Alacer Gold Corp

Alacer Gold — Scotiabank Mining Conference 2016

23 slides from Alacer Gold's conference presentation, Dec 7, 2016

  1. Slide 1: Advancing Our Organic Growth Strategy

    Slide 1: Advancing Our Organic Growth Strategy

    Advancing Our Organic Growth Strategy Rod Antal President & Chief Executive Officer Scotiabank Mining Conference December 7, 2016 TSX: ASR / ASX: AQG / 1

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking information”) within the meaning of

  3. Slide 3: Advancing Our Strategy

    Slide 3: Advancing Our Strategy

    Advancing Our Strategy  Turkey Regional Exploration delivers organic growth through Gediktepe PFS  Çakmaktepe drilling in Çöpler District confirms potential to add oxide production in 2018 - Maiden Resource in Q4 2016  Sulfide Project construction full- steam ahead  Çöpler oxides generate cash f

  4. Slide 4: Çöpler Sulfide Expansion Project Construction Underway

    Slide 4: Çöpler Sulfide Expansion Project Construction Underway

    Çöpler Sulfide Expansion Project Construction Underway  Foundations for critical path progressing rapidly  First structural steel erected  Project costs of $114M incurred as of September 30  Project remains on budget at $744M  All major equipment purchase orders complete TSX: ASR / ASX: AQG / 4

  5. Slide 5: Çöpler Sulfide Expansion Project

    Slide 5: Çöpler Sulfide Expansion Project

    Çöpler Sulfide Expansion Project POX Building & Decant Thickener Pedestals  Earthworks, including Mechanically Stabilized Earth Wall substantially complete  Approximately 12,000m3 of concrete poured (30%) Construction Camp  Camp construction progressing, with over 600 beds available  Oxygen plan

  6. Slide 6: Sulfide Project Provides Substantial Growth with Significant Margins

    Slide 6: Sulfide Project Provides Substantial Growth with Significant Margins

    Çöpler Sulfide Expansion Project Pressure Oxidation Building Sulfide Project Provides Substantial Growth with Significant Margins  Total production of 4M ozs1 over the remaining +20 year mine life  Average life-of-mine Total Cash Costs2 of $570/oz and AISC2 of $645/oz  Sulfide production3 over th

  7. Slide 7: Çöpler District: Rapid Development Potential

    Slide 7: Çöpler District: Rapid Development Potential

    Çöpler District Rapid Development Potential  Oxide targets identified within 5-7km of Çöpler Mine  Potential to add oxide production within two years from existing Çöpler infrastructure  Step-out drilling continues to the north and south  Deliver maiden resource by end of 2016 TSX: ASR / ASX: AQ

  8. Slide 8: Çöpler District - Çakmaktepe North Prospect

    Slide 8: Çöpler District - Çakmaktepe North Prospect

    Çöpler District - Çakmaktepe North Prospect  Çakmaktepe North1 has become the priority target in the Çöpler District with potential to add oxide production in 2018  Gossan hosted mineralization occurring along ophiolite, metasediment, diorite and limestone contacts  Domain is over 40m wide and po

  9. Slide 9: Gediktepe Project Delivers Organic Growth

    Slide 9: Gediktepe Project Delivers Organic Growth

    Gediktepe Project Delivers Organic Growth  PFS defined Project as technically and economically viable  Alacer will own 50% with JV Partner Lidya Mining1  Life-of-mine payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 780M lbs of zinc2  Life-of-mine production >12 ye

  10. Slide 10: Gediktepe Production Profile and Project Metrics

    Slide 10: Gediktepe Production Profile and Project Metrics

    Gediktepe Project Gediktepe Production Profile (100% Basis) Life-of-Mine Project Metrics1 (100% Basis) 250 Pre-production capital $120M Additional capital for sulfide plant $126M 200 Gold Equivalent Ounce2 (000 oz) Project payback 2.5 years 150 After-tax free cash flow $745M C22 per oz AuEq3 $613 10

  11. Slide 11: Advancing Our Strategy

    Slide 11: Advancing Our Strategy

    Advancing Our Strategy  Çöpler oxide production has provided foundation for growth  Sulfide Project construction advancing rapidly  Maiden resource by end of 2016 for Çakmaktepe and Bayramdere  Gediktepe is progressing into detailed study phase TSX: ASR / ASX: AQG / 11

