

    TSX : TSK OTCQX : TSKFF High-Grade Gold Production Corporate Presentation May 2025 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 1

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Certain statements in this presentation constitute forward-looking information, which reflect the expectations of management Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance. The use of any of the words “could”, “

  3. Slide 3: Located in the Heart of BC Mining

    Located in the Heart of BC Mining § Highway Access § Connected to Grid Power § Multiple Toll Milling Facilities § Significant Local Workforce § Moderate Southern Climate 3 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 3

  4. Slide 4: Rapid Pathway to High Margin Gold in 2025

    Funded to Fully Permitted Key Indigenous 1.7Moz High- Production for Mining Agreements In Grade Resource place + clear resource expansion Rapid Pathway to High Margin Gold in 2025 Offsite Limited 100koz/y Self Funding Processing = Development to production Growth Low capex access ore = target Strate

  5. Slide 5: Bralorne - BC's Iconic Gold Camp

    Bralorne - BC’s Iconic Gold Camp § Over 40 years of production (1929-1971)- 4.2Moz @ 17.7g/t § 2,300oz/vertical metre average § Orogenic veins, structural continuity defined for 2.5 km along strike and 1.9 km depth § Ore shoot continuity demonstrated for up to 1.5 km § High-grade vein core surrounde

  6. Slide 6: Discovery to Production in 5 years

    Discovery to Production in 5 years 2025 Work Completed 2020-2024 Q1 Q2 Q3 ü 165,000m of Drilling ü Resource Statement ü Mine Plan ü Portal and Decline Development First Production ü Milling and Trucking Agreements Re-establishment of Trucking and Doubling of ü Test Milling of 5,000t Stockpile Servic

  7. Slide 7: Year 1 Production Plan

    Development Completed Year 1 Production Plan Mustang Mine – Orthogonal View 4 active working faces on 1060 and 1075 Levels (East and West) 1,100t of Ore ready to truck TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 7

  8. Slide 8: Mid-Term Production Plan: Bralorne Mine Plan

    Mid-Term Production Bralorne Plan Mine Plan Mustang Mine - Orthogonal View 5 parallel high-grade ore bodies Location of current mining 560m development activities Mustang to Bralorne West Bralorne West 1150 Level 1135 Level 1060 Level 1075 Level Mustang Portal 910 Level 980 Level 840 Level Legend Ex

  9. Slide 9: Mid-Term Production Plan

    Mustang Mine Production Mid-Term Production Plan 80,000 70,000 Mustang Mine – Plan View Bralorne Mine Plan – Plan View 60,000 50,000 Total Tonnage Mined 40,000 Mustang 30,000 20,000 BK-9870 Vein BK Vein 10,000 Alhambra Vein 0 Q1, Q2, Q3, Q4, Q1, Q2, Q3, Q4, Q1, Q2, Q3, Q4, Q1, Q2, Q3, Q4, Q1, Q2, Q3

  10. Slide 10: 2024 Resource Conversion Program

    2024 Resource Conversion Program § 129.99 g/t Au over 2.00 Metres § 97.40 g/t Au over 2.00m within 38.17 g/t Au over 5.20m § 86.50 g/t Au over 1.50 m within 14.31 g/t Au over 9.55m § 80.68 g/t Au over 2.20m within 28.58 g/t Au over 6.35m § 40.82 g/t Au over 2.60m within 8.54 g/t Au over 13.45m § 37.

