Radium Life Tech Co., Ltd. · TWSE:2547
Radium Life Tech — Q3 2022 Earnings Presentation
23 slides from Radium Life Tech's earnings presentation, 2022
Slide 1: Radium Group
Radium Group
Slide 2: Disclaimer
Disclaimer • This presentation and the materials provided herewith do not constitute an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the “Company” in any jurisdiction or an inducement to enter into investment activity, nor may it or any part of it form the b
Slide 3: 4Q 2022 Radium Group Summary/ Update
3 4Q 2022 Radium Group Summary/ Update 1. 4Q 2022- Radium won "Real Estate and Construction Industry Group Report -Golden Award" at the 2022 Taiwan Corporate Sustainability Awards (TCSA). 2. 4Q 2022- Subsidiary Titan Development and Construction Co., Ltd. participated in the open tendering procedure
Slide 4: 4Q 2022 Radium Group Summary/ Update
4 4Q 2022 Radium Group Summary/ Update 5. 3Q 2022- Subsidiary Rih Ding Water is managing the Taiwan largest Taoyuan North District Water Resource Recovery System BOT, apart from combining BioNET technology with MBR filtration system, Rih Ding Water cooperates also with ITRI through “A+ program” to d
Slide 5: 4Q 2022 Radium Group Summary/ Update
5 4Q 2022 Radium Group Summary/ Update 9. 3Q 2022- Subsidiary Bao Ding Reclaimed Water, planning to develop “Reclaimed Water BTO Project of North District Water Resources Recycling Center in Taoyuan,” is supported by bankers with total amount of the syndicated loan reaches NT$ 2.93 billion. 10. 3Q 2
Slide 6: Radium Group Organization & Business
Radium Group Organization & Business Radium Renewables Development Operating Business Rih Ding 28.35% Circular Economy 61.06% Investment Holdings Ji Shun Life Ech Co., Ltd. 100% Titan 36.8% Jing-Jan Investment 100% 100% Holdings Radium Rih Rih Zhao Ding Sheng Kagaya Green Rih Ding Yao Siang Yao Wate
Slide 7: Project Site Location
Current Major Projects Kaohsiung the urban renewal Railway Station Land Development project for Lot Radium New GENESIS GENESIS MRT Daqiaotou East Old Projects of 246, Subsection 3 Qiao'an Project Q Square in Station -Sanzhi -Qishan Dormitory Area TaiChung MRT Gongyuan Section, project Qingpu Urban R
Slide 8: Radium Green Buildings Certified by EEWH by end of 2022
Radium Green Buildings Certified by EEWH by end of 2022 New New North Youth Social New New North NewHousing North North Youth Youth Social i Go Home NorthYouth Youth Housing HousingiiiiiGo SocialHousing Social Social Housing Go Home GoHome Go Home Home Fu-Jou Fu-Jou Fu-Jou Affordable Housing Afforda
Slide 9: Radium Elderly Caring Business- GENESIS
Radium Elderly Caring Business- “GENESIS” Radium GENESIS Plan • I Beautiful Life-Zhonghe & Sanzhi • The GENESIS-Sanzhi • Kaohsiung Qishan Project Future Development • Suburb areas 9
Slide 10: I Beautiful Life- Zhonghe Elderly House
I Beautiful Life- Zhonghe Elderly House • “I Beautiful Life-Zhonghe” won the "Symbol of National Quality" awarded by the National Biotechnology Medical Technology Policy Center for its warming home-like service. • Safety Care GPS/ Positioning System • Health Physical management • Health Improvement
Slide 11: GENESIS-Sanzhi
GENESIS-Sanzhi The site area is approximately 5,864 pings, and the planned total floor area is approximately 19,304 pings. Total floor area: planned to be 19,304 pings. “The Genesis 1- Sanzhi” => Buildings A and B for leasing. => Buildings C, D, E and F for sales. “The Genesis 2- Sanzhi” => “T
Slide 12: GENESIS–Qishan
GENESIS–Qishan Project Qishan Project Beishi Section, Middle- Site Location Qishan Dist., Kaohsiung Development Self-Constructed Asset. Mechanism Phase 1 development 高鐵桃園站 Site Area plan~18,820 pings Phase 1 development GFA plan~19,914 pings Health elderly caring Product Planning Compound park 12
