Iron Bear Resources Ltd · ASX:IBR

Iron Bear Resources — Cape Lambert Iron Ore — Investor Presentation (May 2007)

25 slides from Iron Bear Resources's investor presentation, May 2007

  1. Slide 1: Western Australian Magnetite Iron Ore Project

    Slide 1: Western Australian Magnetite Iron Ore Project

    Western Australian Magnetite Iron Ore Project May 2007 Cape Lambert Iron Ore Ltd 18 Oxford Close, Leederville, Western Australia 6007, Australia phone +61 8 9380 9555 facsimile +61 8 9380 9666 www.capelam.com.au

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information contained in this Presentation has not been independently verified. The information set out in this Presentation may be subject to updating, revision, verification and amendment and such information may change materially. Cape Lambert is under no obligation to update or ke

  3. Slide 3: Corporate Profile

    Slide 3: Corporate Profile

    Corporate Profile Total Shares on Issue (ASX: CFE) 248.18 m Options 31 October 2008 @ $0.277 (ASX: CFEO) 136.5 m 31 October 2009 @ $0.327 50 m 31 October 2010 @ $0.377 40 m Cash at Bank 1 6.9 m Liquid Assets 4.1 m 1 Current as of April 2007 3

  4. Slide 4: Major Shareholders

    Slide 4: Major Shareholders

    Major Shareholders Name Number % Issued Capital National Nominees Limited 28,988,149 11.60% Power United Limited 18,328,363 7.33% JP Morgan Fleming Aust Ltd 16,167,000 6.47% HSBC Custody Nominees (Australia) Limited 13,917,874 5.57% Computershare Clearing Pty Ltd 12,892,590 5.16% AWP Sage <Egas Supe

  5. Slide 5: Board of Directors

    Slide 5: Board of Directors

    Board of Directors Dr Ian Burston – Non-Executive Chairman Ian has more than 30 years experience in mining related industries including positions as Managing Director, CEO, Vice President and Chairman for both prominent and junior Companies. Ian is currently non-executive Chairman of Broome Port Aut

  6. Slide 6: Key Management

    Slide 6: Key Management

    Key Management Mr Joe Ariti – General Manager - Projects Joe Ariti is a metallurgist with over 20 years experience in technical, management, general management and executive roles in assessing, developing and managing mining projects and companies in the resources industry, both in Australia and ove

  7. Slide 7: Project Location

    Slide 7: Project Location

    Project Location Cape Lambert BHP/ Shell/ Woodside Cape Lambert NW Shelf Gas 2.5bt Resource >$9 billion p/a Rio Tinto Cape Lambert Port >45mt Iron Ore p/a Rio Tinto Wickham Dampier Port Tenement boundary >80 mt Iron Ore p/a (220 sq/km) Ó Dampier line Pipe s Karratha Ga Legend Gas Pipeline railway Ra

  8. Slide 8: Project Endowment

    Slide 8: Project Endowment

    Project Endowment 8

  9. Slide 9: Logistic Advantages

    Slide 9: Logistic Advantages

    Logistic Advantages Cape Lambert Deposit • 5km from Coast Di sta n Ra ce ilw ~ 5k ay m L • Direct connection to Gas, ine Power, Infrastructure, Local Workforce etc • Fortescue (FMG) 450km • Mt Gibson (MGX) 400km • Gindalbie (GBG) 260km • Grange (GRR) 120km Cape Size Vessel (200,000t - 300,000t) 9

  10. Slide 10: Major Australian Magnetite Deposits

    Slide 10: Major Australian Magnetite Deposits

    Major Australian Magnetite Deposits Project is located on the north west coast of Western Australia, 20km north of Karratha which is a major distribution hub for iron ore, gas, etc. Darwin Close Proximity from Cape Cape Lambert Lambert (CFE) Cape Lambert to Asian Steel Mills 2,500mt NT NT Qld QLD Ch

  11. Slide 11: Whole Rock JORC Resource

    Slide 11: Whole Rock JORC Resource

    Whole Rock JORC Resource 2.5 Billion Tonnes @ 30%Fe 1.4bt in Indicated Resource category 1.1bt in Inferred Resource category (250m depth & 25%Fe cut off) 1.2 Billion Tonnes @ 33%Fe 0.67bt in Indicated Resource category 0.53bt in Inferred Resource category (250m depth & 30%Fe cut off) This Resource w

