Talisker Resources Ltd. · TSX:TSK
Talisker Resources — Investor Presentation (September 2023)
22 slides from Talisker Resources's investor presentation, September 2023
Slide 1: Transition to Production
TSX : TSK OTCQX : TSKFF Transition to Production Corporate Presentation September 2023 TSX : TSK OTCQX : TSKFF | TRANSITION TO PRODUCTION 1
Slide 2: Forward-Looking Statements
Forward-Looking Statements Certain statements in this presentation constitute forward-looking information, which reflect the expectations of management Resources Ltd. (“Talisker” or the “Company”). These statements relate to future events or future performance. The use of any of the words “could”, “
Slide 3: Pathway to High Grade, High Margin Gold
Pathway to High Grade, High Margin Gold ✓Funded to production ✓All required permits in place ✓Confirmed high recovery metallurgy ✓Well known deposit geometry and mining method ✓Excellent structural and grade continuity ✓Pathway to 100k oz/year production ✓Expected long-life mining project ✓Solid mul
Slide 4: Key Points
Key Points Excellent Access & Pipeline 290,000ha Infrastructure Greenfields Claims Highway access to - Major Company Vancouver and Style Project Toll Milling Growing Pipeline Permitted Facilities Resource Base 2 Fully Permitted 1.7Moz at 6.4 g/t Resource Stage Au at the Bralorne Assets Strong Gold P
Slide 5: Dominant Explorer in Southern BC
Dominant Explorer in Southern BC ▪ In the heart of BC Mining ▪ Highway access to projects ▪ Multiple toll milling facilities ▪ Easy access to power ▪ 2 permitted assets ▪ Large greenfields portfolio ▪ 85% of Spences Bridge Gold Belt ▪ 291,392ha land package 5 TSX : TSK OTCQX : TSKFF | TRANSITION TO
Slide 6: Key Points - Bralorne
Key Points - Bralorne 96% average metallurgical recovery 65% free gold Consolidated 100% owned 14,000ha Brownfields camp 47 historic gold occurrences on 33km trend 150,000+m drilling completed 1.7Moz at Clear Pathway to 5Moz+ Au 86 veins identified, 75 open 6.4 g/t Au* in all directions Shallow reso
Slide 7: Upcoming Major Catalysts
Upcoming Major Catalysts 2023-2024 Q1 - 2023 Q3 - 2023 Q1/Q2 - 2024 Resource Conversion Drilling Engineering Studies Updated Mine Plan Portal Rehabilitation Inaugural Resource Start Test Production Underground Access Development February 2023 Trucking of First Ore Development Funding Ore Sale Agreem
Slide 8: Value Proposition
Value Proposition Undervalued Secondary Assets* Resource-ready secondary assets – NI 43-101 Analyst Coverage Target Price**** Compliant 691,540 oz Au ready to expand at Ladner Large Exploration Upside** $2.00 5Moz+ upside based on historic drift assays and drilling + Strong pipeline of Greenfields P
Slide 9: Share Structure and Capitalization
Share Structure and Capitalization Strong Institutional Shareholders Capital Structure (September 1st, 2023) Common Shares Outstanding 77,085,501 Warrants 5,679,600 Options + RSUs 3,333,665 Fully Diluted Shares Outstanding 86,098,766 Market Capitalization ~$26 million Shareholder Breakdown Strategic
Slide 10: Corporate Leadership
Corporate Leadership Management Terry Harbort – CEO, President, Matt Filgate –VP, Corporate and Leonardo de Souza – QP VP, Director Strategic Development Exploration and Resource Development ▪ PhD in Structural Geology and Tectonics. ▪ Matt is Regional Project Geologist for Talisker ▪ 35 years exper
Slide 11: Corporate Leadership
Corporate Leadership Non Executive Directors Morris Prychidny (1)(2) Christy Smith (2)(3) Eric Tremblay (2*)(3*) Chairman ▪ 25 years of proven expertise working ▪ BSc. in mining engineering and mineral with natural resource companies and ▪ Chartered Accountant with 35+ years indigenous communities p
