ValGold Resources LtdTSXV: VAL

ValGold commences drilling at the Garrison gold property, Ontario

· Issued by ValGold Resources Ltd via CNW
Ticker Symbol: VAL-TSX Venture

VANCOUVER, Nov. 17 /CNW/ - ValGold Resources Ltd. ("ValGold") is pleased
to announce that as of today it has commenced the winter drill program at its
100%-owned Garrison Gold Project in northeast Ontario. This is ValGold's first
drill program on the property and is to consist of 25 diamond drill holes
totalling approximately 11,000 meters of which 1,000 meters are to be drilled
prior to year-end.
The Garrison gold property is located 40 kilometres (km) north of the
Town of Kirkland Lake, 100 km east of Timmins and 8 km west of and on strike
with Newmont Mining Corp's Holloway and Holt-McDermott gold mines. Access to
the property is by Ontario highway 101 that runs along the north boundary of
the property. Approximately 4 km of the famous Destor Porcupine Fault Zone
("DPFZ") and a major splay, the Monro Fault Zone ("MFZ") are covered by the
mining leases.
The gold mineralization on the property occurs as sulphide-rich bodies
within the two major fault zones and within the intervening Timiskaming
sediments associated with quartz-pyrite vein stockworks. Sulphide
mineralization within the MFZ forms a series of five high-grade shoots that
occur near the footwall of the fault. A total of 199 drill holes have tested
the zones over the 1.7 km long strike length of the fault zone and to a depth
of 300m (1,000 ft). The individual mineralized shoots are estimated to be up
to 300m (1,000 ft) in strike length, average 3.35m (11 ft) in thickness and
contain gold associated with albite + sericite + pyrite alteration.
ValGold's initial four drill holes are designed to test the J.D. zone
located within the MFZ. The J.D. zone is on-strike with and immediately to the
west of the Garrison main area of gold mineralization, the J.P. zone. Drilling
by previous operators intersected good gold grades within the zone that were
near surface and over significant widths. For example, N88-47 cut 0.34 opt Au
over 50 ft (11.6 g/t over 15m) at a depth of approximately 200 ft (61m).      
N89-145 intersected the zone 400 ft (122m) down plunge to the west and cut
0.13 opt over 34 feet (4.5 g/t over 10.4m). A third high grade intersection
was encountered another 400 ft (122m) to the east of N89-145 in N88-74 which
cut 0.98 opt over 6 feet (33.6 g/t over 1.8m) within an interval of 0.14 opt
over 44 feet (4.8 g/t over 13m). In addition, the quartz + albite alteration
and the gold + sulphide mineralization appear to be strengthening with depth
and to the west.
Mr. Tom Pollock, P.Geo., ValGold's Vice President, Exploration, is the
qualified person for the project, and is responsible for all of the technical
reporting in compliance with NI 43-101.
For further information on the Company and its projects, visit our
website at www.valgold.com.

                        Stephen J. Wilkinson
                 President & Chief Executive Officer


 No regulatory authority has approved or disapproved the information
                   contained in this news release.


ValGold Resources Ltd on 6ix

Story so far

Earlier from ValGold Resources

Later from ValGold Resources

All ValGold Resources news releases