  1. Slide 1: Continuing to Deliver

    Slide 1: Continuing to Deliver

    Continuing to Deliver Scotiabank Mining Conference 2014 Mark Murchison, Chief Financial Officer TSX: ASR / ASX: AQG December 3, 2014

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements FORWARD‐LOOKING STATEMENTS Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward‐looking information, future oriented financial information, or financial outlooks (collectively “forward‐looking informat

  3. Slide 3: Positioned to Capitalize on Multi-Mine Strategy

    Slide 3: Positioned to Capitalize on Multi-Mine Strategy

    Positioned to Capitalize on Multi‐Mine Strategy Attractive Organic Growth Opportunities 1 Additional oxides  Low capital cost  High margin  Significant cash flow  Leverage existing infrastructure 2 Sulfide project  Significant and scalable low‐cost, long‐term production  Become multi‐mine 3

  4. Slide 4: Company Snapshot

    Slide 4: Company Snapshot

    Company Snapshot Capital Structure Corporate / Asset Location Market Cap ~$600M Corporate Head Office Denver, Colorado Shares on Issue 290M Turkey Fully Diluted 294M Turnover ~1.7M shares/day Istanbul Cash $320M at Sept 30, 2014 Turkey Office Kabadüz Kurttepe Ankara Fol-ken Debt Nil Akoluk Guvemlï K

  5. Slide 5: Delivery on Action Plan Since September 2013

    Slide 5: Delivery on Action Plan Since September 2013

    Delivery on Action Plan Since September 2013 Initial results Çöpler Released of heap leach Confirmed Sold Confirmed achieves '13 positive pad study solid oxide Australian POX is best record Çöpler DFS reveals production Business processing annual Au for Sulfide potential profile to Unit solution for

  6. Slide 6: Çöpler – Q3 2014 Performance

    Slide 6: Çöpler – Q3 2014 Performance

    Çöpler – Q3 2014 Performance Çöpler continues to demonstrate operational excellence 90,000 1,000 80,000 900 800 70,000 700 $ O 60,000 / u 600 50,000 o n 500 u c 40,000 400 n e 1.70 1.84 c s 30,000 1.59 1.48 1.46 300 e 20,000 200 Çöpler Non‐Controlling Interest (ozs) 10,000 100 Çöpler Attributable (o

  7. Slide 7: Life-of-Mine Production Profile

    Slide 7: Life-of-Mine Production Profile

    Life‐of‐Mine Production Profile Çöpler Gold Production 2014 ‐ 2034 300 250 270 258 Gold Production ('000 oz) 241 200 191 203 150 174 177 178 150 157 159 100 119 107 50 0 H2 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026‐2034 Avg Oxide Gold Produced Sulfide Gold Produced  Sulfide p

  8. Slide 8: High-Value, Near-Term Oxide Opportunities

    Slide 8: High-Value, Near-Term Oxide Opportunities

    High-Value, Near-Term Oxide Opportunities Çöpler heap leach pad expansion  Sulfide project DFS mine plan includes 4.2Mt at 1.2 gpt of heap leachable material currently classified as waste  Study well progressed to expand existing heap leach pad capacity beyond current 50Mt  Initial results indica

  9. Slide 9: Positive DFS for Sulfide Project Delivered

    Slide 9: Positive DFS for Sulfide Project Delivered

    Positive DFS for Sulfide Project Delivered  DFS and updated Resources & Reserves further demonstrate:  Robustness of sulfide project  Significant increase to Çöpler’s Reserves  Sulfide project generates attractive financial returns  Brownfield project already significantly derisked  Clear plan

  10. Slide 10: Key Metrics for Sulfide Project

    Slide 10: Key Metrics for Sulfide Project

    Key Metrics for Sulfide Project NI 43‐101 NI 43‐101 Report Report Metrics Metrics LOM Cash Flow $1.6B Total Cash Costs1 $540/oz Total Çöpler NPV at 5% $921M All‐in Sustaining Costs1 $597/oz Pre‐Production Capex $633M All‐in Costs1 $810/oz Sustaining Capex $187M Payback from start of sulfide 1.7 year