  12. Slide 12: Contact

    Slide 12: Contact

    Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 12

  13. Slide 13: Appendix

    Slide 13: Appendix

    Appendix TSX: ASR / ASX: AQG / 13

  14. Slide 14: Company Snapshot

    Slide 14: Company Snapshot

    Company Snapshot Simple Capital Structure Corporate / Asset Location Market Cap C$700M Corporate Head Office Denver, Colorado Shares on issue 292M Turkey Fully Diluted 295M Project Turnover 1.5M shares/day Office Turkey Office Cash US$254M at 9/30/16 Debt Nil Finance Facility $350M1 1 Advances under

  15. Slide 15: Corporate Structure

    Slide 15: Corporate Structure

    Corporate Structure 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV Çöpler Gold Mine Gediktepe Certain Turkey  Çöpler District Licenses  Regional Exploration 5 Projects Turkey 3 Projects Certain Çöpler Regional District Licenses Exploration 6 Projects 9 Projects Strong Turkish

  16. Slide 16: 2016 Highlights

    Slide 16: 2016 Highlights

    2016 Highlights Strategic Operational Financial  Sulfide Project advancing on  Produced 85,175 gold ozs  Cash of $254M at budget, site works ramping up  Guidance revised to September 30, 2016  Foundations for Sulfide Project 115,000 -125,000 ozs  Operating cash flows of critical path areas pro

  17. Slide 17: Çöpler Geology – Plan of Deposit

    Slide 17: Çöpler Geology – Plan of Deposit

    Çöpler Geology – Plan of Deposit TSX: ASR / ASX: AQG / 17

  18. Slide 18: Çöpler Mineral Resources

    Slide 18: Çöpler Mineral Resources

    Çöpler Mineral Resources Mineral Resources Statement for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Material Tonnes Au Contained Au Gold Cut-off Grade (g/t) Resources Category Material Ag (g/t) Cu (%) Type (x1000) (g/t) Ounces Measured - - - - - Indicated 24,959 1.04 3.19 0.13 836,000

  19. Slide 19: Çöpler Mineral Reserves Increased

    Slide 19: Çöpler Mineral Reserves Increased

    Çöpler Mineral Reserves Increased Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2015) (100% Basis) Mineral Reserves Contained Au Recoverable Au Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Category Material Ounces Ounces Proven - Oxide In-Situ - - - - - - Probable - Oxide In-Situ 17,836 1.1

  20. Slide 20: Gediktepe Project Site

    Slide 20: Gediktepe Project Site

    Gediktepe Project Site Oxide Zone Plant Area Main Zone ( North ) TSX: ASR / ASX: AQG / 20

  21. Slide 21: Gediktepe Long Drill Section Looking NW

    Slide 21: Gediktepe Long Drill Section Looking NW

    Gediktepe Long Drill Section Looking NW See Alacer announcements “Alacer Announces Exploration Results in Turkey”, dated September 14, 2014 and February 24, 2014, on the Corporation’s website at www.alacergold.com, on SEDAR at www.sedar.com or on ASX at www.asx.com.au. TSX: ASR / ASX: AQG / 21

  22. Slide 22: Gediktepe Mineral Resources

    Slide 22: Gediktepe Mineral Resources

    Gediktepe Mineral Resources Mineral Resources Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Head Grades Contained Metal Material Type NSR Cutoff Tonnages Au Ag Cu Zn Au Ag Cu Zn Classification $/t ktonnes gm/t gm/t % % koz koz klb klb Oxides Measured $11.70 1,722 2.645 66.5 0

  23. Slide 23: Gediktepe Mineral Reserves

    Slide 23: Gediktepe Mineral Reserves

    Gediktepe Mineral Reserves Mineral Reserves Statement for the Gediktepe Deposit (As of June 1, 2016) (100% Basis) Cutoff Oxide Mineral Reserves Payable Metal Classification NSR Oxide Gold Silver Copper Zinc Gold Silver Copper Zinc $/Tonne Ktonnes gm/t gm/t % % Kozs Kozs Mlbs Mlbs Proven 15.16 1,456

Source: Internet Archive copy of alacergold.com

More decks from Alacer Gold Corp