Shallow High-Grade Gold Confirms James Stage 1 Pit Potential
Filed with ASX · · 20 pages · English and French
Summary by 6ix AI
The results indicate strong grade continuity, supporting the proposed open pit design and the company's strategy for low-cost heap leach development. CEO Andrew Pumphrey highlighted the consistency of the gold mineralization and the progress towards near-term production. The announcement includes details on metallurgical testwork that shows promising gold recovery rates, further validating the project's potential.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from OzAurum Resources
- Strong High-Grade Gold Results at Mulgabbie North
- Quarterly Activities/App 5B Cash Flow Report - Correction
- Feasibility Progress Highlights Strong Development Pathway
- Mulgabbie North RC Drilling Advanced Metallurgical Testwork
- Mulgabbie North Gold Project - Feasibility Study Update
Later from OzAurum Resources
- Heap Leach Process Plant Secured for Mulgabbie Gold Project
- Feasibility Demonstrates Path to Low-Cost Gold Production
- High-Grade Gold Strengthens Stage 1 Open Pit Confidence
- Pause in Trading
- Trading Halt
Follow OzAurum Resources into a list and get an email when it puts out news.
Follow OzAurum Resources