    Half Year 2016 Update September 2016 Rod Antal, President & Chief Executive Officer TSX: ASR / ASX: AQG / 1

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements Forward-looking information includes statements concerning, among other things, preliminary cost reporting in this presentation, production, cost and capital expenditure guidance; ability to expand the current heap leach pad, development plans for processing sulfide ore at Çöpl

  3. Slide 3: H1 2016 Highlights

    Slide 3: H1 2016 Highlights

    H1 2016 Highlights Strategic Operational Financial  Board approves full construction  Produced 61,973 gold  Cash of $311M at June 30, of the Sulfide Project ounces as per plan with 2016  Land Use Permits for Sulfide production expected to  Operating cash flows of Project and Heap Leach Pad incr

  4. Slide 4: Çöpler Sulfide Expansion Project Update

    Slide 4: Çöpler Sulfide Expansion Project Update

    Çöpler Sulfide Expansion Project Update  Bulk earthworks for process plant complete and first concrete poured  $204M of capital commitments in place  $71M of the $744M pre-production capital spent through Q2 80% of Total Capital Under Commercial Agreement by the End of 2016 TSX: ASR / ASX: AQG /

  5. Slide 5: Sulfide Project Advancing

    Slide 5: Sulfide Project Advancing

    Sulfide Project Advancing Construction approved - a huge step forward  Secures gold production for the long term  Adds substantial value for all stakeholders  Fully funded Project is defined  Further de-risked  Significant value enhancements achieved  Project capex clearly defined at $744M, wi

  6. Slide 6: Sulfide Project Construction Progress

    Slide 6: Sulfide Project Construction Progress

    Sulfide Project Construction Progress Acidulation and Pressure Oxidation Area Pressure Oxidation Building CIP Train Tank Foundation TSX: ASR / ASX: AQG / 6

  7. Slide 7: Sulfide Project Capital Costs

    Slide 7: Sulfide Project Capital Costs

    Sulfide Project Capital Costs Capital Cost Summary Project Area US$ millions (100%1) Process Plant 270 Process Plant Utilities & Services 74 Tailings Storage Facility 31 Support Infrastructure & Temporary Facilities 101 Engineering, Procurement & Construction Management 94 Start-up & Commissioning 1

  8. Slide 8: Substantial Growth with Significant Margins

    Slide 8: Substantial Growth with Significant Margins

    Substantial Growth with Significant Margins 10 Year Production Profile (100% Basis1) 400 346 350 322 287 282 289 300 Production (000 oz) 250 150- 272 200 179 170 273 160 153 143 253 150 267 289 97 100 143 160 153 50 81 74 49 34 0 15 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Oxide Sulfide  T

  9. Slide 9: Çöpler District – Potential for Rapid Development

    Slide 9: Çöpler District – Potential for Rapid Development

    Çöpler District – Potential for Rapid Development  Shallow, oxide targets with favorable metallurgy identified within 5km - 7km of Çöpler Mine with potential to add oxide production within the next two years from the existing Çöpler infrastructure:  Çakmaktepe North  Çakmaktepe East  Çakmaktepe

  10. Slide 10: Çakmaktepe North Prospect

    Slide 10: Çakmaktepe North Prospect

    Çakmaktepe North Prospect  Çakmaktepe North is the priority target in the Çöpler District with potential to add oxide production within the next two years  Gossan hosted mineralization occurring along ophiolite, metasediment, diorite and limestone contacts  Domain is over 40m wide and potentially

  11. Slide 11: Çakmaktepe North Prospect NW700

    Slide 11: Çakmaktepe North Prospect NW700

    Çakmaktepe North Prospect NW700 Çakmaktepe North Prospect Section NW700 showing drilling results from January 1, 2016 to May 31, 2016. Interpretation is based on nominal spaced 50m x 40m drilling with section NW700 having been infilled to a spacing of 20m and scissor-hole drilled to validate grade c

  12. Slide 12: Dursunbey Project

    Slide 12: Dursunbey Project

    Dursunbey Project  Discovery in western Turkey  Metallurgical work completed  Finalizing technical review  Exercised clawback to 50%  Dursunbey update delivered in Q3 2016 For additional information, please see press release dated February 24, 2014 entitled “Alacer Announces Results of Explorat

