US Oil Sands — Investor Presentation (March 2012)
26 slides from US Oil Sands's investor presentation, March 2012

Slide 1: Corporate Presentation
Corporate Presentation March 2012 TSXV: USO

Slide 2: Forward Looking Statements
Forward Looking Statements This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward- looking statements in this presentation include, but are not limited to, st

Slide 3: Advisories - Forward Looking Information
ADVISORIES - Forward Looking Information This presentation contains forward-looking statements and forward looking information within the meaning of applicable Canadian securities laws (collectively “forward-looking statements”). Forward-looking statements in this presentation include, but are not l

Slide 4: US Oil Sands Inc.
US Oil Sands Inc. • US Oil Sands is focused on developing its Utah bitumen resources – Largest commercial oil sand land position in U.S. – 32,005 acres 100% owned Utah mining leases • Company expects to develop 50,000 BPD over next 10 years – PR Spring Project on stream in 2013 on first 5,930 acre b

Slide 5: Corporate Snapshot
Corporate Snapshot • Calgary based oil sands mining company • TSX Venture listed; TSX-V: USO • 251 million shares outstanding • Reverse take over on April 18, 2011 with $12.6 million financing to initiate project execution • Key activities as a private company – resource acquisition, extraction proc

Slide 6: Capitalization – as at December 31, 2011
Capitalization – as at December 31, 2011 • Directors and Management aligned ─ 251,606,329 common shares, D&O 10.3% w/no founders or low ACB shares ─ 295,531,329 fully diluted, D&O 14.8% Common Securities Stock Options Warrants Fully Diluted Shares Issued and Outstanding # 251,606,329 21,925,000 22,0

Slide 7: Why Oil Sands in Utah?
Why Oil Sands in Utah? • Large known resources – Estimated at over 30 billion bbls in place (>50% of oil sands in the US) – Total US conventional oil proved reserves are only 21 billion bbls 1 • Available land – low cost – USO $0.05 per barrel in ground vs. > $1.00 per barrel in Alberta 2 • Low roya

Slide 8: Experienced Leadership
Experienced Leadership Management Team • Experienced leader with over 30 years in oil, gas and oil sand development and operations, most recently as Senior VP Operations, Refining and Marketing with Cameron Todd Connacher Oil and Gas (5 years) Chief Executive Officer • 13 years as executive in US, C

Slide 9: Experienced Leadership
Experienced Leadership Board of Directors Verne Johnson • Chairman of Petromanas Energy Chairman • Director of Gran Tierra Energy and Statoil Canada • President of RFM Capital Corporation and Bluesky Equities Ltd , private investment Douglas Hunter companies Director • Past director of Wellco Energy

Slide 10: Utah’s Prolific Uinta Basin
Utah’s Prolific Uinta Basin 10

Slide 11: Extensive Land and Resource Base
Extensive Land and Resource Base • PR Spring Mining Project Area: ─ Multiple bitumen beds with combined thickness up to 100 feet ─ Average 20 feet overburden, 5% - 14% ore grade by wt. ─ Independent resource assessment by Sproule Associates shows 190 million barrels discovered resource (1) • Signifi

Slide 12: US Oil Sands Extraction Process
US Oil Sands Extraction Process • Adaptation of existing Canadian processes – Addition of proprietary solvent process improves recovery – Process uses low mechanical energy, reduces clay suspensions – No tailings ponds required, reduced capital equipment • USO process uses renewable biodegradable so

Slide 13: Process is Proven and Scalable
Process is Proven and Scalable • Extensive pilot testing is complete – Four prototypes ranging from 24 to 500 bbl/d – Tested both in the field and in the lab – Independent engineering and supplier review • Commercial units are manageable 2000 bbl/d size • Mining process is conventional • Extraction

Slide 14: Project is Shovel Ready
Project is Shovel Ready • Project approved by Utah Division of Oil, Gas and Mining • Conventional mining approach with standard equipment • Clean sand produced and stacked in mined out areas immediately • Rapid reclamation • Close to market • Secure domestic oil reserves for America 14