  11. Slide 11: Sulfide Project Fully On Track

    Slide 11: Sulfide Project Fully On Track

    Sulfide Project Fully On Track Project Schedule Build Project Team: July 2014 to March 2015 2014 2015 2016 2017 2018  Project Director position filled  Recruit Owner’s Construction Team Çöpler Sulfides DFS  Continue to build Operations Team through life of project Build Project Team Supplemental

  12. Slide 12: Exceptional Exploration Potential

    Slide 12: Exceptional Exploration Potential

    Exceptional Exploration Potential Leveraging our expertise, assets and strategic advantage in Turkey  18 years in Turkey gives Alacer early‐mover advantage  Tethyan Belt is historically under‐explored and has excellent mineral potential TSX: ASR / ASX: AQG / 12

  13. Slide 13: Strong Targets Identified in Highly Prospective Çöpler District

    Slide 13: Strong Targets Identified in Highly Prospective Çöpler District

    Strong Targets Identified in Highly Prospective Çöpler District Anagold Yakuplu (80%)  17m at 1.7g/t Au from 55m  6m at 4.7g/t Au from 55m  14m at 1.6g/t Au from 1m  17m at 2.7g/t Au from 73m Dursunbey Dursunbey Yakuplu (50%)  7m at 4.6g/t Au from surface  10m at 1.0g/t Au from 6m  14m at 1.1

  14. Slide 14: Dursunbey Project

    Slide 14: Dursunbey Project

    Dursunbey Project Promising early‐stage results continue DRD-115 15.9m @ 2.2g/t Au, 59g/t Ag DRD-086 63.9m @ 1.0g/t Au, 27g/t Ag DRD-083  Recent discovery in western Turkey 48.0m @ 1.4 g/t Au, 99g/t Ag DRD-067  Over 26,500m & 250 holes drilled to 10.8m @ 4.2g/t Au, 48g/t Ag date DRD-006 Notable hi

  15. Slide 15: Dursunbey Project

    Slide 15: Dursunbey Project

    Dursunbey Project Cross Section L450 NE – Looking NE DRRC-002 28m @ 0.5g/t Au, 0.6% Cu, 1.9% Zn DRD-043 2.6m @ 3g/t Au, 41g/t Ag DRD-081 DRD-080 DRD-060 5m @ 1.2g/t Au, 20.1m @ 1.4g/t Au, 20.4m @ 0.5g/t Au, 48g/t Ag, 1.4% Cu, 49g/t Ag, 0.7% Cu, 0.7% Cu, 1.5% Zn 0.6% Pb, 3.9% Zn 0.7% Pb, 3.5% Zn DRD-

  16. Slide 16: Key Investment Highlights

    Slide 16: Key Investment Highlights

    Key Investment Highlights World‐class mine with significant, low‐cost production and excellent infrastructure Heap leach operation consistently delivering substantial cash flow Significant increase in heap leach pad capacity provides near‐team opportunities Sulfide project NI 43‐101 estimates Çöpler

  17. Slide 17: For further information, please contact

    Slide 17: For further information, please contact

    For further information, please contact: Lisa Maestas +1‐303‐292‐1299 TSX: ASR / ASX: AQG / 17

  18. Slide 18: Appendix

    Slide 18: Appendix

    ALACERGOLD u

  19. Slide 19: Company Structure

    Slide 19: Company Structure

    Company Structure Corporate Overview 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV (Lidya Mining) (Lidya Mining) (Lidya Mining) (Lidya Mining) Çöpler Gold Mine Certain Turkey Turkey  Çöpler District Licenses Regional Exploration Regional Exploration 5 Projects 11 Projects 3 Pr

  20. Slide 20: Substantial Capital Invested to Optimize Operations Over Past Three Years

    Slide 20: Substantial Capital Invested to Optimize Operations Over Past Three Years

    Substantial Capital Invested to Optimize Operations Over Past Three Years  Over $60 million invested in optimization and process improvement projects Clay‐Handling Bypass Circuit  $13M spent HL Pad Phase 3 Expansion  $7M spent  Designed to improve processing  Increased total leach pad capacity

