Iron Bear Resources Ltd · ASX:IBR
Iron Bear Resources — Cape Lambert Iron Ore — Investor Presentation (May 2007)
25 slides from Iron Bear Resources's investor presentation, May 2007

Slide 1: Western Australian Magnetite Iron Ore Project
Western Australian Magnetite Iron Ore Project May 2007 Cape Lambert Iron Ore Ltd 18 Oxford Close, Leederville, Western Australia 6007, Australia phone +61 8 9380 9555 facsimile +61 8 9380 9666 www.capelam.com.au

Slide 2: Disclaimer
Disclaimer The information contained in this Presentation has not been independently verified. The information set out in this Presentation may be subject to updating, revision, verification and amendment and such information may change materially. Cape Lambert is under no obligation to update or ke

Slide 3: Corporate Profile
Corporate Profile Total Shares on Issue (ASX: CFE) 248.18 m Options 31 October 2008 @ $0.277 (ASX: CFEO) 136.5 m 31 October 2009 @ $0.327 50 m 31 October 2010 @ $0.377 40 m Cash at Bank 1 6.9 m Liquid Assets 4.1 m 1 Current as of April 2007 3

Slide 4: Major Shareholders
Major Shareholders Name Number % Issued Capital National Nominees Limited 28,988,149 11.60% Power United Limited 18,328,363 7.33% JP Morgan Fleming Aust Ltd 16,167,000 6.47% HSBC Custody Nominees (Australia) Limited 13,917,874 5.57% Computershare Clearing Pty Ltd 12,892,590 5.16% AWP Sage <Egas Supe

Slide 5: Board of Directors
Board of Directors Dr Ian Burston – Non-Executive Chairman Ian has more than 30 years experience in mining related industries including positions as Managing Director, CEO, Vice President and Chairman for both prominent and junior Companies. Ian is currently non-executive Chairman of Broome Port Aut

Slide 6: Key Management
Key Management Mr Joe Ariti – General Manager - Projects Joe Ariti is a metallurgist with over 20 years experience in technical, management, general management and executive roles in assessing, developing and managing mining projects and companies in the resources industry, both in Australia and ove

Slide 7: Project Location
Project Location Cape Lambert BHP/ Shell/ Woodside Cape Lambert NW Shelf Gas 2.5bt Resource >$9 billion p/a Rio Tinto Cape Lambert Port >45mt Iron Ore p/a Rio Tinto Wickham Dampier Port Tenement boundary >80 mt Iron Ore p/a (220 sq/km) Ó Dampier line Pipe s Karratha Ga Legend Gas Pipeline railway Ra

Slide 8: Project Endowment
Project Endowment 8

Slide 9: Logistic Advantages
Logistic Advantages Cape Lambert Deposit • 5km from Coast Di sta n Ra ce ilw ~ 5k ay m L • Direct connection to Gas, ine Power, Infrastructure, Local Workforce etc • Fortescue (FMG) 450km • Mt Gibson (MGX) 400km • Gindalbie (GBG) 260km • Grange (GRR) 120km Cape Size Vessel (200,000t - 300,000t) 9

Slide 10: Major Australian Magnetite Deposits
Major Australian Magnetite Deposits Project is located on the north west coast of Western Australia, 20km north of Karratha which is a major distribution hub for iron ore, gas, etc. Darwin Close Proximity from Cape Cape Lambert Lambert (CFE) Cape Lambert to Asian Steel Mills 2,500mt NT NT Qld QLD Ch

Slide 11: Whole Rock JORC Resource
Whole Rock JORC Resource 2.5 Billion Tonnes @ 30%Fe 1.4bt in Indicated Resource category 1.1bt in Inferred Resource category (250m depth & 25%Fe cut off) 1.2 Billion Tonnes @ 33%Fe 0.67bt in Indicated Resource category 0.53bt in Inferred Resource category (250m depth & 30%Fe cut off) This Resource w

Slide 12: Regional Geology
Regional Geology Mount Roe basalt Dolerite and gabbro Cape Lambert Port Banded Iron (Rio Tinto >45mt iron ore p/a) Karratha granodiorite Formation Banded iron formation Exploration Target Chert railway railway line Sediments Felsic volcanics Basalt Ultramafics 60% Fe Power Robe Target Station Wickha

Slide 13: 2006 Drilling Campaign
2006 Drilling Campaign • 69 RC holes completed for 18,052m; • Drilling focused within Central Target Area (CTA) where Robe DTR recovery was >30%; • 1,709 samples submitted for DTR analysis; • Drilling scheduled to recommence in April to the North and Southeast. 13

Slide 14: New Zone Discovered
New Zone Discovered • New zone discovered to the south east – MA210 – 202m thick, 35% DTR concentrate at 66.9% Fe; – MA209 – 164m thick, 34% DTR concentrate at 67.4% Fe; – First priority drill target for 2007. • Option acquired over 3 contiguous tenements to the east – Opportunity to assess continua

Slide 15: Upside – Mineralisation Open
Upside – Mineralisation Open 15

Slide 16: 2007 Drilling Program
2007 Drilling Program • Commencing 24/25 April; • Priority target areas to the north and southeast; • Heritage clearances completed; • Program comprises diamond core and infill & extension RC; • Anticipated RC program of 30-50k metres, and 10,000m of diamond. 16

Slide 17: CTA Resource Update Underway
CTA Resource Update Underway 17

Slide 18: Metallurgy
Metallurgy • 1,600 DTR results received; • Typical parameters; – Concentrate recovery – 33% – Fe grade – 65.4% – Silica – 6.7% – Alumina – 0.4% – p80 of 30µ • Met-Chem retained to develop flowsheets; • Diamond core testwork program during 2007 to validate flowsheet; • New flotation configuration bei

Slide 19: Preliminary Engineering Study
Preliminary Engineering Study • Metplant Engineering in conjunction with Connell Wagner & Coffey Mining appointed to prepare a preliminary engineering study. • Key objectives of the preliminary engineering study are to; – Develop a project layout; – Complete initial mine design & production schedule

Slide 20: Preliminary Engineering Timetable
Preliminary Engineering Timetable 20

Slide 21: Possible Project Layout
Possible Project Layout Port Resource Concentrator 21

Slide 22: Environmental Approvals
Environmental Approvals • URS retained to oversee preparation & approval of environmental and social impact assessment (ESIA); • Scoping document (issues identification) now complete; • Base line flora and fauna surveys to commence in early May following recent rains. 22

Slide 23: Native Title
Native Title • Single claimant group to negotiate with; • Relationship established with management team following recent Heritage clearances; • Future Acts negotiations pending further project definition. 23

Slide 24: Next Steps
Next Steps • Recommence RC drilling in April, diamond drilling in June; • Finalise resource update; • First pass open pit mining studies; • Review port options study and further develop preferred option(s); • Commence preliminary engineering study and develop project capital and operating cost estim

Slide 25: Summary
Summary • Location - 10km’s from Coast & deep water; • Significant infrastructure available (power, road, water and populated areas); • Substantial mineralised system with significant upside; • Emerging understanding of geology & controls to mineralisation. 25
Source: Internet Archive copy of capelam.com.au
More decks from Iron Bear Resources Ltd
Shareholder Meeting (November 2026)25 slides · Nov 23, 2026
Investor Presentation (June 2026)23 slides · Jun 17, 2026
Investor Presentation (May 2026)24 slides · May 6, 2026
Cape Lambert Resources — Mining Indaba 201833 slides · February 2018
Cape Lambert Resources — Mines and Money London 201730 slides · November 2017
Cape Lambert Resources — Investor Presentation (May 2017)29 slides · May 2017