Slide 12: Bralorne - BC's Iconic Gold Camp
Bralorne - BC’s Iconic Gold Camp ▪ Over 40 years of production - 4.2Moz @ 17.7g/t ▪ 2,300oz/vertical metre average ▪ Orogenic veins, structural continuity defined for 2.5 km along strike and 1.9 km depth ▪ Ore shoot continuity demonstrated for up to 1.5 km ▪ High-grade vein core surrounded by minera
Slide 13: Bralorne New Mineral Resource (2023)
Bralorne New Mineral Resource (2023)* Resource Expansion BP Gap Zone Open along strike Untested Untested Resource Conversion King Untested Untested Open at depth Close to surface resource * Refer to Bralorne Inaugural Mineral - 70% new veins in historic ownership gap Resource Estimate, slide 12 and
Slide 14: Bralorne Inaugural Mineral Resource Estimate (MRE)
Bralorne Inaugural Mineral Resource Estimate (MRE)* Cut-off Grade Tonnes Grade Ounces Bralorne Gold Project Category (g/t Au) (t) (g/t Au) (oz Au) King Indicated Long Hole > 2.65 111,300 8.61 30,800 Cut and Fill > 3.10 5,900 13.45 2,600 Inferred Long Hole > 2.65 1,598,400 5.76 296,200 Cut and Fill >
Slide 15: Bralorne Vein Array
Excellent mineability due to Parallel vein sets provide high-grade continuity, vein Bralorne Vein Array potential for numerous adjacent mining fronts structural continuity, high dip angle Cross Section (415,450 mE) Plan View Many veins defined to near surface Excellent structural continuity down dip
Slide 16: Bralorne District-Scale Upside
Bralorne District-Scale Upside ▪ 7 historical mines, 47 known mineral occurrences ▪ 33 km belt amalgamated by Talisker capturing mineralization associated with major suture zone ▪ Historic Resource 186Koz @ 9.1 g/t Au at Congress from surface to 200m * ▪ BRX first-pass drilling results up to 329 g/t
Slide 17: Bralorne Infrastructure
Bralorne Infrastructure ▪ Direct highway access from Vancouver (231km via ▪ Operational camp and kitchen Hurley, 371km via Lillooet) – proximal to airstrip ▪ Consolidated land package (12,750 ha in 61 mineral ▪ Active mining, tailings and water discharge permits / claims, 3 leases + 197 Crown Grant
Slide 18: Ladner Gold Project
Ladner Gold Project ▪ 5 Historical Mines – 24 Known Gold Occurrences ▪ Compliant 691,540oz Inferred Gold Resource* ▪ Major Mines Permit (M-138) in place ▪ 144km2 contiguous land package – ~28kms x 5kms ▪ Under-explored district scale gold system along Hozameen Fault (Coquihalla Gold Belt) ▪ Extensiv
Slide 19: Golden Hornet Discovery
Golden Hornet Discovery ▪ High-grade fault-controlled quartz-sulphide breccias and veins ▪ 8.88 g/t Au, 0.42% Cu and 14.99 g/t Ag over 5.1 metres within a broader zone of 2.59 g/t Au over 21.5 metres in GH-DDH-21-004 ▪ Hole GH-DDH-21-003 intercepted 11.58 g/t Au, 0.37% Cu and 11.1 g/t Ag over 1.05 m
Slide 20: Endnotes
Endnotes Technical Information and Qualified Person The scientific and technical information contained in this presentation has been reviewed and approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified p
Slide 21: Endnotes – continued
Endnotes – continued • High grade capping, supported by statistical analysis, was applied to composited data inside the high-grade quartz veins for Pioneer (1.4 m) at 100 g/t Au, Bralorne (1.4 m) at 100 g/t Au, Charlotte (1.0 m) at 31 g/t Au and King (1.2 m) at 110 g/t Au for the drill hole samples
Slide 22: Corporate Head Office and Vancouver Office
TSX : TSK OTCQX : TSKFF Corporate Head Office: 130 Adelaide Street West, Suite 3002 Toronto, ON M5H 1T1 Vancouver Office: 900-999 West Hastings Street Vancouver, BC V6C 2W2 Terry Harbort, President and CEO +1(416) 357-0227 terry.harbort@taliskerresources.com Matt Filgate, VP , Corporate and Strategi
Talisker Resources — Investor Presentation (September 2023) on 6ix