  13. Slide 13: Alacer Gold – Strong Investment Case

    Slide 13: Alacer Gold – Strong Investment Case

    Alacer Gold – Strong Investment Case  Sustainable, Low-Cost Producer  Strong Financial Position  Organic Growth  Well Positioned to Capitalize on Exploration Success  Continuing to Execute Sulfide Project – Under Construction TSX: ASR / ASX: AQG / 13

  14. Slide 14: Contact

    Slide 14: Contact

    Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 14

  15. Slide 15: Appendix

    Slide 15: Appendix

    Appendix TSX: ASR / ASX: AQG / 15

  16. Slide 16: Company Snapshot

    Slide 16: Company Snapshot

    Company Snapshot Simple Capital Structure Corporate / Asset Location Market Cap C$1B Shares on issue 292M Corporate Head Office Denver, Colorado Turkey Fully Diluted 296M Turnover 1.5M shares/day Project Office Turkey Office Cash US$311M at 6/30/16 Debt Nil Finance Facility $350M1 1 Advances under t

  17. Slide 17: Corporate Structure

    Slide 17: Corporate Structure

    Corporate Structure 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV Çöpler Gold Mine Dursunbey Project Certain Turkey  Çöpler District Licenses  Regional Exploration 5 Projects Turkey 3 Projects Certain Çöpler Regional District Licenses Exploration 6 Projects 9 Projects Strong

  18. Slide 18: Board of Directors

    Slide 18: Board of Directors

    Board of Directors Edward C. Dowling, Jr. Thomas R. Bates, Jr. B.Sc, MS.c, Ph.D Ph.D, M.S.ME., B.S.ME Chairman Non-Executive Director Mr. Bates has been a Director at Alacer Gold since April 17, 2014 and has 40 years’ Mr. Dowling has been a Director at Alacer Gold since February 20, 2008 and experie

  19. Slide 19: Updated 2016 Guidance

    Slide 19: Updated 2016 Guidance

    Updated 2016 Guidance Çöpler Mine 2016 Guidance Heap-leach gold ounces produced1 (100%) (ʹ000’s) 150 to 170 Total Cash Costs (C2)2 ($/oz) 575 to 625 All-in Sustaining Costs2 ($/oz) 780 to 830 All-in Costs1 Including Sulfide Growth ($/oz) 2,200 to 2,700 Capital sustaining expenditure (100%) (millions

  20. Slide 20: Increased NPV to $728 million

    Slide 20: Increased NPV to $728 million

    Sulfide Project – Value Enhancements and Further De-Risking Value Enhancements  Increased sulfide reserves  Design improvements  Twin horizontal autoclaves  Increased recoveries Increased NPV to Further Project De-Risking $728 million  Engineering significantly advanced  Procurement well progr

  21. Slide 21: Value Enhancements

    Slide 21: Value Enhancements

    Value Enhancements  Increased sulfide reserves  Grade improved 7% to 2.8 g/t  Increased recoverable ounces by 245,000 life-of-mine  Twin horizontal autoclave design  Improved operating flexibility and availability  Increases throughput to 2.2Mtpa by end of 2021  Industry standard configuratio

  22. Slide 22: Engineering Significantly Advanced

    Slide 22: Engineering Significantly Advanced

    Engineering Significantly Advanced  Process flowsheet locked down  Firm quantities and quotes for a large portion of Project cost base  3D model of plant developed  Quantities defined – equipment, piping, cabling, concrete, steel, etc.  Installation manpower requirements defined  Tailings Stor

  23. Slide 23: Sources and Uses

    Slide 23: Sources and Uses

    Sources and Uses Sources & Uses (100% Basis1 - US$M) May 1, 2016 – September 30, 2018 Sources Cash on Hand as of April 30, 2016 335 Free Cash Flow from Operations @ $1,250 Gold Price 140 Bank Debt2 350 JV Partner Net Contributions 35 TOTAL SOURCES 860 Uses Sulfide Project Capex3 697 Financing Costs

