Alacer Gold — Investor Presentation (May 2012)
22 slides from Alacer Gold's investor presentation, May 2012

Slide 1: A Leading Intermediate Gold Producer With Internally Funded Organic Growth
A Leading Intermediate Gold Producer With Internally Funded Organic Growth Investor Presentation – May 2012 TSX: ASR / ASX: AQG | 1

Slide 2: Cautionary Statements
Cautionary Statements FORWARD‐LOOKING STATEMENTS Except for statements of historical fact relating to Alacer Gold Corp. (“Alacer” or the “Company”), certain statements contained in this presentation constitute forward‐ looking information, future oriented financial information, or financial outlooks

Slide 3: Capital Structure
Capital Structure • Market Cap ~$2.2 billion • Shares on issue 287M • Fully diluted 291M • Turnover 1.2M shares/day • Cash $250M at Dec 2011 • Convertible Debenture Matured April 2012 • Debt $63M at Dec 2011 • Key Shareholders Pala Investments (19.4%) M&G Investments (13.0%) Trident Underground Mine

Slide 4: Board of Directors
Board of Directors Non‐Executive Chairman – Tim Haddon, mining engineer, ex‐CEO of Amax Gold CEO – Ed Dowling, ex‐CEO of Meridian Gold Non‐Executive Directors Jan Castro – lawyer, CEO of Pala Investments Richard Graff – accountant, retired PWC partner Jay Kellerman – partner with Stikeman

Slide 5: Gold Production and Financials
Gold Production and Financials Full‐year gold production1 = 421,204 ozs at cash operating costs2 = $546/oz NPAT = $75M, adjusted net profit2 = $130M for 2011 Cash from operating activities = $258M for 2011 Cash at December 31, 2011 = $250M Q1 MD&A to be released May 15, 2012 1These numbers

Slide 6: 2012 Guidance
2012 Guidance Cash 2012 Gold Total General Growth Operating Operation Production Cash Costs CapEx CapEx Costs (‘000 ounces) 1 ($/oz) 2, 3 ($M) 2 ($M) 2 ($/oz) 2, 3 Çöpler 195 to 200 360 to 380 400 to 420 51 26 Higginsville 150 to 155 765 to 795 955 to 985 37 19 South Kalgoorlie4 90 to 95 685 to 710

Slide 7: Resources and Reserves
Resources and Reserves Total attributable P+P Reserves = 5.3Moz Total attributable M+I Resources = 10.5Moz Total attributable Inferred Resources = 3.4Moz Substantial exploration program to increase and upgrade resources Notes: Resources are quoted after mining depletion and are inclusive of

Slide 8: Çöpler Resource Increased by 1.2M Ounces to 7.6M Ounces
Çöpler Resource Increased by 1.2M Ounces to 7.6M Ounces Prior to Mining Depletion Çöpler M+I Resource increases contained gold to 7.3Moz, 148.9Mt at 1.53g/t (after mining depletion) New M+I resource increases = 6% for tonnes, 12% for gold grade and 18% for contained gold from previous resource o

Slide 9: Çöpler Geological Plan
Çöpler Geological Plan Recent Drilling Extending Mineralization Continuity between Çöpler Village Main and Manganese Extensions Zones Manganese Zone Current Oxide Pit Gold mineralization continues to the west Main Zone Oxide Pit Marble Zone Oxide Pit Main Zone Sulfide Extensions 3 km long ore zone T

Slide 10: Çöpler - Main Zone 59000E Section
Çöpler - Main Zone 59000E Section Çöpler Gold Mine Thickest mineralized zone Main Zone intersection to date TSX: ASR / ASX: AQG | 10

Slide 11: Çöpler – New Gold-Copper District
Çöpler – New Gold-Copper District Yakuplu Gold prospects in-line with major Çöpler structure 0.56g/t Au in soils 7g/t Au in rock chips Çöpler +7Moz Au deposit, depth and east-west extensions 15 km Multiple Au-Cu prospects along 8km contact zone Demirmaĝara Au-Cu prospect in-line with major Karakarta

Slide 12: Çöpler Sulfide Project
Çöpler Sulfide Project Çöpler Sulfide Pre‐Feasibility Study1 completed in March 2011 showed: LOM production increased 182% to 3.7Moz Sulfide project initial capex = $410M and generates 25% IRR at gold price =$1,038/oz Life‐of‐mine total cash costs2 on a by‐product basis = $430/oz Full Feasibil

Slide 13: Australia – Multi-Mine Production
Australia – Multi-Mine Production Two treatment hubs: Several ore sources Open pit & underground mix Operating efficiencies Systematic exploration of largest tenement holding in rich Kalgoorlie to Norseman belt Strategic flexibility across entire belt Major exploration program in progres

Slide 14: SKO 2012 Exploration Program - $18M Budget
SKO 2012 Exploration Program - $18M Budget Location 50 (10%) SBS 28 (40%) High-grade open pit and Targeting high- conceptual UG Targets, grade open pit incl: Pernatty/Triumph and UG complex Mt Martin (25%) Targeting UG discovery Recent high- grade intercepts at Surprise Location 48 (10%) High-grade

Slide 15: Higginsville Line of Lode Long Section
Higginsville Line of Lode Long Section 6km Long Graveyard to Trident Ore Trend Helios RC Drill Focus Recent Corona Discovery on Vine Section Completed Planned • 1 million ounces in top 300m with limited testing below 300m • Potential for high‐grade UG ore below mined open pits • Trident is the only

Slide 16: Higginsville – Corona Discovery
Higginsville – Corona Discovery Laminated quartz vein with coarse visible gold in some drill intercepts High‐grade area is centred on the VIND047, VIND049 and VIND076 Geological and economic evaluations continuing Only 2.5km from Higginsville mill TSX: ASR / ASX: AQG | 16

Slide 17: Higginsville – Chalice Gap Drilling
Higginsville – Chalice Gap Drilling Drilling has confirmed continuity of thick, high‐grade mineralization outside the current Chalice Mineral Resource over a 100m strike extent and up to 80m dip extent TSX: ASR / ASX: AQG | 17

Slide 18: Identify Growth Opportunities
Identify Growth Opportunities TSX: ASR / ASX: AQG | 18

Slide 19: 5 Year Plan Delivers Growth Strategy
5 Year Plan Delivers Growth Strategy Gold production vision = 800,000* ozs per year in 2015 Gold production of 421,000 ozs in 2011 Target for Australian production ~400,000 ozs per year: • Higginsville – 1.5Mtpa at approximately 4.5g/t • SKO – 2.5Mtpa at approximately 2.5g/t Target for Çöpler

Slide 20: TSX: ASR / ASX: AQG | 20
TSX: ASR / ASX: AQG | 20

Slide 21: Mineral Resources Table
Mineral Resources Table Source: Annual Information Form, March 30, 2012 TSX: ASR / ASX: AQG | 21

Slide 22: Mineral Reserves Table
Mineral Reserves Table Source: Annual Information Form, March 30, 2012 TSX: ASR / ASX: AQG | 22
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017