Slide 13: Kaohsiung Railway Station East Old Dormitory Area Urban Renewal Project
Kaohsiung Railway Station East Old Dormitory Area Urban Renewal Project Location: Near by the Taiwan Railway Kaohsiung Station, with area of 8,392 pings, type-2 specific commercial area. Building coverage ratio 50% and floor area ratio 300%. Public land owned by the Railway Administration of t
Slide 14: Land Development Project of WuRi WenXin BeiTun Line - Wenxin Stations
The Land Development Project of WuRi WenXin BeiTun Line -Wenxin Chongde &Wenxin Yinghua Stations of TaiChung MRT Systems Location : Wenxin Chongde Station (G6 Station) : Located in the Dongfeng section of Beitun District. Site area about 700 pings, with a coverage rate of 70% and a floor area
Slide 15: Land Development Project of WuRi WenXin BeiTun Line - Nantun Station
The Land Development Project of WuRi WenXin BeiTun Line -Nantun Station of TaiChung MRT Systems Location : Nantun Station located at the intersection of Wenxin road and Wuquan west road in Nantun District, Site area about 771 pings, with a coverage rate of 70% and a floor area ratio of 500%.It’s
Slide 16: Urban Renewal Project for Lot 246, Gongyuan Section, Taipei
The Urban Renewal Project for Lot 246, Subsection 3 Gongyuan Section, Zhongzheng Dist., Taipei City Location : The project is located at the cross roads of Guanqian Rd. and Xinyang Street near by Taipei Main Station. It involves land base of 608 pings, with building coverage ratio of 75% and flo
Slide 17: Qiao'an project
Qiao'an project Location : This project is located at the district B of Qiao'an New Village with land size of around 1,000 pings. It is in commercial area of Taipei City, adjacent to the cultural heritage Sun Yat-Sen Memorial Hall, with MRT station on Bannan Line nearby. Ji Shun Life obtained
Slide 18: Administrative Building and Library Building Construction, National Palace Museum
Administrative Building and Library Building Construction, National Palace Museum Location : The project is located at the Zhishan Section, Shilin District of Taipei City, with a floor area around 2,195 pings. Estimated development schedule : The preliminary design of the administrative buil
Slide 19: BOT Project for Taoyuan City Taoyuan District Sewerage System
BOT Project for Taoyuan City Taoyuan District Sewerage System- The Largest Public Sewerage System In Taiwan Six Urban Planning Area In Taoyuan Area Nankan(North Zhuang Total~7,610 Hectare Jing Road) Sewerage Structure of Construction : Nankan(South System Zhuang Jing Road) 1.Sewerage System Factory:
Slide 20: BOT Project for Taoyuan District Sewerage System - Schedule
BOT Project for Taoyuan City Taoyuan District Sewerage System -Schedule Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 20 31 32 33 34 35 2013-2017 2018-2021 2022-2026 2027-2031 2032-2047 sewer 66 78 42 Total about pipe(KM) 99 284.99km (165) (243) (285) User Units
Slide 21: Water BTO Project of North District Water Resources Recycling Center in Taoyuan
Water BTO (build, transfer, operate) Project of North District Water Resources Recycling Center in Taoyuan Location : The base of project is located on the north side of the Taoyuan North District Water Recycling Center, at the Nanqing Section of Luzhu District, Taoyuan City, with an area of abo
Slide 22: Wan Da Tong - Taipei Bus Station & Leasing Business
Wan Da Tong - Taipei Bus Station & Leasing Business PALAIS de CHINE Hotel Office Radium Residence Investment Income BEING Sport Jing-Jan VIESHOW Investment Q Square Shopping Taipei Bus Holdings Station Mall Leasing Part Car Park Wan Da Tong Rental Business Hotel Cinema Club Mall Car Park Bus Station
Slide 23: 23
23