  24. Slide 24: Attractive Financial Metrics

    Slide 24: Attractive Financial Metrics

    Attractive Financial Metrics Total LoM Financial Metrics After Tax – 100% Basis1, 2 Oxide Only Incremental (Oxide + Sulfide) (as of January 1, 2016) A B–A B LoM cumulative cash flow (millions) $94 $1,577 $1,483 NPV at 5% (millions) $94 $822 $728 IRR % N/A 23.6 19.2 Payback from start of sulfide Au p

  25. Slide 25: Life-of-Mine Production Profile

    Slide 25: Life-of-Mine Production Profile

    Life-of-Mine Production Profile Jan 2016 July 2018 to 2024 to to Jun Dec 2023 2037 LoM Physicalsi 2018 First 5.5 Years Remainder Total Oxides of Sulfides of LoMii Only Mining Oxide Ore Mt 11.3 6.6 0.0 18.0 Sulfide Oreiii Mt 7.0 27.9 0.0 34.9 Waste Mt 70.0 154.7 0.0 224.8 Total Tonnes Mined Mt 88.4 1

  26. Slide 26: Physicals - Life-of-Mine Production Profile

    Slide 26: Physicals - Life-of-Mine Production Profile

    Physicals - Life-of-Mine Production Profile LoM Production Profile (100% Basis1) 400 346 350 322 287 282 289 300 Production (000 oz) 250 150- 272 200 170 179 273 160 153 156 143 149 148 143 151 152 149 253 139 139 150 267 289 120 129 97 100 67 143 160 153 156 149 148 143 151 152 149 139 120 139 129

  27. Slide 27: Capital Expenditure

    Slide 27: Capital Expenditure

    Capital Expenditure Capital Cost Summary Capital Cost Schedule Project Area US$M US$ Millions 2015 2016 2017 2018 Total (100%1) Process Plant 270 Capital 23 265 374 82 744 Process Plant Utilities & Services 74 Expenditures Tailings Storage Facility 31 Support Infrastructure & Temporary Facilities 10

  28. Slide 28: Operating Costs

    Slide 28: Operating Costs

    Operating Costs LoM Cash Operating Costs1 Summary POX Processing Costs by Component Unit Cost Mining Per tonne mined $1.50 Laboratory Rehandle Per tonne rehandled $1.12 $0.89/t Other Fuel $0.39/t Heap Leach Processing Per tonne heap leach processed $8.09 $0.92/t 3% Labour 1% POX Processing Per tonne

  29. Slide 29: Sulfide Project - Sensitivities

    Slide 29: Sulfide Project - Sensitivities

    Sulfide Project - Sensitivities Gold Price Financials After Tax 1,100 1,150 1,200 1,250 1,300 1,350 1,400 Incremental LoM Cash Flow US$M $959 $1,133 $1,308 $1,483 $1,626 $1,799 $1,971 Incremental NPV at 5.0% US$M $406 $513 $620 $728 $815 $921 $1,027 Incremental IRR % 13.5% 15.4% 17.4% 19.2% 20.7% 22

  30. Slide 30: Çöpler Mineral Resources

    Slide 30: Çöpler Mineral Resources

    Çöpler Mineral Resources Mineral Resources Statement for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Material Tonnes Au Contained Au Gold Cut-off Grade (g/t) Resources Category Material Ag (g/t) Cu (%) Type (x1000) (g/t) Ounces Measured - - - - - Indicated 24,959 1.04 3.19 0.13 836,000

  31. Slide 31: Çöpler Mineral Reserves Increased

    Slide 31: Çöpler Mineral Reserves Increased

    Çöpler Mineral Reserves Increased Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Mineral Reserves Contained Au Recoverable Au Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Category Material Ounces Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 17,836 1.1

  32. Slide 32: Çöpler Geology – Plan of Deposit

    Slide 32: Çöpler Geology – Plan of Deposit

    Çöpler Geology – Plan of Deposit TSX: ASR / ASX: AQG / 32

  33. Slide 33: Exceptional Exploration Potential

    Slide 33: Exceptional Exploration Potential

    Exceptional Exploration Potential  18 years in Turkey gives Alacer early-mover advantage  Tethyan Belt is historically under-explored and has excellent mineral potential TSX: ASR / ASX: AQG / 33