Slide 15: Production Growth in Phased Development
Production Growth in Phased Development • Rapid build-up in phases ─ Modular construction allows flexible development of various capacities ─ Can be stand-alone, sequential or paired together ─ Units are portable and re-deployable ─ Low capital threshold, payout < 2 years ─ Capital cost per base mod

Slide 16: Markets, Transportation and Netbacks
Markets, Transportation and Netbacks • Primary Market – Salt Lake City Refineries (via truck) – 157,000 bpd capacity • Secondary Market – West Coast Refineries (via rail) – 2.5 million bpd capacity • Transportation – truck and rail in insulated asphalt tankers Netbacks $/bbl $/bbl West Coast WTI Cru

Slide 17: Value of a Resource Barrel in the Ground
Value of a Resource Barrel in the Ground • Oil Sands historical transactions 2006 to 2011 – $24 billion value paid in 27 transactions – Average $1.09 per acquired resource bbl ($0.14 to $2.53/bbl) • EV / bbl of junior and mid-size oil sands companies* – Estimated value of peer group 2P + contingent

Slide 18: Appendices
Appendices US. OIL SANDS

Slide 19: Land Holdings are Extensive
Land Holdings are Extensive 19

Slide 20: Planned 2013 Development Area
Planned 2013 Development Area 20

Slide 21: An Adaptation for Oil Wet Reservoir Rock
An Adaptation for Oil Wet Reservoir Rock • Athabasca oil sands of Canada are “water wet” – Water sticks to the sand grains, bitumen and clay are in between – Clark process uses hot water to remove the oil – Hard to break oil-water-clay emulsions created in extraction process • Most oil sands in the

Slide 22: PR Spring Project Timeline
PR Spring Project Timeline 2010 2011 2012 2013 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Permit PR Spring Mine Operation Shop Demo Unit Testing Program Design Commercial Unit Coring & Detailed Mine Model Order Long Delivery Equipment Fabricate Commercial Unit Plant Site Prep & Unit Set‐up O/B

Slide 23: PR Spring Project Capital Cost
PR Spring Project Capital Cost US Oil Sands US Oil Sands Vs. Athabasca 1 Unit 5 Unit Mining Standalone Phase Non-Integrated Modular Process Unit $23.0 MM $115.0 MM Mine & Pit Dev. and Water Supply 5.4 MM 10.0 MM Total Capital Cost $28.4 MM $125.0 MM $10.9 B Daily Production Capacity (bbl/d) 2,000 10

Slide 24: US Oil Sands Extraction Process
US Oil Sands Extraction Process 2 Bitumen/Fines/Water Feed Hopper 1 Separation Towers Ore De-lumper 3 4 Stockpile Rotating Drum Mixer Make-up Chemical Hot Water Extraction Clean Sand & Water Chemical Bitumen Bitumen 6 Horizontal Belt Filter Polishing Clean Fines Unit & Water Distillation Process Ste

Slide 25: Mining Equipment – Wirtgen Surface Miner
Mining Equipment – Wirtgen Surface Miner Self-propelled/self-loading mining & ore conditioning machine 25

Slide 26: TSXV: USO
Cameron M. Todd Chief Executive Officer cameron.todd@usoilsandsinc.com D. Glen Snarr President & CFO glen.snarr@usoilsandsinc.com (403) 233-9366 www.usoilsandsinc.com TSXV: USO
Source: Internet Archive copy of usoilsandsinc.com
More decks from US Oil Sands Inc.
Investor Presentation (September 2016)33 slides · September 2016
Investor Presentation (December 2015)35 slides · December 2015
Investor Presentation (July 2015)35 slides · July 2015
Investor Presentation (September 2014)30 slides · September 2014
Investor Presentation (September 2013)26 slides · September 2013
Shareholder Meeting (May 2013)22 slides · May 15, 2013