Ticker Symbol: VAL-TSX Venture
VANCOUVER, Feb. 8 /CNW/ - ValGold Resources Ltd. ("ValGold") reports that
to date the first 11 diamond drill holes have been completed totalling
3,320 meters ("m") at its 100%-owned Garrison Gold Project in northeast
Ontario. This drill program is ValGold's first on the property and is to
consist of 25 diamond drill holes totalling approximately 11,000 meters of
which approximately 1,500 meters in 7 holes were drilled prior to the end of
2005. Assays have been received for the first 9 holes.
The drilling during the current stage is planned to in-fill and extend to
depth the J.P. gold zone situated in the central part of the Garrison
property. Since the resumption of the program in 2006 each drill hole has
achieved its intended target and all holes report multiple intersections with
significant gold values. Some of the notable high-grade intersections were
achieved in:
- DDH G06-01 with an average assay of 4.96 grams per tonne gold
("g/T Au") over a width of 7.80m (0.14 ounces of gold per short ton
(oz/t Au) over 25.6 ft) that included an interval of 8.30 g/T Au over
a core length of 2.0m (0.24 oz/t Au over 6.6 ft); and;
- DDH G06-02 intersecting the best grade to date with 7.4 m averaging
15.91 g/T Au (24.3 ft averaging 0.46 oz/t Au) within which 1.0 m
averaged 84.0 g/T Au (3.3 ft averaging 2.45 oz/t Au).
The width of the above intersections is the approximate true width of the
mineralization. Check assays are being completed on the very high-grade
samples to ensure accuracy and to determine if the presence of abundant coarse
gold may have resulted in erratic assay results. All drill intersections
grading greater than 1.0 g/T Au for the first nine holes are reported in the
table at the end of this release and the locations of the collar sites
together with drill sections, trench geology and sampling maps will be made
available soon on the ValGold website: www.valgold.com.
Project Summary
The Garrison gold property is located 40 kilometres (km) north of the
Town of Kirkland Lake, 100 km east of Timmins and 8 km west of and on strike
with Newmont Mining Corp's Holloway and Holt-McDermott gold mines. Access to
the property is by Ontario highway 101 that runs along the north boundary of
the property. The mining leases cover approximately 4 km of the famous Destor
Porcupine Fault Zone ("DPFZ") and a major splay, the Munro Fault Zone ("MFZ").
The gold mineralization on the property occurs as sulphide-rich bodies
within the two major fault zones, and within the intervening Timiskaming
sediments associated with quartz-pyrite vein stockworks. Sulphide
mineralization within the MFZ forms a series of five high-grade shoots that
occur near the footwall of the fault. In a prospectus dated January 19, 2001,
and filed on Sedar, Aurado Exploration Limited reported that previous
operators completed a total of 199 drill holes testing the zones over the
1.7 km long strike length of the fault zone and to a depth of 300m (1,000 ft).
The individual mineralized shoots are estimated to be up to 300m (1,000 ft) in
strike length, average 3.35m (11 ft) in thickness and contain gold associated
with albite, sericite and pyrite alteration.
An advanced underground exploration program was initiated on the J.P.
gold zone in October 1995, when site operations began with the excavation of
the decline portal and the establishment of ore and waste pads. The
underground development included a 12 x 14-foot, 18-20-degree decline
excavated to the 476 level, and connected to the level with a ventilation
raise from the 350-level to surface. The gold mineralization was removed by
drifting and benching on 6 sub-levels. The first gold-albite-sericite-pyrite
test samples were shipped to the Noranda custom mill and smelter complex in
September 1996 and by the end of March 1997 approximately 56,000 tons
(50,475 tonnes) were shipped that had an average grade of 0.243 oz/t
(8.33 g/T) Au.
