Ticker Symbol: VAL-TSX Venture
VANCOUVER, June 1 /CNW/ - ValGold Resources Ltd. ("ValGold") is pleased
to report that its winter drill program for the Tower Mountain project has
been completed and ValGold has received all assay results. This seventh
drilling campaign was completed at the end of March 2005, and was focused on
further defining the extent of gold mineralization at the U-V zone and the
recently discovered 4/36 zone. Fourteen drill holes, numbered DDH05-37 to
DDH05-50, totaling 3,523 meters (m) of core, were completed.
<<
Highlights of the drilling include:
-------------------------------------------------------------------------
Drill Hole No. Gold From To Meters Feet Gold Gold
Zone (m) (m) g/t oz/t
-------------------------------------------------------------------------
DDH 05-38 4/36 16.5 24.0 7.5 24.6 5.00 0.15
Including 18.0 19.5 1.5 4.9 16.00 0.47
And 21.0 22.5 1.5 4.9 3.19 0.09
DDH 05-40 U-V 166.5 178.5 12.0 39.3 1.75 0.05
Including 166.5 168.0 1.5 4.9 9.45 0.28
DDH 05-44 U-V 103.5 124.5 21.0 68.9 0.77 0.02
DDH 05-47 U-V 232.5 234.0 1.5 4.9 4.43 0.13
DDH 05-49 U-V 225.0 226.5 1.5 4.9 6.59 0.19
-------------------------------------------------------------------------
All of the holes intersected broad areas of alteration and
mineralization. Many of the drill holes intersected multiple intervals of
greater than 0.5 grams/tonne gold ("g/t Au"), confirming the extent and
strength of the areas of gold mineralization. For example, DDH 05-49 averaged
approximately 240 ppb (parts per billion) gold from 16.5m to 255.0m within
which eight intersections returned assays of greater than 500 ppb Au over 1.5m
or greater core length. An updated drill hole location plan and a table that
summarizes the principal zones drilled within the Tower Mountain property are
being made available on ValGold's website, www.valgold.com.
ValGold's exploration in the Matawin gold belt to date has centered on
its Tower Mountain property. The property is situated immediately south of the
Trans-Canada Highway approximately 40 kilometers west of Thunder Bay in
northwestern Ontario. Since initiation of its exploration work in the fall of
2002, ValGold has completed 67 diamond drill holes within the Tower Mountain
property, producing an aggregate of 16.6 kilometers of core.
Also, several trenches have exposed principal U-V zone and several other
areas of prospective gold mineralization. One such prospective area, the new
A-D zone, has returned significant drill intersections in four diamond drill
holes to date (see ValGold news of January 18th 2005). The A-D zone occurs
about 1,200m south east of the U-V mineralization.
The style of gold mineralization within the A-D zone consists of a
low-grade, broad zone mineralized with disseminated pyrite and gold. Within
the broad low-grade area are higher-grade intervals such as the 1.5m of core
that returned a grade of 21.14 g/t Au (0.62 oz/t gold over 4.9 feet).
The new 4/36 zone was intersected near-surface in drill hole DDH04-36
that was collared approximately 450m southwest of the U-V zone. The 4/36 zone
has a mineralization style that is bimodal and composed of a broad lower grade
gold zone, occurring over significant widths with an associated high-grade
section. In this instance, the 4/36 high-grade intersection returned an
average assay of 50.03 g/t Au over a width of 1.5m (approximately 1.50 oz/t
gold across 4.9 feet).
Mr. Tom Pollock, P.Geo., is ValGold's Vice President of Exploration and
is the qualified person for the exploration and development of the Tower
Mountain Project. Mr. Pollock will be responsible for all of the technical
reporting in compliance with National Instrument 43-101, "Standard Disclosure
for Mineral Projects".
For further information on the Company's gold and base metal projects,
visit our website, www.valgold.com.
Stephen J. Wilkinson
President & Chief Executive Officer
No regulatory authority has approved or disapproved the information
contained in this news release
Highlights of Tower Mountain Drill Programs To Date
-------------------------------------------------------------------------
Total Program's Top Program's Top
Drill Holes No. of High Grade Low Grade
Program Drilled Meters Intersection Intersection
-------------------------------------------------------------------------
Fall 2002 DDH02-01 to 05 1,042 23.17 g/t Au/1.5m 1.05 g/t Au/73.5m
in DDH02-2 in DDH02-3
Spring 2003 DDH03-01 to 05 1,085 11.77 g/t Au/3.0m 1.01 g/t Au/22.5m
in DDH03-2 in DDH03-3
Fall 2003 DDH03-06 to 12 1,499 19.76 g/t Au/1.5m 0.5 g/t Au/58.5m
in DDH03-11 in DDH03-8
Winter 2004 DDH04-01 to 10 2,601 160.0 g/t Au/1.5m 1.76 g/t Au/84.0m
in DDH04-6 in DDH04-9
Summer 2004 DDH-04-11 to 23 3,450 68.91 g/t Au/0.2m 1.93 g/t Au/37.5m
in DDH04-19 in DDH04-15
Fall 2004 DDH-04-24 to 36 3,418 50.03 g/t Au/1.5m 0.94 g/t Au/106.5m
in DDH04-36 in DDH04-31
Winter 2005 DDH-05-37 to 50 3,523 16.00 g/t Au/1.5m 0.77 g/t Au/21.0m
in DDH05-38 in DDH05-44
-------------------------------------------------------------------------
Totals 67 Holes 16,618
-------------------------------------------------------------------------
>>
ValGold completes 3,500 meter winter 2005 program at its Tower Mountain gold property, NW Ontario
Later from ValGold Resources
- ValGold purchases advanced Garrison gold project, Kirkland Lake area of Ontario
- ValGold clarifies historical resources at Garrison Gold Project, Kirkland Lake area of Ontario
- ValGold options uranium property in northwestern Manitoba
- ValGold commences drilling at the Garrison gold property, Ontario
- ValGold closes flow-through private placement financing
Follow ValGold Resources into a list and get an email when it puts out news.
Follow ValGold Resources