10 slides from Alacer Gold's earnings presentation, Oct 27, 2014
Slide 1: Q3 2014 Results
Q3 2014 Results Rod Antal, Chief Executive Officer Mark Murchison, Chief Financial Officer October 27, 2014 TSX: ASR / ASX: AQG
Slide 2: Cautionary Statements
Cautionary Statements FORWARD-LOOKING STATEMENTS Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking informat
Slide 3: Çöpler – Q3 2014 Performance
Çöpler – Q3 2014 Performance Çöpler continues to demonstrate operational excellence 90,000 1,000 80,000 900 800 70,000 700 $ O 60,000 / u 600 50,000 o n 500 u c 40,000 400 n e 1.70 1.84 c s 30,000 1.59 1.48 1.46 300 e 20,000 200 Çöpler Non-Controlling Interest (ozs) 10,000 100 Çöpler Attributable (o
Slide 4: Financial Position
Financial Position Strong balance sheet positioned for growth September 30 December 31 Favorable 2014 2013 (Unfavorable) ($M) ($M) Variance ($M) Current assets 391.3 363.9 27.4 Current liabilities 41.6 48.7 7.1 Net current assets 349.7 315.2 34.5 Total assets 727.4 712.2 15.2 Total liabilities 74.4
Slide 5: P&L Statement – Summary Comparison
P&L Statement – Summary Comparison Q3 Q3 Favorable 2014 2013 (Unfavorable) Key Points ($M) ($M) Variance ($M) Gold sales 79.6 108.8 (29.2) Lower revenue primarily due to 22% lower production & lower gold price Production costs 34.7 27.8 (6.9) Higher costs primarily due to increased strip ratio, incr
Slide 6: Life-of-Mine Production Profile
Life-of-Mine Production Profile Çöpler Gold Production (100%) 2014 - 2034 300 250 270 258 Gold Production ('000 oz) 241 200 191 203 150 174 177 178 150 157 159 100 119 107 50 0 H2 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026-2034 Avg Oxide Gold Produced Sulfide Gold Produced Id
High-Value, Near-Term Oxide Opportunities Çöpler heap leach pad expansion Sulfide project DFS mine plan includes 4.2Mt at 1.2 gpt of heap leachable material currently classified as waste Study well progressed to expand existing heap leach pad capacity beyond current 50Mt to capture the 4.2Mt cur
Slide 8: Sulfide Project Fully On Track
Sulfide Project Fully On Track Project Schedule Build Project Team: July 2014 to March 2015 2014 2015 2016 2017 2018 Project Director position filled Recruit Owner’s Construction Team Çöpler Sulfides DFS Continue to build Operations Team through life of project Build Project Team Supplemental
Slide 9: Key Investment Highlights
Key Investment Highlights World-class mine with significant, low-cost production and excellent infrastructure Heap leach operation consistently delivering substantial cash flow, adding to an already substantial cash balance Increase in heap leach capacity through expansion of current leach pad and/o
Slide 10: For further information, please contact
For further information, please contact: Lisa Maestas +1-303-292-1299 TSX: ASR / ASX: AQG / 10