Iron Bear Resources Ltd · ASX:IBR
Iron Bear Resources — Cape Lambert Iron Ore — Investor Presentation (July 2006)
15 slides from Iron Bear Resources's investor presentation, July 2006

Slide 1: Western Australian Iron Ore Project
Western Australian Iron Ore Project July 2006

Slide 2: Corporate Profile
Corporate Profile Total Shares on Issue 247.5 m Options 31 October 2008 @ $0.277 (ASX: CFEO) 136.5 m 31 October 2009 @ $0.327 50 m 31 October 2010 @ $0.377 40 m Cash at Bank 13 m Liquid Assets 2m Current as of July 2006 2

Slide 3: Majority Shareholders
Majority Shareholders Name Number % Issued Capital National Nominees Ltd 40,936,261 16.42% ANZ Nominees Limited 23,119,668 9.27% JP Morgan Fleming Aust Ltd 22,750,000 9.12% Power United Limited 18,328,363 7.35% Westpac Custodian Nominees Ltd 12,230,147 4.90% AWP Sage 11,720,075 4.70% Computershare C

Slide 4: Management
Management Dr Ian Burston – Non-Executive Chairman Ian has more than 30 years experience in mining related industries including positions as Managing Director, CEO, Vice President and Chairman for both prominent and junior Company’s. Ian is currently a non-executive Chairman of Broome Port Authority

Slide 5: Cape Lambert Region
Cape Lambert Region (Western Australia) Cape Lambert BHP/ Shell/ Woodside Cape Lambert NW Shelf Gas 2.5bt Resource >$9 billion p/a Rio Tinto Cape Lambert Port >45mt Iron Ore p/a Rio Tinto Wickham Dampier Port Tenement boundary >80 mt Iron Ore p/a (220 sq/km) Ó e Dampier ipelin sP Ga Legend Karratha

Slide 6: Cape Lambert JORC Resource
Cape Lambert JORC Resource 2.5 Billion Tonnes @ 30%Fe 1.4bt in Indicated Resource category 1.1bt in Inferred Resource category (250m depth & 25%Fe cut off) 1.2 Billion Tonnes @ 33%Fe 0.67bt in Indicated Resource category 0.53bt in Inferred Resource category (250m depth & 30%Fe cut off) This Resource

Slide 7: Cape Lambert Geology
Cape Lambert Geology Mount Roe basalt Dolerite an d gabbro Cape Lambert Port Banded Iron (Rio Tinto >45mt iron ore p/a) Karrath a granodiorite Formation Banded iron formation Exploration Target Chert railway railway line Sedim ents Felsic volcanics Basalt Ultramafics 60% Fe Power Robe Target Station

Slide 8: Current Resource
Open along strike to the North Current Resource • 2.5bt Resource Open to the West • Significant upside, the resource is open to: • North • West • South Open along strike to the South • At Depth 8

Slide 9: Cape Lambert Logistic Advantages
Cape Lambert Cape Lambert Deposit Di st Logistic an ce Ra ~5 km il wa y Lin Advantages e • 5km from Coast • Direct connection to Gas, Power, Infrastructure, Local Workforce etc • $2.5million per/km:- Fortescue (FMG) 450km Mt Gibson (MGX) 400km Gindalbie (GBG) 260km Cape Size Vessel Grange Resources

Slide 10: Major Australian Magnetite Deposits
Major Australian Magnetite Deposits Cape Lambert deposit is located on the north west coast of Western Australia, 20km north of Karratha which is a major distribution hub for iron ore, gas, etc. Darwin Close Proximity from Cape Cape Lambert Lambert (CFE) Cape Lambert to Asian Steel Mills 2,500mt NT

Slide 11: Bankable Feasibility Components
Bankable Feasibility Components • 2.5 Billion Tonnes JORC compliant Resource • 40 – 50 year mine life • 5mtpa – 15mtpa concentrator to >60% iron • Capital ex requirements to turn key, est. $500 million • AVG Waste Ratio 0.6 : 1 • Recovery 30 - 35% 11

Slide 12: Comparison of Similar Companies
Comparison of Similar Companies Share Structure Resource Shares Options (Million Est. Cap Production Comment Market (Million) (Million) Tonnes) Expenditure (mtpa) Cap (Million $) BHP Billiton 40,000 Large 75 DSO Rio Tinto 40,000 Large 105 DSO Fortescue Metals (FMG) 2,400 224 2 1,100 2,500 N/A DSO DS

Slide 13: Summary
Summary • Location - 5km’s from Coast • Significant infrastructure already in place (power, road, water and populated areas) • Substantial Tonnage with significant upside • Stable political and economic environment • Proximity to Asian markets 13

Slide 14: Why Invest In Cape Lambert
Why Invest In Cape Lambert • Assembling Professional Team • Large Ore Body Capable of Concentration to Acceptable Steel Industry Standards • Prime Location • Competitive Cost Into Ship • Strong Iron Ore Market • Sole Focus on Developing Cape Lambert Deposit 14

Slide 15: Next Steps
Next Steps Stage 1 • RC Drilling Programme - Commenced Stage 2 • Refine Metallurgical Process for Concentrate • Refine JORC Reserve / Resource Categories • Develop Capital and Operational Estimates • Complete BFS 15
Source: Internet Archive copy of capelam.com.au
More decks from Iron Bear Resources Ltd
Shareholder Meeting (November 2026)25 slides · Nov 23, 2026
Investor Presentation (June 2026)23 slides · Jun 17, 2026
Investor Presentation (May 2026)24 slides · May 6, 2026
Cape Lambert Resources — Mining Indaba 201833 slides · February 2018
Cape Lambert Resources — Mines and Money London 201730 slides · November 2017
Cape Lambert Resources — Investor Presentation (May 2017)29 slides · May 2017