Alacer Gold — Scotiabank Mining Conference 2016
23 slides from Alacer Gold's conference presentation, Dec 7, 2016

Slide 1: Advancing Our Organic Growth Strategy
Advancing Our Organic Growth Strategy Rod Antal President & Chief Executive Officer Scotiabank Mining Conference December 7, 2016 TSX: ASR / ASX: AQG / 1

Slide 2: Cautionary Statements
Cautionary Statements Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking information”) within the meaning of

Slide 3: Advancing Our Strategy
Advancing Our Strategy Turkey Regional Exploration delivers organic growth through Gediktepe PFS Çakmaktepe drilling in Çöpler District confirms potential to add oxide production in 2018 - Maiden Resource in Q4 2016 Sulfide Project construction full- steam ahead Çöpler oxides generate cash f

Slide 4: Çöpler Sulfide Expansion Project Construction Underway
Çöpler Sulfide Expansion Project Construction Underway Foundations for critical path progressing rapidly First structural steel erected Project costs of $114M incurred as of September 30 Project remains on budget at $744M All major equipment purchase orders complete TSX: ASR / ASX: AQG / 4

Slide 5: Çöpler Sulfide Expansion Project
Çöpler Sulfide Expansion Project POX Building & Decant Thickener Pedestals Earthworks, including Mechanically Stabilized Earth Wall substantially complete Approximately 12,000m3 of concrete poured (30%) Construction Camp Camp construction progressing, with over 600 beds available Oxygen plan

Slide 6: Sulfide Project Provides Substantial Growth with Significant Margins
Çöpler Sulfide Expansion Project Pressure Oxidation Building Sulfide Project Provides Substantial Growth with Significant Margins Total production of 4M ozs1 over the remaining +20 year mine life Average life-of-mine Total Cash Costs2 of $570/oz and AISC2 of $645/oz Sulfide production3 over th

Slide 7: Çöpler District: Rapid Development Potential
Çöpler District Rapid Development Potential Oxide targets identified within 5-7km of Çöpler Mine Potential to add oxide production within two years from existing Çöpler infrastructure Step-out drilling continues to the north and south Deliver maiden resource by end of 2016 TSX: ASR / ASX: AQ

Slide 8: Çöpler District - Çakmaktepe North Prospect
Çöpler District - Çakmaktepe North Prospect Çakmaktepe North1 has become the priority target in the Çöpler District with potential to add oxide production in 2018 Gossan hosted mineralization occurring along ophiolite, metasediment, diorite and limestone contacts Domain is over 40m wide and po

Slide 9: Gediktepe Project Delivers Organic Growth
Gediktepe Project Delivers Organic Growth PFS defined Project as technically and economically viable Alacer will own 50% with JV Partner Lidya Mining1 Life-of-mine payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 780M lbs of zinc2 Life-of-mine production >12 ye

Slide 10: Gediktepe Production Profile and Project Metrics
Gediktepe Project Gediktepe Production Profile (100% Basis) Life-of-Mine Project Metrics1 (100% Basis) 250 Pre-production capital $120M Additional capital for sulfide plant $126M 200 Gold Equivalent Ounce2 (000 oz) Project payback 2.5 years 150 After-tax free cash flow $745M C22 per oz AuEq3 $613 10

Slide 11: Advancing Our Strategy
Advancing Our Strategy Çöpler oxide production has provided foundation for growth Sulfide Project construction advancing rapidly Maiden resource by end of 2016 for Çakmaktepe and Bayramdere Gediktepe is progressing into detailed study phase TSX: ASR / ASX: AQG / 11

Slide 12: Contact
Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 12

Slide 13: Appendix
Appendix TSX: ASR / ASX: AQG / 13

Slide 14: Company Snapshot
Company Snapshot Simple Capital Structure Corporate / Asset Location Market Cap C$700M Corporate Head Office Denver, Colorado Shares on issue 292M Turkey Fully Diluted 295M Project Turnover 1.5M shares/day Office Turkey Office Cash US$254M at 9/30/16 Debt Nil Finance Facility $350M1 1 Advances under

Slide 15: Corporate Structure
Corporate Structure 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV Çöpler Gold Mine Gediktepe Certain Turkey Çöpler District Licenses Regional Exploration 5 Projects Turkey 3 Projects Certain Çöpler Regional District Licenses Exploration 6 Projects 9 Projects Strong Turkish

Slide 16: 2016 Highlights
2016 Highlights Strategic Operational Financial Sulfide Project advancing on Produced 85,175 gold ozs Cash of $254M at budget, site works ramping up Guidance revised to September 30, 2016 Foundations for Sulfide Project 115,000 -125,000 ozs Operating cash flows of critical path areas pro

Slide 17: Çöpler Geology – Plan of Deposit
Çöpler Geology – Plan of Deposit TSX: ASR / ASX: AQG / 17

Slide 18: Çöpler Mineral Resources
Çöpler Mineral Resources Mineral Resources Statement for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Material Tonnes Au Contained Au Gold Cut-off Grade (g/t) Resources Category Material Ag (g/t) Cu (%) Type (x1000) (g/t) Ounces Measured - - - - - Indicated 24,959 1.04 3.19 0.13 836,000

Slide 19: Çöpler Mineral Reserves Increased
Çöpler Mineral Reserves Increased Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Mineral Reserves Contained Au Recoverable Au Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Category Material Ounces Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 17,836 1.1

Slide 20: Gediktepe Project Site
Gediktepe Project Site Oxide Zone Plant Area Main Zone ( North ) TSX: ASR / ASX: AQG / 20

Slide 21: Gediktepe Long Drill Section Looking NW
Gediktepe Long Drill Section Looking NW See Alacer announcements “Alacer Announces Exploration Results in Turkey”, dated September 14, 2014 and February 24, 2014, on the Corporation’s website at www.alacergold.com, on SEDAR at www.sedar.com or on ASX at www.asx.com.au. TSX: ASR / ASX: AQG / 21

Slide 22: Gediktepe Mineral Resources
Gediktepe Mineral Resources Mineral Resources Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Head Grades Contained Metal Material Type NSR Cutoff Tonnages Au Ag Cu Zn Au Ag Cu Zn Classification $/t ktonnes gm/t gm/t % % koz koz klb klb Oxides Measured $11.70 1,722 2.645 66.5 0

Slide 23: Gediktepe Mineral Reserves
Gediktepe Mineral Reserves Mineral Reserves Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Cutoff Oxide Mineral Reserves Payable Metal Classification NSR Oxide Gold Silver Copper Zinc Gold Silver Copper Zinc $/Tonne Ktonnes gm/t gm/t % % Kozs Kozs Mlbs Mlbs Proven 15.16 1,456
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017