Excellent Results Continue at the Highway Zone
Filed with ASX · · 18 pages · English and French
Odyssey Gold Limited (ASX:ODY) (“Odyssey” or “Company”) is pleased to announce excellent ongoing drill results from the Tuckanarra Project. HIGHLIGHTS • Results are reported for five holes recently drilled at the Tuckanarra Project • The Highway Zone has been intersected in two holes with results including: CBRC0056 5m @ 3.8g/t Au (170m) 13m @ 3.7g/t Au (180m) 11m @ 7.8g/t Au (199m) including 6m @
Story so far
Earlier from Odyssey Gold
- Significant Extension to Highway Zone Confirmed
- March 2022 Quarterly Report
- Significant Visible Gold Intersected in Diamond Drilling
- High-Grade Assay Results & Drilling Under Way at Tuckanarra
- December 2021 Quarterly Report
Later from Odyssey Gold
- Further High-Grade Gold Mineralisation Intersected
- Bottle Dump Target Yields High Grade Result
- Outstanding High-Grade Gold Result from the Maybelle Deposit
- June 2022 Quarterly Report
- Outstanding Shallow Intersection of 84m at 2.5g/t Gold
Follow Odyssey Gold into a list and get an email when it puts out news.
Follow Odyssey Gold