SIF 2025 FULL YEAR RESULTS
SIF 2025
FULL YEAR RESULTS
Factory delivering according to plan; ready for North Sea declaration ramp up
€48m normalised EBITDA exceeded guidance
Challenging market ahead but long-term optimism
Presenting today: introducing our new COO
Fred van Beers, CEO Pepijn Timmermans, COO
Boudewijn van Schaïk, CFOFull Year Results 2025 3
Key Messages
Safety remains our number 1 priority, followed by quality and then output volume |
Record contribution margin of € 1,001 per ton - total production of 176 Ktons in 2025 |
Successfully transitioning from the stabilization phase in the second half of 2025 to a more controlled production phase at the MV2 facility. Both MV2 and Roermond set for expected demand increase from 2028 onwards as seen in tender activity |
Market today is faced with delays in tender releases and FID. 2027-2028 demand will be low. EU Northsea summit declaration however underpins long term growth on the basis of demand for energy independence |
Committed orderbook and production output levels at both facilities underpin € 135m EBITDA guidance for 2026. Too early to forecast production and results for 2027 but we may face periods of lower activity in our production facilities |
Full Year Results 2025 4
Key Highlights 2025
Empire Wind 1 (54 monopiles, 73 Kton)- largest monopiles produced by Sif |
Maasvlakte II Facility ramp up delay was painful but is in control and shifting to production optimization in 2026 |
First Monopiles for Ecowende produced and installed |
Alignment with EU and member state policy makers, branches and industry partners that Offshore wind is essential for European energy independence. Measures in preparation to assure level playing field conditions for the supply chain. |
Full Year Results 2025 5