  21. Slide 21: Sulfide Project Demonstrates Robust Economics

    Slide 21: Sulfide Project Demonstrates Robust Economics

    Sulfide Project Demonstrates Robust Economics LOM Key Assumptions1 (100%) Free Cash Flow1 (millions) (100%) Oxide ‐ HL Sulfide ‐ POX Total Ore Mined Kt 23,249 28,868 LOM $1.6B Au Grade g/t 1.31 2.67 Free Au Recovery % 69.2% 93.9% Cash Flow LOM Modelled Mine Life years 6 18 $227 $227 Operating $197 $

  22. Slide 22: Sulfide Project to Deliver Significant Growth

    Slide 22: Sulfide Project to Deliver Significant Growth

    Sulfide Project to Deliver Significant Growth Average annual gold production of over 150 koz at Total Cash Costs1 of $540/oz Tonnes Processed and Grade (100%) Production and Total Cash Costs1 (C2) (100%) H2 6.4 6.4 H2 2014 5.7 2014 1.8 1.4 1.2 1.3 1.7 1.3 1.0 3.3 3.9 269 257 $540 0.9 0.6 241 2014E 2

  23. Slide 23: Base Case Financial Metrics

    Slide 23: Base Case Financial Metrics

    Base Case Financial Metrics Financial Metrics Base Case DFS Case (as of July 1, 2014) (Oxide (Heap Leach + Incremental Only) POX) B–A A B LOM cash flow (millions) $323 $1,600 $1,250 NPV at 5% (millions) $299 $921 $622 IRR % N/A N/A 20.5 Payback from start of sulfide Years N/A 1.7 gold production  G

  24. Slide 24: Sulfide Project - Sensitivities

    Slide 24: Sulfide Project - Sensitivities

    Sulfide Project ‐ Sensitivities Gold Price Gold Price Base Case Gold Price Gold Price (as of July 1, 2014) $1,100/oz $1,200/oz $1,300/oz $1,400/oz $1,500/oz After‐tax Total cash flows $ millions $956 $1,265 $1,600 $1,862 $2,114 Total NPV at 5% $ millions $516 $719 $921 $1,117 $1,293 Payback from sta

  25. Slide 25: Sulfide Project Capital Cost & Risk Management

    Slide 25: Sulfide Project Capital Cost & Risk Management

    Sulfide Project Capital Cost & Risk Management Capital Cost Summary1 (millions) • Project Management Crushing and Grinding Equipment $70 – Recruitment of the owner’s team Autoclaves and Ancillary Equipment $170 – Leverage local knowledge and experience Metal Recovery (incl. ADR) $74 – Set clear and

  26. Slide 26: Sulfide Project Capital Schedules

    Slide 26: Sulfide Project Capital Schedules

    Sulfide Project Capital Schedules Pre‐Production Capital Expenditure $ Millions Total 2014 2015 2016 2017 2018 Plant 571.1 15.1 82.2 236.7 203.5 33.7 Tailing Facility 49.3 0.0 10.4 25.9 13.0 0.0 Social and Permitting 12.3 0.8 1.2 4.5 5.7 0.0 Total Pre‐Production Capital 632.8 15.9 93.8 267.2 222.2 3

  27. Slide 27: Sulfide Ore Mined by Year

    Slide 27: Sulfide Ore Mined by Year

    Sulfide Ore Mined by Year Sulfide Ore Total 20141 20151 20161 20171 2018 2019 2020 2021 2022 2023 2024 2025 2026 Low‐Grade (1.4‐2.3 g/t) Mined (Mt) 15.7 0.9 0.9 1.0 0.8 1.3 2.4 1.6 0.8 0.6 1.6 1.4 2.4 0.0* Low‐Grade Gold Grade (g/t) 1.86 1.82 1.85 1.88 1.84 1.85 1.89 1.88 1.88 1.87 1.85 1.80 1.88 1.