  11. Slide 11: Clear Extensive Upside

    Clear Extensive Upside Possible 2nd Portal Location King Mustang Bralorne Pioneer Mustang Mine Plan Area Mineralisation known to 2km depth TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 11

  12. Slide 12: Bralorne District-Scale Upside

    Bralorne District-Scale Upside § 7 historical mines, 47 known mineral occurrences § 33 km belt amalgamated by Talisker capturing mineralization associated with major suture zone § Historic Resource 186Koz @ 9.1 g/t Au at Congress from surface to 200m * § BRX first-pass drilling results up to 329 g/t

  13. Slide 13: Value Proposition

    Value Proposition Growing Production Profile Pathway to 100koz/y production in 4 years Analyst Coverage Target Price**** Large Exploration Upside** $2.00 5Moz+ upside based on historic drift assays and drilling + Strong pipeline of Greenfields Projects Strong High-Grade Resource Base*** 1.7Moz defin

  14. Slide 14: Peer Group | Select Gold Companies

    Peer Group | Select Gold Companies Significant re-rate potential for Talisker on a P/NAV basis – Talisker’s Bralorne compares favorably to peers on grade Producers P/NAV, M&I Resource Grade for Primary Asset 1.20x 1.13x Average M&I 12 1.00x 9.77 8.1 gold grade 8.85 10 0.80x 0.78x 0.80x 8 Median 0.41

  15. Slide 15: Share Structure and Capitalization

    Share Structure and Capitalization Strong Institutional Shareholders Capital Structure (May 5th, 2025) Common Shares Outstanding 115,964,294 Warrants1 17,491,663 Options+RSUs 5,853,335 Fully Diluted Shares Outstanding 139,309,292 Market Capitalization (May 5th) ~$58 million (1) 5,679,600 of the outs

  16. Slide 16: Corporate Head Office

    TSX : TSK OTCQX : TSKFF WEB: taliskerresources.com Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 1T1 Terry Harbort, President and CEO +1(416) 357-0227 terry.harbort@taliskerresources.com 16 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 16

  17. Slide 17: Endnotes

    Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified p

  18. Slide 18: Endnotes – continued

    Endnotes – continued • High grade capping, supported by statistical analysis, was applied to composited data inside the high-grade quartz veins for Pioneer (1.4 m) at 100 g/t Au, Bralorne (1.4 m) at 100 g/t Au, Charlotte (1.0 m) at 31 g/t Au and King (1.2 m) at 110 g/t Au for the drill hole samples

  19. Slide 19: Ladner Gold Project

    Ladner Gold Project § 5 Historical Mines – 24 Known Gold Occurrences § Compliant 691,540oz Inferred Gold Resource* § Major Mines Permit (M-138) in place § 144km2 contiguous land package – ~28kms x 5kms § Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) § Extensiv

  20. Slide 20: Ladner Tailings JV

    Ladner Tailings JV § Signed LOI with Regeneration Enterprises to form JV to process tailings § Regeneration to fund, Talisker to retain equipment and facilities § Tailings indicated resource of 445,000t grading @ 1.64 g/t for 24,000oz Au, inferred resource of 93,000t @ at 1.64 g/t for 5,000oz AU § R

  21. Slide 21: Corporate Leadership

    Corporate Leadership Management Andres Tinajero – CFO Leonardo de Souza – QP VP, Terry Harbort – CEO, President, § MBA and Member, Canadian Institute of Exploration and Resource Development Director Chartered Professional Accountants, the § 35 years experience in mineral exploration and 21 § PhD in

  22. Slide 22: Corporate Leadership

    Corporate Leadership Non Executive Directors Morris Prychidny (1)(2) Christy Smith (2)(3) Eric Tremblay (2*)(3*) Chairman § 25 years of proven expertise working § BSc. in mining engineering and mineral with natural resource companies and processing from Laval University, § Chartered Accountant with

  23. Slide 23: Bralorne Vein Array

    Excellent mineability due to Parallel vein sets provide high-grade continuity, vein Bralorne Vein Array potential for numerous adjacent mining fronts structural continuity, high dip angle Cross Section (415,450 mE) Plan View Many veins defined to near surface 2k m Excellent structural continuity dow

  24. Slide 24: Bralorne Inaugural Mineral Resource Estimate (MRE)

    Bralorne Inaugural Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) King Indicated Long Hole > 2.65 111,300 8.61 30,800 Cut and Fill > 3.10 5,900 13.45 2,600 Inferred Long Hole > 2.65 1,598,400 5.76 296,200 Cut and Fill >