Significant Extension to Highway Zone Confirmed
Filed with ASX · · 14 pages · English
Odyssey Gold Limited (ASX:ODY) (“Odyssey” or “Company”) is pleased to announce progress results from the Tuckanarra Project. HIGHLIGHTS • Results are reported for six holes recently drilled at the Highway Zone • The eastern extension of the Highway Zone has been intersected with results including: o 4m @ 7.1g/t Au from 176m (CBRC0058) o 16m @ 3.3g/t Au from 184m within a broader interval of 44m @
Earlier from Odyssey Gold
- March 2022 Quarterly Report
- Significant Visible Gold Intersected in Diamond Drilling
- High-Grade Assay Results & Drilling Under Way at Tuckanarra
- December 2021 Quarterly Report
- High-Grade Results Continue at Cable-Bollard
Later from Odyssey Gold
- Excellent Results Continue at the Highway Zone
- Further High-Grade Gold Mineralisation Intersected
- Bottle Dump Target Yields High Grade Result
- Outstanding High-Grade Gold Result from the Maybelle Deposit
- June 2022 Quarterly Report
Follow Odyssey Gold into a list and get an email when it puts out news.
Follow Odyssey Gold