  28. Slide 28: Sulfide Ore Processed by Year

    Slide 28: Sulfide Ore Processed by Year

    Sulfide Ore Processed by Year Çöpler Gold Mine Total ‘17 ‘18 ‘19 ‘20 ‘21 ‘22 ‘23 ‘24 ‘25 ‘26 ‘27 ‘28 ‘29 ‘30 ‘31 ‘32 ‘33 ‘34 Sulfide Ore Processed (Mt) 31.7 0.0* 1.5 1.8 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.6 Sulfide Au Grade Processed (g/t) 2.7 5.2 4.9 4.2 4.2 3.5 3.0 3.0 2.7 3

  29. Slide 29: Sulfide Project Operating Costs

    Slide 29: Sulfide Project Operating Costs

    Sulfide Project Operating Costs LOM Cash Operating Costs1 Summary Unit Cost Mining Per tonne mined $1.85 Rehandle Per tonne rehandled $1.16 Heap Leach Processing Per tonne heap leach $9.79 processed POX Processing Per tonne POX processed $34.55 Site Support and Offsite Per tonne processed $3.54 Cash

  30. Slide 30: Sulfide Project Operating Costs

    Slide 30: Sulfide Project Operating Costs

    Sulfide Project Operating Costs LOM Cash Costs Summary POX Processing Costs by Component LOM Electric Power Fuel Oil Mobile Equipment ($/t ore $109/oz $15/oz Fuel ($/oz) 26% 3% $7/oz processed) 2% Mining Contract / Support $7.18 $121.85 Labour $53/oz 12% Rehandle G&A Supplies $14/oz 3% Wear Material

  31. Slide 31: Overview of Sulfide Processing Facility

    Slide 31: Overview of Sulfide Processing Facility

    Overview of Sulfide Processing Facility Proven technology  Proven technology used for 38% of global gold production  Autoclave circuit comprised of seven individual pressure vessels  Temperature of 220o C (430o F), Pressure of 2,900 kPag (420 psi)  Sulfur grade averages 4.2%, providing the heat

  32. Slide 32: Sulfide Project Site Layout

    Slide 32: Sulfide Project Site Layout

    Sulfide Project Site Layout Designed with room for a staged approach EXISTING AGGLOMERATOR EXISTING CRUSHING TSX: ASR / ASX: AQG / 32

  33. Slide 33: Resource Reconciliation Study To Date

    Slide 33: Resource Reconciliation Study To Date

    Resource Reconciliation Study To Date • Resource reconciliation work has significantly upgraded the quality of the reserve • Changed modelling method from Ordinary Kriging to Probability Assigned Constrained Kriging (PACK), utilized because it allows better calibration of the resource model to histo

  34. Slide 34: Çöpler Reserves and Resources Growth

    Slide 34: Çöpler Reserves and Resources Growth

    Çöpler Reserves = 3.8Moz Çöpler M+I Resources = 7.8Moz Çöpler Resource + Mined Ounces (100%) 14 12 10 Million ounces of gold 8 Inferred 6 Measured + Indicated Contained Ounces Mined 4 2 ‐ Dec 11 June 12 June 13 Dec 13 Feb 10 Çöpler reserves and resources have continued to increase TSX: ASR / ASX: AQ

  35. Slide 35: New Çöpler Mineral Resource

    Slide 35: New Çöpler Mineral Resource

    New Çöpler Mineral Resource Updated Mineral Resources for the Ҫӧpler Deposit (As of December 31, 2013) Material Resource Category Tonnes Contained Gold Cut‐off Grade (g/t) Au (g/t) Ag (g/t) Cu (%) Type Material (x1000) Au Ounces Measured ‐ ‐ ‐ ‐ ‐ Indicated 69,512 1.08 2.78 0.15 2,420,600 Variable O

  36. Slide 36: New Çöpler Mineral Reserve

    Slide 36: New Çöpler Mineral Reserve

    New Çöpler Mineral Reserve Updated Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2013) Tonnes Au Ag Cu Contained Au Recoverable Au Reserve Category Material (x1000) (g/t) (g/t) (%) Ounces Ounces Proven ‐ Oxide In‐Situ ‐ ‐ ‐ ‐ ‐ ‐ Probable ‐ Oxide In‐Situ 26,207 1.32 2.88 0.13 1,114,700

  37. Slide 37: Life-of-Mine Production Profile

    Slide 37: Life-of-Mine Production Profile

    Life‐of‐Mine Production Profile 3.2 million ounces produced July 2014 2018 2023 to Dec 2017 to 2022 to 2034 Total Heap Leach First 5 years Remainder of (100%) Only of POX LoM Mining Oxide Ore to Heap Leach Pad Mt 21.8 1.5 0 23.2 Sulfide Ore Mt 6.31 13.7 8.9 28.9 Waste Mt 85.8 51.4 24.1 161.2 Total T