Iron Bear Resources Ltd · ASX:IBR

Iron Bear Resources — Cape Lambert Iron Ore — Investor Presentation (July 2006)

15 slides from Iron Bear Resources's investor presentation, July 2006

  1. Slide 1: Western Australian Iron Ore Project

    Slide 1: Western Australian Iron Ore Project

    Western Australian Iron Ore Project July 2006

  2. Slide 2: Corporate Profile

    Slide 2: Corporate Profile

    Corporate Profile Total Shares on Issue 247.5 m Options 31 October 2008 @ $0.277 (ASX: CFEO) 136.5 m 31 October 2009 @ $0.327 50 m 31 October 2010 @ $0.377 40 m Cash at Bank 13 m Liquid Assets 2m Current as of July 2006 2

  3. Slide 3: Majority Shareholders

    Slide 3: Majority Shareholders

    Majority Shareholders Name Number % Issued Capital National Nominees Ltd 40,936,261 16.42% ANZ Nominees Limited 23,119,668 9.27% JP Morgan Fleming Aust Ltd 22,750,000 9.12% Power United Limited 18,328,363 7.35% Westpac Custodian Nominees Ltd 12,230,147 4.90% AWP Sage 11,720,075 4.70% Computershare C

  4. Slide 4: Management

    Slide 4: Management

    Management Dr Ian Burston – Non-Executive Chairman Ian has more than 30 years experience in mining related industries including positions as Managing Director, CEO, Vice President and Chairman for both prominent and junior Company’s. Ian is currently a non-executive Chairman of Broome Port Authority

  5. Slide 5: Cape Lambert Region

    Slide 5: Cape Lambert Region

    Cape Lambert Region (Western Australia) Cape Lambert BHP/ Shell/ Woodside Cape Lambert NW Shelf Gas 2.5bt Resource >$9 billion p/a Rio Tinto Cape Lambert Port >45mt Iron Ore p/a Rio Tinto Wickham Dampier Port Tenement boundary >80 mt Iron Ore p/a (220 sq/km) Ó e Dampier ipelin sP Ga Legend Karratha

  6. Slide 6: Cape Lambert JORC Resource

    Slide 6: Cape Lambert JORC Resource

    Cape Lambert JORC Resource 2.5 Billion Tonnes @ 30%Fe 1.4bt in Indicated Resource category 1.1bt in Inferred Resource category (250m depth & 25%Fe cut off) 1.2 Billion Tonnes @ 33%Fe 0.67bt in Indicated Resource category 0.53bt in Inferred Resource category (250m depth & 30%Fe cut off) This Resource

  7. Slide 7: Cape Lambert Geology

    Slide 7: Cape Lambert Geology

    Cape Lambert Geology Mount Roe basalt Dolerite an d gabbro Cape Lambert Port Banded Iron (Rio Tinto >45mt iron ore p/a) Karrath a granodiorite Formation Banded iron formation Exploration Target Chert railway railway line Sedim ents Felsic volcanics Basalt Ultramafics 60% Fe Power Robe Target Station

  8. Slide 8: Current Resource

    Slide 8: Current Resource

    Open along strike to the North Current Resource • 2.5bt Resource Open to the West • Significant upside, the resource is open to: • North • West • South Open along strike to the South • At Depth 8

  9. Slide 9: Cape Lambert Logistic Advantages

    Slide 9: Cape Lambert Logistic Advantages

    Cape Lambert Cape Lambert Deposit Di st Logistic an ce Ra ~5 km il wa y Lin Advantages e • 5km from Coast • Direct connection to Gas, Power, Infrastructure, Local Workforce etc • $2.5million per/km:- Fortescue (FMG) 450km Mt Gibson (MGX) 400km Gindalbie (GBG) 260km Cape Size Vessel Grange Resources

  10. Slide 10: Major Australian Magnetite Deposits

    Slide 10: Major Australian Magnetite Deposits

    Major Australian Magnetite Deposits Cape Lambert deposit is located on the north west coast of Western Australia, 20km north of Karratha which is a major distribution hub for iron ore, gas, etc. Darwin Close Proximity from Cape Cape Lambert Lambert (CFE) Cape Lambert to Asian Steel Mills 2,500mt NT

  11. Slide 11: Bankable Feasibility Components

    Slide 11: Bankable Feasibility Components

    Bankable Feasibility Components • 2.5 Billion Tonnes JORC compliant Resource • 40 – 50 year mine life • 5mtpa – 15mtpa concentrator to >60% iron • Capital ex requirements to turn key, est. $500 million • AVG Waste Ratio 0.6 : 1 • Recovery 30 - 35% 11

  12. Slide 12: Comparison of Similar Companies

    Slide 12: Comparison of Similar Companies

    Comparison of Similar Companies Share Structure Resource Shares Options (Million Est. Cap Production Comment Market (Million) (Million) Tonnes) Expenditure (mtpa) Cap (Million $) BHP Billiton 40,000 Large 75 DSO Rio Tinto 40,000 Large 105 DSO Fortescue Metals (FMG) 2,400 224 2 1,100 2,500 N/A DSO DS

  13. Slide 13: Summary

    Slide 13: Summary

    Summary • Location - 5km’s from Coast • Significant infrastructure already in place (power, road, water and populated areas) • Substantial Tonnage with significant upside • Stable political and economic environment • Proximity to Asian markets 13

  14. Slide 14: Why Invest In Cape Lambert

    Slide 14: Why Invest In Cape Lambert

    Why Invest In Cape Lambert • Assembling Professional Team • Large Ore Body Capable of Concentration to Acceptable Steel Industry Standards • Prime Location • Competitive Cost Into Ship • Strong Iron Ore Market • Sole Focus on Developing Cape Lambert Deposit 14

  15. Slide 15: Next Steps

    Slide 15: Next Steps

    Next Steps Stage 1 • RC Drilling Programme - Commenced Stage 2 • Refine Metallurgical Process for Concentrate • Refine JORC Reserve / Resource Categories • Develop Capital and Operational Estimates • Complete BFS 15

Source: Internet Archive copy of capelam.com.au

More decks from Iron Bear Resources Ltd

All 37 Iron Bear Resources decks