Mr. Tom Pollock, P.Geo. is ValGold's Vice-President, Exploration, who is
the Qualified Person for the project, and is responsible for all of the
technical reporting in compliance with NI 43-101. Mr. Pollock has instituted
and is responsible for ValGold's program of Quality Control and Assurance
("QC/QA"), using assay control samples and duplicates. Swastika Labs is a
recognized assay laboratory located in Swastika, Ontario and it carried out
the assay work the recent drill program. All samples were fire assayed
utilizing industry standard procedures. All sampled core was split in a secure
facility in Ontario and hand delivered to the laboratory by the Company
geologist. The balance of the split core is stored for record purposes at a
secure site near the Garrison property.
For further information on the Company and its projects, visit our
website at www.valgold.com.
Stephen J. Wilkinson
President & Chief Executive Officer
No regulatory authority has approved or disapproved the
information contained in this news release.
Table of the Garrison Gold Project significant drill intercepts for the
first 9 drill holes where sample intervals graded 1.0 g/T Au or greater. The
width of the intersections is the approximate true width of the
mineralization.
<<
-------------------------------------------------------------------------
Drill Gold Zone From To Metres Feet Gold Gold Visible
Hole (m) (m) g/T oz/t Gold
No.
-------------------------------------------------------------------------
G05-03 J.D. 237.00 244.00 7.00 22.97 1.27 0.04
G05-04 J.D. 238.00 238.30 0.30 0.98 1.62 0.05
G05-05 J.D./J.P. 129.00 133.00 4.00 13.12 1.17 0.03
G05-06 J.D./J.P. 110.00 111.00 1.00 3.28 1.07 0.03
G05-06 J.D./J.P. 121.00 127.10 6.10 20.01 1.00 0.03
G05-07 J.D./J.P. 11.00 11.50 0.50 1.64 4.08 0.12
G05-07 J.D./J.P. 164.42 170.00 5.58 18.31 3.81 0.11
G05-07 J.D./J.P. 173.00 176.00 3.00 9.84 1.01 0.03
G05-07 J.D./J.P. 185.00 186.00 1.00 3.28 1.80 0.05
G05-07 J.D./J.P. 191.00 192.00 1.00 3.28 1.25 0.04
G06-01 J.P. 140.00 143.00 3.00 9.84 1.09 0.03
G06-01 J.P. 223.00 223.70 0.70 2.30 8.54 0.25
G06-01 J.P. 228.00 232.10 4.10 13.45 2.72 0.08
Including 231.44 232.10 0.66 2.17 7.03 0.21
G06-01 J.P. 237.00 244.80 7.80 25.59 4.96 0.14
Including 240.00 242.00 2.00 6.56 8.30 0.24
G06-01 J.P. 286.10 288.10 2.00 6.56 1.36 0.04
G06-02 J.P. 282.60 290.00 7.40 24.28 15.91 0.46 Yes
Including 288.00 289.00 1.00 3.28 84.00 2.45 Yes
G06-02 J.P. 338.00 341.00 3.00 9.84 1.40 0.04
-------------------------------------------------------------------------
>>
ValGold intersects high grade gold intervals in its initial drill program at Garrison Gold Project, Ontario
Story so far
Earlier from ValGold Resources
- ValGold files Technical Report on gold and platinum projects in Bolivar State, Venezuela
- ValGold's initial independent mineral resource for the Tower Mountain Gold Property, Ontario
- TSX Venture Exchange - Trade Resumption - ValGold Resources Ltd. - VAL
- TSX Venture Exchange - Trading Halt - ValGold Resources Ltd. - VAL
- ValGold to acquire suite of gold and platinum projects in Bolivar State, Venezuela
Later from ValGold Resources
- ValGold shareholders approve option to acquire Honnold Corp's suite of gold and platinum
- ValGold Resources options Hunter Gold Mine to Brigadier Gold Limited
- ValGold drilling adds to the J-P Zone, Garrison Gold Project, Ontario
- ValGold completes 11,000 meter program & adds second drill to the Garrison Gold Project, Ontario
- ValGold Retains Laney Stolle for Investor and Corporate Communications
Follow ValGold Resources into a list and get an email when it puts out news.
Follow ValGold Resources