Vancouver, BC - Sponsored content disseminated on behalf of West Red Lake Gold.
On April 13, 2026, West Red Lake Gold Mines (TSXV: WRLG) (OTCQB: WRLGF) announced drill results from the Austin 904 Complex at its Madsen Mine Project in Ontario, Canada.
Situated at the bottom of Main Austin, starting at approximately 650 metres depth, the 904 Complex is a high-grade panel of mineralization, about 200 square metres, the equivalent of seven regulation NFL football fields.
This area has seen very little mining historically, leaving the main mineralized zone mostly intact. That is expected to allow for larger stopes and more efficient development and extraction from this high-grade area.
'I want to provide a little bit of background information on the news we just put out today,' stated Robinson in the YouTube explainer video. 'We're announcing some very exciting drill results from the Lower Austin area, and a new area that we've been defining, called the 904 Complex.'
'These results come from our definition drilling programs that are ongoing at Madsen. The holes were drilled from the 13 level in the Madsen Mine, which is at approximately 650 meters depth. The deposit was mined, historically, down to around 1,300 meters depth.'
'We find ourselves at about the halfway point,' continued Robinson. 'We're starting to tap into some high tonnage, less remnant areas of the mine. That's one of the things about the 904 Complex that is so important. It's essentially a 200 by 200-metre panel of gold mineralization that remains mostly intact.'
Long Section showing drill highlights from current press release in Austin 904 Complex with (grade x thickness) at = 25 (g/t Au x m). Interval length denotes downhole core length. True thickness has not been calculated, but is expected to be = 70% of downhole length based on intercept angles observed in the drill core.
Mineral resources are estimated at a cut-off grade of 3.38 g/t Au and a gold price of US1,800/oz. Please refer to the technical report entitled 'NI 43-101 Technical Report and Prefeasibility Study for the Madsen Mine, Ontario, Canada', prepared by SRK Consulting (Canada) Inc. and dated January 7, 2025 (the 'Madsen Report'). A full copy of the Madsen Report is available on the Company's website and on SEDAR+ at www.sedarplus.ca.
'Most of the mining that we do at Madsen occurs in proximity to remnant workings and historic development,' stated Robinson in the explainer video. 'Having access to a large area of un-mined mineralization will benefit us greatly. We've only drilled 30 meters down into the 904 complex panel. We still have roughly 170 meters of vertical extent to continue defining this high potential area.'
'We plan to keep two drills turning in the 904 Complex for the remainder of 2026, providing continuous news flow and updates as they become available,' concluded Robinson.
WRLG declared commercial production at the mine on January 1, 2026. Since then, production has continued, and the price of gold has increased from US$4,330 per ounce to US$4,750 per ounce.
Contact:
Email: [email protected]
Tel: 1-604-569-5559
Email: [email protected]
Jasmin Rollins
Email: [email protected]
Tel: 1-807-749-3325
(C) 2026 Electronic News Publishing, source ENP Newswire