  12. Slide 12: Regional Geology

    Slide 12: Regional Geology

    Regional Geology Mount Roe basalt Dolerite and gabbro Cape Lambert Port Banded Iron (Rio Tinto >45mt iron ore p/a) Karratha granodiorite Formation Banded iron formation Exploration Target Chert railway railway line Sediments Felsic volcanics Basalt Ultramafics 60% Fe Power Robe Target Station Wickha

  13. Slide 13: 2006 Drilling Campaign

    Slide 13: 2006 Drilling Campaign

    2006 Drilling Campaign • 69 RC holes completed for 18,052m; • Drilling focused within Central Target Area (CTA) where Robe DTR recovery was >30%; • 1,709 samples submitted for DTR analysis; • Drilling scheduled to recommence in April to the North and Southeast. 13

  14. Slide 14: New Zone Discovered

    Slide 14: New Zone Discovered

    New Zone Discovered • New zone discovered to the south east – MA210 – 202m thick, 35% DTR concentrate at 66.9% Fe; – MA209 – 164m thick, 34% DTR concentrate at 67.4% Fe; – First priority drill target for 2007. • Option acquired over 3 contiguous tenements to the east – Opportunity to assess continua

  15. Slide 15: Upside – Mineralisation Open

    Slide 15: Upside – Mineralisation Open

    Upside – Mineralisation Open 15

  16. Slide 16: 2007 Drilling Program

    Slide 16: 2007 Drilling Program

    2007 Drilling Program • Commencing 24/25 April; • Priority target areas to the north and southeast; • Heritage clearances completed; • Program comprises diamond core and infill & extension RC; • Anticipated RC program of 30-50k metres, and 10,000m of diamond. 16

  17. Slide 17: CTA Resource Update Underway

    Slide 17: CTA Resource Update Underway

    CTA Resource Update Underway 17

  18. Slide 18: Metallurgy

    Slide 18: Metallurgy

    Metallurgy • 1,600 DTR results received; • Typical parameters; – Concentrate recovery – 33% – Fe grade – 65.4% – Silica – 6.7% – Alumina – 0.4% – p80 of 30µ • Met-Chem retained to develop flowsheets; • Diamond core testwork program during 2007 to validate flowsheet; • New flotation configuration bei

  19. Slide 19: Preliminary Engineering Study

    Slide 19: Preliminary Engineering Study

    Preliminary Engineering Study • Metplant Engineering in conjunction with Connell Wagner & Coffey Mining appointed to prepare a preliminary engineering study. • Key objectives of the preliminary engineering study are to; – Develop a project layout; – Complete initial mine design & production schedule

  20. Slide 20: Preliminary Engineering Timetable

    Slide 20: Preliminary Engineering Timetable

    Preliminary Engineering Timetable 20

  21. Slide 21: Possible Project Layout

    Slide 21: Possible Project Layout

    Possible Project Layout Port Resource Concentrator 21

  22. Slide 22: Environmental Approvals

    Slide 22: Environmental Approvals

    Environmental Approvals • URS retained to oversee preparation & approval of environmental and social impact assessment (ESIA); • Scoping document (issues identification) now complete; • Base line flora and fauna surveys to commence in early May following recent rains. 22

  23. Slide 23: Native Title

    Slide 23: Native Title

    Native Title • Single claimant group to negotiate with; • Relationship established with management team following recent Heritage clearances; • Future Acts negotiations pending further project definition. 23

  24. Slide 24: Next Steps

    Slide 24: Next Steps

    Next Steps • Recommence RC drilling in April, diamond drilling in June; • Finalise resource update; • First pass open pit mining studies; • Review port options study and further develop preferred option(s); • Commence preliminary engineering study and develop project capital and operating cost estim

  25. Slide 25: Summary

    Slide 25: Summary

    Summary • Location - 10km’s from Coast & deep water; • Significant infrastructure available (power, road, water and populated areas); • Substantial mineralised system with significant upside; • Emerging understanding of geology & controls to mineralisation. 25

Source: Internet Archive copy of capelam.com.au